Manufacturers’ Build-out and Start-up Dates

Find valuable build out and order bank information on popular fleet vehicles, consolidated into one easy to navigate location. Below you can click through any of the various manufacturers’ build-out and start-up dates for US cars and US trucks. Please be aware these dates change regularly.

Select a Manufacturer:

Audi | Buick | Cadillac | Chevrolet | Chrysler | Dodge | Ford | Genesis | GMC | Hyundai | Jeep | Lincoln | Nissan | RAM | Subaru | Toyota | Volkswagen

Manufacturer Updates Direct to Your Inbox

Sign up today to receive regular updates on order bank open dates, production startup updates, lead times and more direct to your inbox.

Audi

The following chart provides vehicle build-out and start-up dates for Audi. These updates change regularly and were last updated on November 1, 2019.

Model 2019 Order Banks Open 2019 Production Startup 2019 Lead Time 2019 Order Cutoff 2020 Order Banks Open 2020 Production Startup 2020 Lead Time 2020 Order Cutoff
CARS
A3 06/01/18 08/01/18 N/A TBD 05/31/19 07/08/19 10-14 WKS TBD
A4 06/01/18 08/01/18 N/A TBD 05/31/19 10/14/19 10-14 WKS TBD
A5 06/01/18 08/01/18 N/A TBD 06/28/19 11/04/19 10-14 WKS TBD
A6 TBD 06/26/18 N/A TBD 05/31/19 07/08/19 10-14 WKS TBD
A7 07/01/18 06/26/18 N/A TBD 05/31/19 07/08/19 10-14 WKS TBD
A8 05/01/18 07/03/18 N/A TBD 05/31/19 07/29/19 10-14 WKS TBD
S3 06/01/18 07/30/18 N/A TBD 05/31/19 TBD 10-14 WKS TBD
S6 07/01/18 07/25/18 N/A TBD 05/31/19 TBD 10-14 WKS TBD
S7 TBD TBD TBD TBD 05/31/19 TBD 10-14 WKS TBD
S8 TBD TBD TBD TBD 05/31/19 TBD 10-14 WKS TBD
R8 TBD TBD N/A TBD 05/31/19 TBD 10-14 WKS TBD
TRUCKS
A4 allroad 06/01/18 08/01/18 TBD TBD TBD TBD TBD TBD
Q3 Q1 2019 Q1 2019 TBD TBD 05/31/19 07/08/19 10-14 WKS TBD
Q5 06/01/18 09/01/18 TBD TBD 05/31/19 07/08/19 12-16 WKS TBD
Q7 06/01/18 07/02/18 TBD TBD 08/30/19 10/28/19 12-16 WKS TBD
Q8 TBD TBD TBD TBD 05/31/19 08/09/19 10-14 WKS TBD
Model 2019 Order Banks Open 2019 Production Startup 2019 Lead Time 2019 Order Cutoff 2020 Order Banks Open 2020 Production Startup 2020 Lead Time 2020 Order Cutoff

Buick

The following chart provides vehicle build-out and start-up dates for Buick. These updates change regularly and were last updated on November 1, 2019.

Model 2019 Fleet Final Order 2019 Final Production Date 2019 Lead Time in weeks 2020 Order Banks Open 2020 Production Startup 2020 Lead Time 2020 Final Order Due Date
CARS
Cascada 06/28/19 27-29 wks TBD TBD 27-29 wks TBD
LaCrosse 11/30/19 02/15/19 13-15 wks TBD TBD 12-14 wks TBD
Regal Sportback 03/21/19 07/12/19 21-23 wks 04/25/19 08/05/19 21-23 wks 7/9/2019
CROSSOVER
Enclave 03/21/19 06/14/19 9-11wks 04/25/19 06/17/19 9-11wks TBD
Encore 03/21/19 06/28/19 27-29 wks 04/25/19 07/01/19 27-29 wks TBD
Envision 12/20/18 04/26/19 24-26 01/31/19 05/06/19 24-26 TBD
Model 2019 Fleet Final Order 2019 Final Production Date 2019 Lead Time in weeks 2020 Order Banks Open 2020 Production Startup 2020 Lead Time 2020 Final Order Due Date

Cadillac

The following chart provides vehicle build-out and start-up dates for Cadillac. These updates change regularly and were last updated on November 1, 2019.

Model 2019 Fleet Final Order Due Dates 2019 Final Production Date 2019 Lead Time in weeks 2020 Order Banks Open 2020 Production Startup 2020 Lead Time 2020 Final Order Due Date
CARS
CT6 11/30/2018 8/2/2019 10-12 wks 5/23/2019 8/5/2019 9-11 weeks 8/22/2019
CTS 1/24/2019 4/17/2019 8-10 wks TBD TBD TBD TBD
SUVS & CROSSOVERS
Escalade 3/21/2019 6/22/2019 10-12 wks 5/9/2019 -w/o SEO content TBD - w/SEO content 6/24/2019 -w/o SEO content TBD - w/SEO content 15-17 weeks TBD
Escalade ESV 3/21/2019 6/22/2019 10-12 wks 5/9/2019 -w/o SEO content TBD - w/SEO content 6/24/2019 -w/o SEO content TBD - w/SEO content 15-17 weeks TBD
XT5 4/25/2019 7/27/2019 9-11 WKS 6/6/2019 8/5/2019 18-20 weeks TBD
XT4 3/18/2019 6/14/2019 9-11 WKS 4/25/2019 6/17/2019 15-17 weeks TBD
XT6 N/A N/A N/A 2/28/2019 5/31/2019 15-17 weeks TBD
Cadillac CT5 N/A N/A 6/20/2019 8/30/2019 14-16 weeks TBD
Model 2019 Fleet Final Order Due Dates 2019 Final Production Date 2019 Lead Time in weeks 2020 Order Banks Open 2020 Production Startup 2020 Lead Time 2020 Final Order Due Date

Chevrolet

The following chart provides vehicle build-out and start-up dates for Chevrolet. These updates change regularly and were last updated on November 1, 2019.

Model 2019 Final Fleet Order Due Date 2019 Final Production Date 2019 Lead Time in weeks 2020 Order Banks Open 2020 Production Startup 2020 Final Fleet Order Due Date 2020 Lead Time
CARS
Bolt 25/04/2019 07/30/19 9-11 WKS 06/06/19 07/31/19 TBD 16-18 WKS
Camaro Coupe & Convertible (requires pre-approval) 25/04/2019 07/18/19 9-11 WKS 06/06/19 07/22/19 TBD 13-15 WKS
Cruze Hatchback 30/11/2018 03/01/19 14-16 WKS N/A N/A N/A N/A
Cruze Sedan 30/11/2018 03/06/19 14-16 WKS N/A N/A TBD N/A
Impala 16/05/2019 08/16/19 16-18 WKS 05/23/19 08/19/19 8/22/2019 10-12 WKS
Malibu 18/03/2019 05/31/19 10-12 WKS 04/25/19 05/31/19 TBD 13-15 WKS
Sonic 25/04/2019 07/30/19 9-11 WKS 05/23/19 07/31/19 TBD 12-14 WKS
Spark 21/02/2019 05/31/19 27-29 WKS 03/28/19 06/03/19 TBD 25-27 WKS
Volt 30/11/2018 02/15/19 13-15 WKS N/A N/A N/A N/A
TRUCKS
Colorado Extended Cab15-17 25/04/2019 7/15/2019 10-12 WKS 5/23/2019 7/15/2019 TBD 15-17 weeks
Colorado Crew Cab 25/04/2019 7/15/2019 10-12 WKS 5/23/2019 7/15/2019 TBD 15-17 weeks
Silverado LD/1500 Reg Cab Next Gen 10/01/2019 8/3/2019 21-23 WKS 5/9/2019 8/5/2019 TBD 13-15 WKS
Silverado LD/1500 Double Cab Next Gen 24/04/2019 11/1/2019 11-13 WKS 5/9/2019 8/5/2019 TBD 15-17 weeks
Silverado LD/1500 Crew Cab Next Gen 24/04/2019 11/1/2019 11-13 WKS 5/9/2019 8/5/2019 TBD 15-17 weeks
Silverado Medium Duty 23/05/2019 9/27/2019 12-14 WKS 6/20/2019 9/30/2019 TBD 24-26 WKS
Silverado HD/2500/3500 Crew Cab Next Gen ** 27/04/2018 5/10/2019 CONTROLLED ALLOCATION 12-14 WKS ** Gas: 5/23/2019 Diesel: 10/10/2019 Gas: 8/1/2019 Diesel: 12/1/2019 TBD CONTROLLED ALLOCATION 12-14 WKS **
Silverado HD/2500/3500 Reg Cab Next Gen 22/11/2018 4/25/2019 14-16 WKS 7/18/2019 1/6/2020 TBD 19-21 weeks
Silverado HD/2500/3500 Double Cab 14/07/2019 12/16/2019 15-17 WKS 7/18/2019 1/6/2020 TBD 19-21 weeks
Silverado HD/2500/3500 Crew Cab SRW** 27/04/2018 5/10/2019 CONTROLLED ALLOCATION 12-14 WKS ** Gas: 5/23/2019 Diesel: 10/10/2019 Gas: 8/1/2019 Diesel: 12/1/2019 TBD CONTROLLED ALLOCATION 12-14 WKS **
Silverado HD/2500/3500 Crew Cab DRW** 27/04/2018 5/10/2019 CONTROLLED ALLOCATION 12-14 WKS ** Gas: 5/23/2019 Diesel: 10/10/2019 Gas: 8/1/2019 Diesel: 12/1/2019 TBD CONTROLLED ALLOCATION 12-14 WKS **
Low Cab Forward Model 3500HD 27/06/2019 9/27/2019 TBD TBD 10/7/2019 TBD TBD
Low Cab Forward Models 3500/4500 27/09/2018 12/21/2018 TBD 10/9/2018 1/2/2019 TBD TBD
VANS
City Express 8/16/2019 TBD 6/20/2019 8/19/2019 TBD 16-18 WKS
Express Cargo (exclud. FGO & FBC order types)* Cutaway/Passenger/cargo w or w/o SEO 04/04/2019 8/3/2019 17-19 WKS 6/20/2019 8/19/2019 TBD Cargo: 14-16 WKS Cutaway: 15-17 WKS Passenger: 17-19 WKS
SUV's
Equinox* 21/03/2019 6/15/2019 13-15 WKS 4/25/2019 6/17/2019 TBD 14-16 weeks
Suburban 21/03/2019 6/22/2019 10-12 WKS 5/9/2019 6/24/2019 TBD 15-17 weeks
Tahoe 21/03/2019 6/22/2019 10-12 WKS 5/9/2019 6/24/2019 TBD 15-17 weeks
Tahoe Police 21/03/2019 6/22/2019 10-12 WKS 5/9/2019 6/24/2019 Late September 22-24 WKS
Traverse 10/01/2019 6/14/2019 21-23 WKS 4/25/2019 6/17/2019 TBD 10-12 WKS
Trax 21/03/2019 6/28/2019 14-16 WKS 4/25/2019 7/1/2019 TBD 15-17 weeks
Blazer (requires pre-approval) 23/05/2019 8/9/2019 10-12 WKS 6/20/2019 8/12/2019 TBD 14-16 WKS *
Model 2019 Final Fleet Order Due Date 2019 Final Production Date 2019 Lead Time in weeks 2020 Order Banks Open 2020 Production Startup 2020 Final Fleet Order Due Date 2020 Lead Time

Chrysler

The following chart provides vehicle build-out and start-up dates for Chrysler. These updates change regularly and were last updated on November 1, 2019.

Model 2019 Fleet Final Order Due Date 2019 Final Production Date 2019 Lead Time in weeks 2020 Order Banks Open 2020 Production Startup 2020 Lead Time
CARS
300/300C 8/8/2019 11/15/2019 8-10 wks 9/11/2019 11/19/2019 8-10 wks
Fiat 500/500L 500: 10/3/2019 500L: TBD 500: 12/23/2019 500L: TBD 10-12 wks 500: TBD 500L: 4/24/2019 500: TBD 500L: 7/15/2019 TBD
Fiat 500X 04/11/19 07/31/19 10-12 wks TBD 10/1/2019 10-12 wks
TRUCKS
Pacifica 4/11/2019 7/5/2019 8-10 wks 6/7/2019 8/13/2019 8-10 wks
Pacifica Hybrid 4/11/2019 7/5/2019 8-10 wks 5/7/2019 8/12/2019 8-10 wks
Voyager 6/12/2019 8/12/2019 8-10 wks
Model 2019 Fleet Final Order Due Date 2019 Final Production Date 2019 Lead Time in weeks 2020 Order Banks Open 2020 Production Startup 2020 Lead Time

Dodge

The following chart provides vehicle build-out and start-up dates for Dodge. These updates change regularly and were last updated on November 1, 2019.

Model 2019 Fleet Final Order Due Date 2019 Final Production Date 2019 Lead Time in weeks 2020 Order Banks Open 2020 Production Startup 2020 Lead Time
CARS
Challenger 08/08/19 11/15/19 8-10 wks 09/10/19 11/18/19 8-10 wks
Charger 08/08/19 11/15/19 8-10 wks 09/10/19 11/18/19 8-10 wks
Police Charger 08/08/19 11/15/19 12-14 wks 09/10/19 11/12/19 12-14 wks
VANS
Grand Caravan 09/05/19 12/13/19 8-10 wks 10/21/19 01/02/19 8-10 wks
SUVS & CROSSOVERS
Durango 04/11/19 07/20/19 10-12 wks 06/06/19 07/29/19 10-12 wks
Journey 10/03/19 12/23/19 10-12 wks 10/21/19 01/13/20 10-12 wks
Model 2019 Fleet Final Order Due Date 2019 Final Production Date 2019 Lead Time in weeks 2020 Order Banks Open 2020 Production Startup 2020 Lead Time

Ford

The following chart provides vehicle build-out and start-up dates for Ford. These updates change regularly and were last updated on November 1, 2019.

Model 2019 Fleet Final Order Due Date 2019 Final Production Date 2019 Lead Time in weeks 2020 Order Banks Open 2020 Production Startup 2020 Lead Time
CARS
Fusion 04/26/19 08/02/19 12-14 WKS 05/13/19 08/05/19 18-20 WKS
Mustang 05/03/19 08/09/19 12-14 WKS 05/13/19 08/26/19 20-22 weeks
TRUCKS
Ranger 8/2/2019 11/15/2019 14-16 WKS 08/12/19 11/18/19 16-18 weeks
F150 w/o & w/o VSO 07/05/19 DTP: 10/6/2019 KC: 11/3/2019 3.3L engine: 10-12 WKS 5.0L engine: 14-16 WKS 07/15/19 DTP: 10/7/2019 KC: 11/4/2019 3.3L engine: 10-12 WKS 5.0L engine: 14-16 WKS
F59 Stripped Chassis 07/02/19 12/13/19 18-20 WKS 09/16/19 12/16/19 18-20 WKS
F150 KCAP VSO 06/07/19 09/20/19 3.3L engine: 10-12 WKS 5.0L engine: 14-16 WKS 08/16/19 12/02/19 3.3L engine: 10-12 WKS 5.0L engine: 14-16 WKS
F150 Diesel/Police DTP 07/05/19 11/03/19 3.3L engine: 10-12 WKS 5.0L engine: 14-16 WKS 07/15/19 11/04/19 3.3L engine: 10-12 WKS 5.0L engine: 14-16 WKS
Super Duty F250-F350 (without VSO content) 08/02/19 KTP: 11/3/2019 OHAP: 11/14/2019 14-16 WKS 08/14/19 KTP: 11/4/2019 OHAP: 11/18/2019 14-16 WKS
Super Duty F250-F350 VSO Paint 07/05/19 10/07/19 14-16 WKS 08/14/19 12/02/19 14-16 WKS
Super Duty F250-F350 VSO Equipment 07/05/19 10/07/19 14-16 WKS 08/14/19 12/02/19 14-16 WKS
Super Duty F450-F550 6.8L Gas Engine 07/05/19 10/07/19 14-16 WKS 08/14/19 11/04/19 14-16 WKS
Super Duty F450-F550 (without VSO content) 08/02/19 KTP: 11/3/2019 OHAP: 11/14/2019 14-16 WKS 08/14/19 KTP: 11/4/2019 OHAP: 11/4/2019 14-16 WKS
Medium Truck F650-F750 08/30/19 12/19/19 14-16 WKS 2021MY: 9/16/2019 2021MY: 1/2/2020 14-16 WKS
Medium Truck F650-F750 6.8L Gas Engine 08/30/19 12/19/19 14-16 WKS 2021MY: 9/16/2019 2021MY: 2/3/2020 14-16 WKS
Medium Truck F650-F750 VSO 08/02/19 08/22/19 14-16 WKS 2021MY: 9/16/2019 2021MY: 2/3/2020 14-16 WKS
Motorhome 08/30/19 12/13/19 18-20 WKS 09/16/19 01/06/19 12-14 WKS
Motorhome VSO 08/30/19 12/13/19 18-20 WKS 09/16/19 01/13/20 12-14 WKS
VANS
Econoline w/VSO 08/02/19 11/21/19 12-14 WKS 2021MY: 9/16/2019 2021MY: 2/3/2020 12-14 WKS
Econoline w/o VSO 08/30/19 12/19/19 12-14 WKS 2021MY: 9/16/2019 2021MY: 1/2/2020 12-14 WKS
Transit Connect 02/01/19 04/18/19 20-22 WKS 02/11/19 05/06/19 20-22 WKS
TRANSIT VANS
Transit Van 7/5/2019 6/14/2019 - HR 10/17/19 16-18 WKS 7/15/2019 VSO 8/26/2019 10/21/2019 VSO 12/16/19 16-18 WKS
Medium & High Roof, Long & Ext Wheelbase(E2C, E2D, F4U, F4X, R2C, R2D, R2U, R2X, R3U, R3X, S4U, S4X, W2C, W2D, W2U, W2X, W3U, W3X)
Transit Cutaway 06/07/19 08/30/19 16-18 WKS 7/15/2019 VSO 8/26/2019 10/21/2019 VSO 12/16/19 16-18 WKS
Chassis Cab (F6P, F6Z, F8P, F8Z, F9P, F9Z, R5P, R5Z, R7P, R7Z, S6P, S6Z, S8P, S8Z, S9P, S9Z, W7P, W7Z)
Transit Wagon 7/5/2019 6/14/2019 - HR 10/17/19 16-18 WKS 7/15/2019 VSO 8/26/2019 10/21/2019 VSO 12/16/19 16-18 WKS
Medium & High Roof, Long & Ext Wheelbase (K2C, K2X, U3X, X2C*, X2X*, U4X)
SUVS & CROSSOVERS
Ecosport 03/01/19 06/28/19 20-22 WKS 04/01/19 07/01/19 20-22 WKS
Edge 07/05/19 09/27/19 10-12 WKS 07/15/19 09/30/19 14-16 weeks
Escape 04/26/19 08/02/19 12-14 WKS 05/12/19 08/19/19 14-16 weeks
Expedition 07/05/19 10/13/19 10-12 WKS 07/16/19 10/14/19 14-16 weeks
Explorer 11/02/18 03/01/19 TBD 01/21/19 05/06/19 16-18 weeks
Explorer PI Utility 09/21/18 03/01/19 TBD 01/21/19 05/06/19 16-18 weeks
Explorer VSO PI Utility 09/21/18 03/01/19 TBD 07/02/18 06/03/19 16-18 weeks
Model 2019 Fleet Final Order Due Date 2019 Final Production Date 2019 Lead Time in weeks 2020 Order Banks Open 2020 Production Startup 2020 Lead Time

Genesis

The following chart provides vehicle build-out and start-up dates for Genesis. These updates change regularly and were last updated on November 1, 2019.

Model 2019 Order Banks Open 2019 Production Startup 2019 Lead Time in weeks 2019 Order Cutoff 2020 Order Banks Open 2020 Production Startup 2020 Lead Time 2020 Order Cutoff
CARS
G70 03/01/19 05/01/19
G80 03/01/19 05/01/19
G80 Sport
G90 02/01/19 04/01/19
Model 2019 Order Banks Open 2019 Production Startup 2019 Lead Time in weeks 2019 Order Cutoff 2020 Order Banks Open 2020 Production Startup 2020 Lead Time 2020 Order Cutoff

GMC

The following chart provides vehicle build-out and start-up dates for GMC. These updates change regularly and were last updated on November 1, 2019.

Model 2019 Fleet Final Order Date 2019 Final Production Date 2019 Lead Time in weeks 2020 Order Banks Open 2020 Production Startup 2020 Lead Time
TRUCKS
Canyon (w/ SEO) TBD 7/13/2019 10-12 WKS 05/23/19 07/15/19 11-13 WKS
Canyon Crew Cab 4/25/2019 7/15/2019 10-12 WKS 05/23/19 07/15/19 11-13 WKS
Sierra LD/1500 Reg Cab Next Gen 1/10/2019 8/3/2019 18-20 WKS 05/09/19 08/05/19 13-15 WKS
Sierra LD/1500 Reg Cab Next Gen (w/ SEO) 4/24/2019 8/3/2019 18-20 WKS 05/09/19 08/12/19 13-15 WKS
Sierra LD/1500 Extended Cab Next Gen 4/24/2019 8/3/2019 12-14 WKS 05/09/19 08/05/19 13-15 WKS
Sierra LD/1500 Crew Cab Next Gen 4/24/2019 8/3/2019 12-14 WKS 05/09/19 08/05/19 13-15 WKS
Sierra"limited" LD Double Cab Current Gen 7/14/2019 11/1/2019 12-14 WKS 05/09/19 08/05/19 13-15 WKS
Sierra HD/2500/3500 Reg Cab SRW 11/22/2018 4/25/2019 12-14 WKS 05/23/19 01/06/20 12-14 WKS
Sierra HD/2500/3500 Reg Cab DRW 11/22/2018 4/25/2019 12-14 WKS 05/23/19 01/06/20 12-14 WKS
Sierra HD/2500/3500 Double Cab 7/14/2019 12/13/2019 15-17 WKS 7/18/2019 01/06/20 15-17 WKS
Sierra HD/2500/3500 Crew Cab SRW 4/27/2018 5/10/2019 12-14 WKS Gas: 5/23/19 Diesel: 10/10/19 Gas: 8/1/2019 Diesel: 12/1/2019 12-14 WKS
Sierra HD/2500/3500 Crew Cab DRW 4/27/2018 5/10/2019 12-14 WKS Gas: 5/23/19 Diesel: 10/10/19 Gas: 8/1/2019 Diesel: 12/1/2019 12-14 WKS
VANS
Savana - Van 2500/3500/Cutaway/Cutaway 4500(w/o SEO content) 5/2/2019 8/16/2019 Cargo: 17-19 WKS Cutaway: 18-20 WKS Pass: 18-20 WKS 06/20/19 08/19/19 Cargo: 17-19 WKS Cutaway: 18-20 WKS Pass: 18-20 WKS
Savana - Van 2500/3500/Cutaway/Cutaway 4500(w/SEO content) 4/11/2019 8/16/2019 Cargo: 17-19 WKS Cutaway: 18-20 WKS Pass: 18-20 WKS 06/20/19 08/19/19 Cargo: 17-19 WKS Cutaway: 18-20 WKS Pass: 18-20 WKS
SUVS & CROSSOVERS
Acadia (next generation) 05/02/19 07/27/19 10-12 WKS 06/06/19 08/05/19 15-17 WKS
Terrain 03/21/19 06/14/19 10-12 WKS 04/25/19 06/17/19 15-17 weeks
Yukon 03/21/19 06/22/19 10-12 WKS 05/09/19 06/24/19 15-17 weeks
Yukon XL 03/21/19 06/22/19 10-12 WKS 05/09/19 06/24/19 15-17 weeks
Model 2019 Fleet Final Order Date 2019 Final Production Date 2019 Lead Time in weeks 2020 Order Banks Open 2020 Production Startup 2020 Lead Time

Hyundai

The following chart provides vehicle build-out and start-up dates for Hyundai. These updates change regularly and were last updated on November 1, 2019.

Model 2019 Order Banks Open 2019 Production Startup 2019 Lead Time in weeks 2019 Order Cutoff 2020 Order Banks Open 2020 Production Startup 2020 Lead Time 2020 Order Cutoff
CARS
Sonata (Gas) 05/15/19 09/30/19 11/30/19 12-16 wks TBD
Elantra ADa - 4 door 01/15/19 03/31/19 05/22/19 12-16 wks TBD
Elantra AD - 4 door 01/15/19 03/31/19 05/22/19 12-16 wks TBD
Elantra GT 03/15/19 03/15/19 07/01/19 12-16 wks TBD
Accent 01/15/19 03/31/19 05/31/19 12-16 wks TBD
Veloster TBD 02/28/19 04/30/19 12-16 wks TBD
Veloster N TBD TBD TBD TBD TBD
SUV
Santa Fe - TM 02/15/19 04/30/19 06/30/19 12-16 wks TBD
Santa Fe - XL Discontinued TBD
Tucson 03/15/19 05/31/19 07/31/19 12-16 wks TBD
Kona 02/15/19 04/30/19 06/30/19 12-16 wks TBD
Ioniq EV 06/15/19 08/31/19 10/31/19 12-16 wks TBD
Ioniq HEV 05/15/19 07/31/19 09/30/19 12-16 wks TBD
Ioniq PHEV 05/15/19 07/31/19 09/30/19 12-16 wks TBD
Palisade 06/30/19 06/30/19 12-16 wks TBD
Model 2019 Order Banks Open 2019 Production Startup 2019 Lead Time in weeks 2019 Order Cutoff 2020 Order Banks Open 2020 Production Startup 2020 Lead Time 2020 Order Cutoff

Jeep

The following chart provides vehicle build-out and start-up dates for Jeep. These updates change regularly and were last updated on November 1, 2019.

Model 2019 Fleet Final Order Due Date 2019 Final Production Date 2019 Lead Time in weeks 2020 Order Banks Open 2020 Production Startup 2020 Lead Time
Cherokee 04/11/19 07/06/19 8-10 wks 06/24/19 07/22/19 8-10 wks
Compasss 05/02/19 08/03/19 10-12 wks 07/02/19 08/05/19 10-12 wks
Grand Cherokee 04/11/19 07/20/19 10-12 wks 07/02/19 07/29/19 10-12 wks
Renegade 04/11/19 07/15/19 10-14 wks 06/07/19 08/15/19 10-14 wks
Wrangler (2-Door) 04/11/19 07/20/19 TBD 07/02/19 07/22/19 TBD
Wrangler (4-Door) 04/11/19 07/20/19 TBD 07/02/19 07/22/19 TBD
Model 2019 Fleet Final Order Due Date 2019 Final Production Date 2019 Lead Time in weeks 2020 Order Banks Open 2020 Production Startup 2020 Lead Time

Lincoln

The following chart provides vehicle build-out and start-up dates for Lincoln. These updates change regularly and were last updated on November 1, 2019.

Model 2019 Fleet Final Order Due Date 2019 Final Production Date 2019 Lead Time in weeks 2020 Order Banks Open 2020 Production Startup 2020 Lead Time
CARS
Aviator N/A N/A N/A 01/22/19 05/06/19 12-14 WKS
Continental 07/05/19 10/04/19 14-16 WKS 07/08/19 10/07/19 14-16 WKS
MKZ Hybrid 5/3/2019 8/2/2019 12-14 WKS 5/13/2019 8/5/2019 12-14 WKS
MKZ 5/3/2019 8/2/2019 12-14 WKS 5/13/2019 8/5/2019 12-14 WKS
TRUCKS
MKC / Corsair 05/03/19 08/02/19 8-10 WKS 05/16/19 08/19/19 16-18 WKS
MKT 08/02/19 11/15/19 16-18 WKS N/A N/A N/A
MKX/Nautilus 07/05/19 09/27/19 18-20 WKS 07/15/19 09/30/19 10-12 weeks
Navigator 07/05/19 10/13/19 12-14 WKS 07/17/19 10/14/19 14-16 WKS
Model 2019 Fleet Final Order Due Date 2019 Final Production Date 2019 Lead Time in weeks 2020 Order Banks Open 2020 Production Startup 2020 Lead Time

Nissan

The following chart provides vehicle build-out and start-up dates for Nissan. These updates change regularly and were last updated on November 1, 2019.

Model 2019 Fleet Final Order Due Date 2019 Deliveries End 2019 Lead Time in weeks 2020 Order Banks Open 2020 Deliveries End 2020 Production Start Up 2020 Lead Time
CARS
370Z Coupe 10/01/18 03/31/19 8-20 wks 02/15/19 04/01/19 04/01/19 16-20 WKS
370Z Roadster 10/01/18 03/31/19 8-20 wks N/A N/A N/A N/A
Altima Sedan 02/28/19 07/31/19 8-20 wks 03/01/19 07/31/19 06/03/19 12-16 weeks
Maxima 04/01/19 08/31/19 8-20 wks 04/15/19 09/30/19 08/01/19 16-20 WKS
Sentra 06/01/19 10/31/19 8-20 wks 08/15/19 01/31/20 01/02/20 12-20 wks
Versa Note (Hatchback) 01/01/19 05/31/19 8-20 wks N/A N/A N/A N/A
Versa Sedan 03/01/19 06/30/19 8-20 wks 03/15/19 07/31/19 06/03/19 16-20 weeks
TRUCKS
Frontier TBD TBD TBD TBD 01/01/20 TBD TBD
Titan Diesel XD CC TBD TBD TBD 08/15/19 TBD 01/01/20 16-20 WKS
Titan Gas CC (Incl XD) TBD TBD TBD 08/15/19 TBD 01/01/20 16-20 WKS
Titan Gas/Dsl Sngl Cab (Incl XD) TBD TBD TBD 08/15/19 TBD 01/01/20 16-20 WKS
VANS
NV 200 Cargo 05/01/19 09/30/19 8-20 wks 05/15/19 10/31/19 09/02/19 16-20 WKS
NV Cargo 1500/2500 (V6) 04/01/19 08/31/19 8-20 wks 04/15/19 08/31/19 07/01/19 16-20 WKS
NV Cargo 2500/3500 (V8) 04/01/19 08/31/19 8-20 wks 04/15/19 08/31/19 07/01/19 16-20 WKS
NV Passenger (V6) 04/01/19 08/31/19 8-20 wks 04/15/19 08/31/19 07/01/19 16-20 WKS
NV Passenger (V8) 04/01/19 08/31/19 8-20 wks 04/15/19 08/31/19 07/01/19 16-20 WKS
SUVS & CROSSOVERS
Armada 03/01/19 08/31/19 8-20 wks 03/15/19 09/31/19 08/01/19 16-20 WKS
Kicks TBD TBD TBD 07/15/19 12/31/19 11/01/19 16-20 WKS
Murano 05/01/19 09/30/19 8-20 wks 05/15/19 10/31/19 09/02/19 16-20 WKS
Pathfinder 05/01/19 09/30/19 8-20 wks 05/15/19 10/31/19 09/02/19 16-20 WKS
Rogue 04/01/19 08/31/19 8-20 wks 04/15/19 08/31/19 07/01/19 16-20 WKS
Rogue Sport 04/01/19 09/30/19 8-20 wks 04/15/19 10/31/19 11/01/19 16-20 WKS
Model 2019 Fleet Final Order Due Date 2019 Deliveries End 2019 Lead Time in weeks 2020 Order Banks Open 2020 Deliveries End 2020 Production Start Up 2020 Lead Time

Ram

The following chart provides vehicle build-out and start-up dates for Ram. These updates change regularly and were last updated on November 1, 2019.

Model 2019 Fleet Final Order Due Date 2019 Final Production Date 2019 Lead Time in weeks 2020 Order Banks Open 2020 Production Startup 2020 Lead Time
VANS
Ram ProMaster City Van 04/11/19 07/01/19 Orders: 18-20 Pool Orders: 6-8 wks 06/06/19 07/01/19 Orders: 18-20 Pool Orders: 6-8 wks
Ram ProMaster Commercial Van 05/02/19 09/27/19 14-16 wks 06/06/19 07/29/19 18-20 weeks
TRUCKS
Ram 1500 REG Cab Pickup (OLD STYLE) 09/05/19 12/21/19 8-10 WKS TBD 01/02/20 TBD
Ram 1500 Regular Cab Pickup (new style) 09/05/19 12/21/19 12-14 wks 06/06/19 07/22/19 8-10 wks
Ram 1500 QUAD & CREW Cab Pickup (new style) 09/05/19 12/13/19 12-14 wks 10/08/19 12/17/19 8-10 wks
RAM 1500 (NEW STYLE) 04/11/19 07/20/19 12-14 wks 06/06/19 07/22/19 TBD
Ram 2500 Pickup 06/27/19 10/05/19 12-14 wks 09/23/19 11/25/19 TBD
Ram 3500 Pickup 06/27/19 10/05/19 12-14 wks 09/23/19 11/25/19 TBD
Ram Cab Chassis 3500 06/27/19 10/05/19 12-14 wks 09/23/19 11/25/19 TBD
Ram Cab Chassis 4500/5500 - Gas Engine 04/11/19 10/05/19 24-26 wks 09/23/19 11/25/19 TBD
Ram Cab Chassis 4500/5500 - Diesel Engine 04/11/19 10/05/19 24-26 wks 09/23/19 11/25/19 TBD
Model 2019 Fleet Final Order Due Date 2019 Final Production Date 2019 Lead Time in weeks 2020 Order Banks Open 2020 Production Startup 2020 Lead Time

Subaru

The following chart provides vehicle build-out and start-up dates for Subaru. These updates change regularly and were last updated on November 1, 2019.

Model 2019 Fleet Final Order Due Date 2019 Order Receipt cutoff 2019 Lead Time in weeks 2020 Order Banks Open 2020 First Delivery Month 2020 Production Start Up 2020 Lead Time
Cars
Legacy Completed 5/20/2019 10-12 wks 7/15/2019 01/11/2019 01/11/2019 6-10 weeks
Impreza 6/30/2019 8/20/2019 10-12 wks 10/1/2019 01/11/2019 01/11/2019 6-10 weeks
WRX/Sti 5/31/2019 7/20/2019 10-12 wks 8/15/2019 01/10/2019 01/10/2019 6-10 weeks
BRZ 5/31/2019 7/20/2019 10-12 wks 8/15/2019 01/10/2019 01/10/2019 6-10 weeks
SUVS & CROSSOVERS
Ascent Completed Completed 10-12 wks 5/15/2019 01/07/2019 01/07/2019 6-10 weeks
Forester 5/31/2019 7/20/2019 10-12 wks 8/31/2019 01/10/2019 01/10/2019 6-10 weeks
Outback Completed 6/20/2019 10-12 wks 7/15/2019 01/11/2019 01/11/2019 6-10 weeks
Crosstrek 7/31/2019 9/20/2019 10-12 wks 10/1/2019 01/12/2019 01/12/2019 6-10 weeks
Model 2019 Fleet Final Order Due Date 2019 Order Receipt cutoff 2019 Lead Time in weeks 2020 Order Banks Open 2020 First Delivery Month 2020 Production Start Up 2020 Lead Time

Toyota

The following chart provides vehicle build-out and start-up dates for Toyota. These updates change regularly and were last updated on November 1, 2019.

Model 2019 Fleet Final Order Due date 2019 Final Order Due Date 2019 Lead Time 2020 Order Banks Open 2020 Production Startup 2020 Lead Time
Cars
Avalon (Gas) 04/10/19 06/30/19 Factory Order: 12-20 WKS Pipeline Pool Order: 2-6 WKS 05/10/19 31/07/2019 Factory Order: 8-12 WKS Pipeline Pool Order: 2-6 WKS
Avalon HV (Hybrid) 04/10/19 06/30/19 Factory Order: 12-20 WKS Pipeline Pool Order: 2-6 WKS 05/10/19 30/07/2019 Factory Order: 8-12 WKS Pipeline Pool Order: 2-6 WKS
C-HR 07/10/19 Factory Order: 12-20 WKS Pipeline Pool Order: 2-6 WKS 08/12/19 30/10/2019 Factory Order: 12-20 WKS Pipeline Pool Order: 2-6 WKS
Camry 05/10/19 07/31/19 Factory Order: 12-20 WKS Pipeline Pool Order: 2-6 WKS 06/10/19 29/08/2019 Factory Order: 8-12 WKS Pipeline Pool Order: 2-6 WKS
Camry Hybrid 05/10/19 07/31/19 Factory Order: 12-20 WKS Pipeline Pool Order: 2-6 WKS 06/10/19 29/08/2019 Factory Order: 8-12 WKS Pipeline Pool Order: 2-6 WKS
Corolla 11/01/18 12/31/18 Factory Order: 12-20 WKS Pipeline Pool Order: 2-6 WKS 12/14/18 29/03/2019 Factory Order: 8-15 WKS Pipeline Pool Order: 2-6 WKS
Corolla Hatchback 06/10/19 08/31/19 Factory Order: 12-20 WKS Pipeline Pool Order: 2-6 WKS 07/10/19 30/09/2019 Factory Order: 12-20 WKS Pipeline Pool Order: 2-6 WKS
Prius 05/10/19 07/31/19 Factory Order: 12-20 WKS Pipeline Pool Order: 2-6 WKS 06/10/19 29/08/2019 Factory Order: 12-20 WKS Pipeline Pool Order: 2-6 WKS
Prius C 04/10/19 06/30/19 Factory Order: 12-20 WKS Pipeline Pool Order: 2-6 WKS 05/10/19 29/08/2019 Factory Order: 16-20 WKS Pipeline Pool Order: 2-6 WKS
Prius Prime 02/11/19 04/30/19 Factory Order: 12-20 WKS Pipeline Pool Order: 2-6 WKS 03/12/19 31/05/2019 Factory Order: 16-20 WKS Pipeline Pool Order: 2-6 WKS
TRUCKS
Tacoma 05/10/19 07/31/19 Factory Order: 12-20 WKS Pipeline Pool Order: 2-6 WKS 06/10/19 29/08/2019 Factory Order: 16-20 WKS Pipeline Pool Order: 2-6 WKS
Tundra 04/10/19 06/30/19 Factory Order: 12-20 WKS Pipeline Pool Order: 2-6 WKS 05/10/19 30/07/2019 Factory Order: 8-16 WKS Pipeline Pool Order: 2-6 WKS
VAN
Sienna 12/10/2018 2/28/2019 Factory Order: 12-20 WKS Pipeline Pool Order: 2-6 WKS 1/3/2019 29/03/2019 Factory Order: 8-10 WKS Pipeline Pool Order: 2-6 WKS
SUVS & CROSSOVERS
4Runner 5/10/2019 7/31/2019 Factory Order: 12-20 WKS Pipeline Pool Order: 2-6 WKS 6/10/2019 29/08/2019 Factory Order: 17-19 WKS Pipeline Pool Order: 2-6 WKS
Highlander 8/12/2019 10/31/2019 Factory Order: 12-20 WKS Pipeline Pool Order: 2-6 WKS 9/10/2019 29/11/2019 Factory Order: 10-12 WKS Pipeline Pool Order: 2-6 WKS
Highlander Hybrid 8/12/2019 10/31/2019 Factory Order: 12-20 WKS Pipeline Pool Order: 2-6 WKS 11/11/2019 31/01/2020 Factory Order: 12-20 WKS Pipeline Pool Order: 2-6 WKS
Land Cruiser 5/10/2019 7/31/2019 Factory Order: 12-20 WKS Pipeline Pool Order: 2-6 WKS 6/10/2019 29/08/2019 Factory Order: 12-20 WKS Pipeline Pool Order: 2-6 WKS
Mirai (Fuel Cell)* 8/12/2019 10/31/2019 Factory Order: 12-20 WKS Pipeline Pool Order: 2-6 WKS 9/10/2019 29/11/2019 Factory Order: 12-20 WKS Pipeline Pool Order: 2-6 WKS
Rav4 6/10/2019 8/31/2019 Factory Order: 12-20 WKS Pipeline Pool Order: 2-6 WKS 6/10/2019 29/08/2019 Factory Order: 8-12 WKS Pipeline Pool Order: 2-6 WKS
Rav4 Hybrid 6/10/2019 7/31/2019 Factory Order: 12-20 WKS Pipeline Pool Order: 2-6 WKS 6/10/2019 29/08/2019 Factory Order: 8-12 WKS Pipeline Pool Order: 2-6 WKS
Model 2019 Fleet Final Order Due date 2019 Final Order Due Date 2019 Lead Time 2020 Order Banks Open 2020 Production Startup 2020 Lead Time

Volkswagen

The following chart provides vehicle build-out and start-up dates for Volkswagen. These updates change regularly and were last updated on November 1, 2019.

Model 2019 Fleet Final Order Due Date 2019 Final Production Date 2019 Lead Time in days* 2020 Order Banks Open 2020 Production Startup 2020 Lead Time
Cars
Golf 7/26/2019 9/27/2019 90-100 days TBD 10/28/2019 90-100 days
Golf R CLOSED 7/5/2019 90-100 days No MY 2020 No MY 2020 No MY 2020
Golf SportWagen 1.4T CLOSED 8/23/2019 90-100 days DISCONTINUED DISCONTINUED DISCONTINUED
Golf SportWagen 1.8T TBD 12/13/2019 90-100 days DISCONTINUED DISCONTINUED DISCONTINUED
Golf Alltrack TBD 12/13/2019 90-100 days DISCONTINUED DISCONTINUED DISCONTINUED
GTI 7/26/2019 9/27/2019 90-100 days TBD 10/28/2019 90-100 days
Bettle Coupe Closed 7/19/2019 90-100 days N/A N/A N/A
Bettle Convertible Closed 7/19/2019 90-100 days N/A N/A N/A
Jetta 7/26/2019 9/27/2019 90-100 days N/A 10/28/2019 90-100 days
Passat CLOSED 1/11/2019 90-100 days TBD 9/4/2019 90-100 days
SUVS & CROSSOVERS
Atlas TBD 12/13/2019 90-100 days TBD 2.0 T-4 CYL: 12/16/2019 3.6L-V6: 1/06/2020 90-100 days
Atlas Cross Sport N/A 12/13/2019 90-100 days TBD 1/6/2020 90-100 days
Tiguan CLOSED 8/23/2019 90-100 days TBD 8/19/2019 90-100 days
Model 2019 Fleet Final Order Due Date 2019 Final Production Date 2019 Lead Time in days* 2020 Order Banks Open 2020 Production Startup 2020 Lead Time