Find valuable build out and order bank information on popular fleet vehicles, consolidated into one easy to navigate location. Below you can click through any of the various manufacturers’ build-out and start-up dates for US cars and US trucks. Please be aware these dates change regularly.
Quick Menu: 2022 Build-outs
Audi | BMW | Buick | Cadillac | Chevrolet | Chrysler | Dodge | Ford | GMC | Hyundai | Infiniti | Jeep | Lincoln | Mazda | Mercedes | MINI | Nissan | RAM | Rivian | Subaru | Tesla | Toyota | Volkswagen | Volvo
Model | Last Updated | Order Banks Open | ETA for Data Available to Order | Pricing Release Date | Start of Production | Last Date to Submit Orders to Merchants | Build Out Date | Average Lead Time | Important Updates |
---|---|---|---|---|---|---|---|---|---|
iX | 03/23/2022 | 2/1/22 | TBD | TBD | 3/1/22 | TBD | TBD | 8-12 weeks | iX xDR50 - Order Bank Open 6/1/22 Start of production 7/1/22 |
I4 | 03/23/2022 | 6/1/22 | TBD | TBD | 7/1/22 | TBD | TBD | 8-12 weeks | |
2 Series | 03/23/2022 | 6/1/22 | TBD | TBD | 7/1/22 | TBD | TBD | 8-12 weeks | M2 Cp - New Gen Order Bank Opens 10/1/22 |
3 Series | 03/23/2022 | 6/1/22 | TBD | TBD | 7/1/22 | TBD | TBD | 8-12 weeks | |
4 Series | 03/23/2022 | 6/1/22 | TBD | TBD | 7/1/22 | TBD | TBD | 8-12 weeks | 430xi GC Order Bank Open 2/1/22, Start of Production 3/1/22 |
5 Series | 03/23/2022 | 6/1/22 | TBD | TBD | 7/1/22 | TBD | TBD | 8-12 weeks | |
7 Series | 03/23/2022 | TBD | TBD | TBD | TBD | TBD | TBD | 8-12 weeks | |
8 Series | 03/23/2022 | 2/1/22 | TBD | TBD | 3/1/22 | TBD | TBD | 8-12 weeks | |
X1 | 03/23/2022 | TBD | TBD | TBD | TBD | TBD | TBD | 8-12 weeks | |
X2 | 03/23/2022 | 2/1/22 | TBD | TBD | 3/1/22 | TBD | TBD | 8-12 weeks | |
X3 | 03/23/2022 | 7/1/22 | TBD | TBD | 8/1/22 | TBD | TBD | 8-12 weeks | X3sDr30sSA & X3xDr30iSA - Order Bank Opens 8/1/22, Start of Production 9/1/22 |
X4 | 03/23/2022 | 7/1/22 | TBD | TBD | 8/1/22 | TBD | TBD | 8-12 weeks | |
X5 | 03/23/2022 | 7/1/22 | TBD | TBD | 8/1/22 | TBD | TBD | 8-12 weeks | |
X6 | 03/23/2022 | 7/1/22 | TBD | TBD | 8/1/22 | TBD | TBD | 8-12 weeks | |
X7 | 03/23/2022 | 7/1/22 | TBD | TBD | 8/1/22 | TBD | TBD | 8-12 weeks | |
Z4 | 03/23/2022 | 6/1/22 | TBD | TBD | 7/1/22 | TBD | TBD | 8-12 weeks |
Model | Last Updated | Order Banks Open | ETA for Data Available to Order | Pricing Release Date | Start of Production | Last Date to Submit Orders to Merchants | Build Out Date | Average Lead Time | Important Updates |
---|---|---|---|---|---|---|---|---|---|
Encore | 07/07/2022 | TBD | NA | NA | TBD | TBD | TBD | TBD | not in 2023MY Order Guide |
Encore GX | 05/03/2022 | 2/24/22 | TBD | TBD | 4/25/22 | 4/29/22 | 4/29/22 | TBD | Early 23MY cutoff |
Envision | 03/23/2022 | 12/30/21 | TBD | TBD | 4/4/22 | 3/23/2022 | 3/23/2022 | TBD | Early 23MY cutoff |
Enclave | 05/20/2022 | 3/24/22 | TBD | TBD | 6/6/22 | 5/20/2022 | 5/20/2022 | TBD | Early 23MY cutoff |
Model | Last Updated | Order Banks Open | ETA for Data Available to Order | Pricing Release Date | Start of Production | Last Date to Submit Orders to Merchants | Build Out Date | Average Lead Time | Important Updates |
---|---|---|---|---|---|---|---|---|---|
CT4 | 06/23/2022 | 5/5/22 | TBD | TBD | 7/11/22 | 6/22/22 | 6/22/22 | TBD | Early 23MY cutoff |
CT5 | 05/20/2022 | 5/5/22 | TBD | TBD | 7/11/22 | 5/20/2022 | 5/20/2022 | TBD | Early 23MY cutoff |
Escalade/Escalade ESV | 05/20/2022 | 5/19/22 | TBD | TBD | 7/18/22 | 5/20/2022 | 5/20/2022 | TBD | Early 23MY cutoff |
Lyric | 07/11/2022 | NA | NA | NA | NA | NA | NA | NA | Executive Purchase Program Only |
XT4 | 11/14/2022 | 4/7/22 | TBD | TBD | 6/10/22 | 2/2/2023 | 2/9/2023 | TBD | |
XT5 | 06/16/2022 | 4/7/22 | TBD | TBD | 6/10/22 | 6/15/22 | 6/15/22 | TBD | Early 23MY cutoff |
XT6 | 06/07/2022 | 4/7/22 | TBD | TBD | 6/10/22 | 6/6/22 | 6/6/2022 | TBD | Early 23MY cutoff |
Model | Last Updated | Order Banks Open | ETA for Data Available to Order | Pricing Release Date | Start of Production | Last Date to Submit Orders to Merchants | Build Out Date | Average Lead Time | Important Updates |
---|---|---|---|---|---|---|---|---|---|
Blazer | 06/15/2022 | 6/3/22 | TBD | TBD | 8/1/22 | 6/14/22 | 6/14/22 | TBD | Early 23MY cutoff |
Bolt EV / EUV | 06/23/2022 | 6/2/22 | TBD | TBD | 7/21/22 | 6/22/22 | 6/22/22 | TBD | Early 23MY cutoff |
Camaro | 09/20/2022 | 4/21/22 | TBD | TBD | 6/6/22 | 11/28/22 | 12/2/22 | TBD | |
Colorado | 12/13/2022 | 11/3/22 | TBD | TBD | 1/25/23 | 2/3/23 | 2/10/23 | TBD | ALLOCATION REQUIRED 23MY will be late Q4 open order bank & will require Allocation Approval |
Equinox | 09/20/2022 | 6/23/22 | TBD | TBD | 8/22/22 | 11/28/22 | 12/2/22 | TBD | ALLOCATION REQUIRED |
Express (Cargo/Cutaway/Pass) | 09/20/2022 | 6/16/22 | TBD | TBD | 8/15/22 | 10/21/22 | 10/28/22 | TBD | ALLOCATION REQUIRED Cutaway can be ordered with V6 & V8 Engine. Cargo and Passenger Van can only be ordered with V6. No Diesel engine availble for 23MY |
LCF 3500/4500 Gas | 06/23/2022 | 7/1/21 | TBD | TBD | 1/3/22 | 3/4/22 | 3/4/22 | TBD | Early 23MY cutoff *24MY order bank open date 6/30/2022 for Gas has been delayed to TBD |
LCF 4500/5500 HD/XD Diesel | 03/24/2022 | 8/26/21 | TBD | TBD | 1/3/22 | 3/24/22 | 3/24/22 | TBD | Early 23MY cutoff |
LCF 6500 XD Diesel | 03/23/2022 | TBD | TBD | TBD | 4/1/22 | 3/24/22 | 3/24/22 | TBD | Early 23MY cutoff |
Malibu | 09/20/2022 | 7/20/22 | TBD | TBD | 9/7/22 | 11/28/22 | 12/2/22 | TBD | ALLOCATION REQUIRED *6/21/22 - Per Pat Wellisnki at GM, pricing will be available right at order bank open date |
Silverado 1500 Regular MCM | 05/27/2022 | 5/26/22 | TBD | TBD | 8/29/22 | TBD | 5/26/22 | TBD | Early 23MY cutoff |
Silverado 1500 Double MCM | 05/27/2022 | 5/26/22 | TBD | TBD | 9/6/22 | TBD | 5/26/22 | TBD | Early 23MY cutoff |
Silverado 1500 Crew MCM | 05/27/2022 | 5/26/22 | TBD | TBD | 8/29/22 | TBD | 5/26/22 | TBD | Early 23MY cutoff |
Silverado 2500/3500 Regular | 05/27/2022 | 5/26/22 | TBD | TBD | 7/18/22 | TBD | 5/26/22 | TBD | Early 23MY cutoff |
Silverado 2500/3500 Double | 05/27/2022 | 5/26/22 | TBD | TBD | 7/18/22 | TBD | 5/26/22 | TBD | Early 23MY cutoff |
Silverado 2500/3500 Crew | 09/09/2022 | 5/26/22 | TBD | TBD | 7/18/22 | 9/23/22 | 9/30/22 | TBD | ALLOCATION REQUIRED FINAL ORDER CUTOFF 8/24/2022 - 3500 Chassis Cab - 2WD Crew Dual Rear Wheel 60" CA CC31043 & 4WD Crew Cab Dual Rear Wheel 60" CA CK31043 |
Silverado Medium Duty (HD) | 06/23/2022 | 8/11/22 | TBD | TBD | 1/3/23 | 7/20/23 | 7/27/23 | TBD | 23MY - ALLOCATION REQUIRED |
Suburban | 05/20/2022 | 5/19/22 | TBD | TBD | 7/18/22 | 5/20/22 | 5/20/22 | TBD | Early 23MY cutoff |
Tahoe | 05/20/2022 | 5/19/22 | TBD | TBD | 7/18/22 | 5/20/22 | 5/20/22 | TBD | Early 23MY cutoff |
Tahoe Police | 05/20/2022 | 5/19/22 | TBD | TBD | 7/18/22 | 5/20/22 | 5/20/22 | TBD | Early 23MY cutoff |
Trailblazer | 05/03/2022 | 2/24/22 | TBD | TBD | 4/25/22 | 4/29/22 | 4/29/22 | TBD | Early 23MY cutoff |
Traverse | 06/01/2022 | 3/24/22 | TBD | TBD | 6/6/22 | 5/31/22 | TBD | Early 23MY cutoff | |
Trax | 06/02/2022 | TBD | TBD | TBD | TBD | TBD | TBD | not in 2023MY Order Guide |
Model | Last Updated | Order Banks Open | ETA for Data Available to Order | Pricing Release Date | Start of Production | Last Date to Submit Orders to Merchants | Build Out Date | Average Lead Time | Important Updates |
---|---|---|---|---|---|---|---|---|---|
300 (LX) | 11/07/2022 | 11/7/22 | TBD | TBD | 12/10/22 | TBD | TBD | TBD | Built at Brampton. |
Pacifica | 12/13/2022 | 11/7/22 | TBD | TBD | 12/9/22 | TBD | TBD | TBD | Order Banks for Fleet GOVERNMENT opened 12/13/2022 Built at Windsor |
Voyager | 11/07/2022 | 11/7/22 | TBD | TBD | 12/9/22 | TBD | TBD | TBD | Built at Windsor. |
Model | Last Updated | Order Banks Open | ETA for Data Available to Order | Pricing Release Date | Start of Production | Last Date to Submit Orders to Merchants | Build Out Date | Average Lead Time | Important Updates |
---|---|---|---|---|---|---|---|---|---|
Challenger (LA) | 11/07/2022 | 11/7/22 | TBD | TBD | 12/10/22 | TBD | TBD | TBD | Built in Brampton. |
Charger (LD) | 11/07/2022 | 11/7/22 | TBD | TBD | 12/10/22 | TBD | TBD | TBD | Built in Brampton. |
Charger Police (LDDE48 & LDEE48) | 11/07/2022 | 11/7/22 | TBD | TBD | 12/10/22 | TBD | TBD | TBD | Built in Brampton. |
Durango (WD) | 10/18/2022 | 9/1/22 | TBD | TBD | 12/5/22 | TBD | TBD | TBD | Built at Jefferson North. |
Durango Police (WDDE75/WDEE75) | 10/19/2022 | 9/1/22 | TBD | TBD | 12/5/22 | TBD | TBD | TBD | Built at Jefferson North. |
Hornet (GG) | 10/18/2022 | TBD | TBD | TBD | TBD | TBD | TBD | TBD | Estimated 23MY Order Bank Opening - TBD Built at Vico Assembly. |
wdt_ID | Model | Last Updated | Order Banks Open | Quarterly Cap Volume | Start of Production | FIN with Allocation Build Out Date | Last Date to Submit Orders to Merchants | FIN without Allocation Build Out date (Quarterly Cap) | Last Date to Submit Orders To Merchants | Average Lead Time | Important Updates |
---|---|---|---|---|---|---|---|---|---|---|---|
1 | Bronco | 1/18/2023 | NA for Q2 2023 NA for Q1 2023 8/29/22 Q4 2022 |
Not Available Q2 23CY Not Available Q1 23CY Not Available Q4 22CY |
10/6/2022 | TBD | NA | NA | NA | TBA | PRE APPROVAL REQUIRED BEFORE ORDERING. DOES NOT QUALIFY FOR QUARTERLY CAP VOLUME Q1 23CY *10/14/22 - 23MY NOT AVAILABLE FOR Q1 23CY FLEET ORDERING Job #1 11/15/22 |
2 | Bronco Sport | 1/18/2023 | 8/5/2022 | Not Applicable | 9/15/2022 | TBD | TBD | NA | TBD | TBA | Job #1 12/2/22 FINAL ORDER DUE DATE STATE & LOCAL 11/11/2022 |
3 | Econoline | 1/18/2023 | 10/27/2021 | Not Applicable | 11/11/2021 | 12/7/2021 | 12/7/2021 | 12/7/2021 | 12/7/2021 | TBA | Job #1 2/10/22 |
4 | Ecosport | 1/18/2023 | Not Applicable | Not Applicable | Not Applicable | Not Applicable | Not Applicable | Not Applicable | Not Applicable | TBA | Job #1 = NA |
5 | Edge | 1/18/2023 | 8/16/2022 | Not Applicable | 9/15/2022 | TBD | TBD | TBD | TBD | TBA | Job #1 12/13/2022 FINAL ORDER DUE DATE STATE & LOCAL GOVERNMENT 11/11/2022 |
6 | Escape (Gas) | 1/20/2023 | 1/25/23 Q2 2023 9/19/22 Q1 2023 |
10 Q2 23CY 10 Q1 23CY |
11/3/2022 | 2/24/2023 Q2 23CY | 2/17/2023 Q2 23CY | 3/24/2023 Q2 23CY 12/16/2022 Q1 23CY |
3/17/2023 Q2 23CY 12/9/2022 Q1 23CY |
TBA | ALLOCATION APPROVAL REQUIRED (does not apply to Gov't FIN) Job #1 12/12/22 FINAL ORDER DUE DATE STATE & LOCAL 9/29/22 |
7 | Escape FHEV (Hybrid) | 1/20/2023 | 1/25/23 Q2 2023 9/19/22 Q1 2023 |
Restricted Q2 23CY Restricted Q1 23CY |
11/3/2022 | 2/24/2023 Q2 23CY | 2/17/2023 Q2 23CY | 3/24/2023 Q2 23CY 12/16/2022 Q1 23CY |
3/17/2023 Q2 23CY 12/9/2022 Q1 23CY |
TBA | PRE APPROVAL REQUIRED BEFORE ORDERING. DOES NOT QUALIFY FOR QUARTERLY CAP VOLUME Job #1 12/12/22 FINAL ORDER DUE DATE STATE & LOCAL - 9/23/2022 |
8 | Escape PHEV | 1/20/2023 | 1/25/23 Q2 2023 9/19/22 Q1 2023 |
10 Q2 23CY 5 Q1 23CY |
11/3/2022 | 2/24/2023 Q2 23CY | 2/17/2023 Q2 23CY | 3/24/2023 Q2 23CY 12/16/2022 Q1 23CY |
3/17/2023 Q2 23CY 12/9/2022 Q1 23CY |
TBA | RESTRICTED AVAILABILITY ALLOCATION APPROVAL REQUIRED (does not apply to Gov't FIN) Job #1 12/12/22 FINAL ORDER DUE DATE STATE & LOCAL - 9/29/22 |
9 | Explorer(Retail/Fleet) | 1/18/2023 | 8/5/2022 | Not Applicable | 12/5 - 12/26/22 | TBD | TBD | TBA | Job #1 11/22/22 FINAL ORDER DUE DATE STATE & LOCAL 9/30/22 |
||
10 | Explorer - Base Only (K7B/K8B) | 1/18/2023 | 8/5/2022 | Not Applicable | 12/5 - 12/26/22 | 1/13/2023 | 1/9/2023 | 1/13/2023 | 1/9/2023 | TBA | Job #1 11/22/22 |
11 | PI (Police Interceptor) Utility Gas | 10/24/2022 | 8/2/2022 | Not Applicable | 12/5 - 12/26/22 | 9/9/2022 | 9/9/2022 | 9/9/2022 | 9/9/2022 | TBA | Job #1 11/22/22 |
12 | PI (Police Interceptor) Utility HEV | 10/24/2022 | 8/2/2022 | Not Applicable | 12/5 - 12/26/22 | 9/9/2022 | 9/9/2022 | 9/9/2022 | 9/9/2022 | TBA | Job #1 11/22/22 |
13 | Expedition | 1/18/2023 | 8/15/2022 | Not Applicable | 9/22/2022 | TBD | TBD | TBD | TBD | TBA | Job #1 11/29/22 FINAL ODER DUE DATE STATE & LOCAL - SSV 9/30/22 FINAL ORDER DUE DATE STATE & LOCAL - NON SSV 10/7/22 |
14 | F-150 (Gas & Hybrid) / F-150 Police | 1/20/2023 | Detroit TP 1/25/23 Q2 2023 Kansas City TP 1/25/23 Q2 2023 Detroit TP 10/27/22 Q1 2023 Kansas City TP 10/27/22 Q1 2023 Detroit TP 7/18/22 Q4 2022 Kansas City TP 7/18/22 Q4 2022 |
5 F150 ICE Q2 23CY 5 F150 ICE Q1 23CY 4 F150 ICE Q4 22CY |
Dearborn: 9/15/22 Kansas City: 9/29/22 |
2/24/2023 Q2 23CY | 2/17/2023 Q2 23CY | 3/24/2023 Q2 23CY 12/23/22 Q1 23CY 9/30/2022 Q4 22CY |
3/17/2023 Q2 23CY 12/16/22 Q1 23CY 9/23/2022 Q4 22CY |
TBA | ALLOCATION APPROVAL REQUIRED (does not apply to Gov't FIN) State & Local Govt - Non-Police and Police Responder 23MY F150 ICE Order Cutoff 8/19/22 Job #1 Dearborn 10/23/22, Kansas City 11/17/22 |
15 | F150 Lightning (BEV) | 1/18/2023 | 1/9/23 Q2 2023 10/27/22 Q1 2023 8/9/22 Q4 2022 |
2 Q2 23CY 2 Q1 23CY 4 Q4 22CY |
REVC: 9/15/22 Q4 22CY | 2/24/2023 Q2 23CY | 2/17/2023 Q2 23CY | 3/24/2023 Q2 23CY 12/9/2022 Q1 23CY 9/30/2022 Q4 22CY |
3/17/2023 Q2 23CY 12/2/2022 Q1 23CY 9/23/2022 Q4 22CY |
TBA | ALLOCATION APPROVAL REQUIRED (does not apply to Gov't FIN) Job #1 10/20/2022 (REVC = Rouge Electric Vehicle Center) State & Local Govt 23MY Order Cutoff 9/2/22 |
16 | F-150 BEV Lighting Extended Range Battery | 1/18/2023 | Q2 23CY see notes Q1 23CY see notes 8/9/22 Q4 22CY |
Not Applicable | REVC: 9/1/22 Q4 22CY | Not Applicable | Not Applicable | 8/23/2022 Q4 22CY | 8/23/22 Q4 22CY | TBA | Q1 23CY LIMITED AVAILABILITY - CONTACT FORD PRO SOLUTIONS FOR MORE DETAILS Commercial, State & Local - Final Order Due Date 8/23/22 |
17 | F-150 BEV Lighting Standard Range Battery | 1/20/2023 | Q2 23CY see notes Q1 23CY see notes 8/9/22 Q4 22CY |
Not Applicable | REVC: 9/1/22 Q4 22CY | Not Applicable | Not Applicable | 9/30/2022 Q4 22CY | 9/30/22 Q4 22CY | TBA | Q1 23CY LIMITED AVAILABILITY - CONTACT FORD PRO SOLUTIONS FOR MORE DETAILS State & Local - Final Order Due Date 8/26/22 |
18 | Maverick ICE | 1/20/2023 | 1/25/23 Q2 2023 9/15/22 Q1 2023 |
5 Q2 23CY 5 Q1 23CY |
10/27/2022 | 2/24/2023 Q2 23CY | 2/17/2023 Q 23CY | 12/16/22 Q1 23CY | TBA | ALLOCATION APPROVAL REQUIRED (does not apply to Gov't FIN) Job #1 11/23/2022 FINAL ORDER DUE DATE STATE & LOCAL - 9/23/22 |
|
19 | Maverick FHEV | 1/20/2023 | 1/25/23 Q2 2023 9/15/22 Q1 2023 |
5 Q2 23CY 5 Q1 23CY |
10/27/2022 | 2/24/2023 Q2 23CY | 2/17/2023 Q2 23CY | 12/16/22 Q1 23CY | TBA | ALLOCATION APPROVAL REQUIRED (does not apply to Gov't FIN) Job #1 11/23/2022 FINAL ORDER DUE DATE STATE & LOCAL - 9/23/22 |
|
20 | Medium Truck (F650 & F750) | 1/18/2023 | 10/28/2021 | Not Applicable | 11/11/2021 | Not Applicable | Not Applicable | 1/31/202 | 1/31/2022 | TBA | Job #1 2/9/22 State & Local buid out 2/7/22 ; retail/stock build out 3/5/22 |
21 | Motorhome | 1/18/2023 | 10/6/2022 | Not Applicable | 10/13/2022 | TBD | TBD | TBD | TBD | TBA | Job #1 12/14/22 *VSO order bank open 10/26/22 with Start of Production 11/10/22, Job #1 1/19/23 |
22 | Mustang | 1/20/2023 | 9/21/2022 | Not Applicable | 10/27/2022 | Not Applicable | Not Applicable | TBD | TBD | TBA | Job #1 4/17/2023 Final Order Due Date State/Local 12/16/202 |
23 | Mustang Mach-E | 1/20/2023 | 8/25/22 Q4 2022 | 10 Extended Range Q2 23CY Restricted Standard Range Q2 23CY Restricted Q1 23CY Restricted Q4 22CY |
9/22/2022 | 2/24/2023 Q2 23CY | 2/17/2023 Q2 23CY | 3/24/2023 Q2 23CY | 3/17/2023 Q2 23CY | TBA | RESTRICTED AVAILABILITY Job #1 11/4/2022 FINAL ORDER DUE DATE STATE & LOCAL GOVERNMENT 10/21/22 |
24 | Ranger | 1/20/2023 | 1/25/23 Q2 2023 10/27/22 Q1 2023 8/5/22 Q4 2022 |
2 Q2 23CY 2 Q1 23CY 4 Q4 22CY |
9/1/2022 | 2/24/2023 Q2 23CY | 2/17/2023 Q2 23CY | 3/24/2023 Q2 23CY 12/16/2022 Q1 23CY 9/19/2022 Q4 22CY |
3/17/2023 Q2 23CY 12/9/2022 Q1 23CY 9/12/2022 Q4 22CY |
TBA | ALLOCATION APPROVAL REQUIRED (does not apply to Gov't FIN) Job #1 10/27/2022 State and Local Order Cutoff 8/26/22 |
25 | Ranger XL only | 1/20/2023 | 1/25/23 Q2 2023 10/27/22 Q1 2023 8/5/22 Q4 2022 |
2 Q2 23CY 2 Q1 23CY 4 Q4 22CY |
9/1/2022 | 2/24/2023 Q2 23CY | 2/17/2023 Q2 23CY | 3/24/2023 Q2 23CY 12/16/2022 Q1 23CY 9/19/2022 Q4 22CY |
3/17/2022 Q2 23CY 12/9/2022 Q1 23CY 9/12/2022 Q4 22CY |
TBA | ALLOCATION APPROVAL REQUIRED (does not apply to Gov't FIN) Job #1 10/27/2022 State and Local Order Cutoff 8/26/22 |
26 | Super Duty (F250, F350, & F450, F550, & F600) | 1/20/2023 | 1/25/23 Q2 2023 10/27/22 Q1 2023 |
5 Q2 23CY 5 Q1 23CY |
KTP: 12/1/22 Ohio: 12/15/22 |
2/24/2023 Q2 23CY | 2/17/2023 Q2 23CY | 3/24/2023 Q2 23CY 12/23/2022 Q1 23CY |
3/17/2023 Q2 23CY 12/16/2022 Q1 23CY |
TBA | ALLOCATION APPROVAL REQUIRED (does not apply to Gov't FIN) Job #1 KTP: 1/3/23 & Ohio: 2/13/23 STATE & LOCAL ORDER BANK OPEN DATE 11/28/2022 STATE AND LOCAL GOVT FINAL ORDER DUE DATE 1/13/2023 |
27 | e-Transit (Transit BEV) | 1/18/2023 | 5/31/22 | Not Applicable | 6/30/2022 | TBD | TBD | TBD | TBD | TBA | COMMUNICATION WITH FORD PRO IS REQUIRED BEFORE ANY ORDER CAN BE PLACED Job #1 8/25/22 (does not include Retail orders), FINAL ORDER DUE DATE STATE & LOCAL GOVT 3/1/2023 |
29 | Transit Connect (Wagon) | 1/20/2023 | 1/25/23 Q2 2023 10/27/22 Q1 2023 8/16/22 Q4 2022 |
Restricted Q2 23CY 5 Q1 23CY 4 Q4 22CY |
9/16/2022 | 2/24/2023 Q2 23CY | 2/17/2023 Q2 23CY | 3/24/2023 Q2 23CY 11/18/2022 Q1 23CY 9/30/2022 Q4 22CY |
3/17/2023 Q2 23CY 11/11/2022 Q1 23CY 9/23/2022 Q4 22CY |
TBA | ALLOCATION APPROVAL REQUIRED (does not apply to Gov't FIN) Job #1 11/4/2022 FINAL ORDER DUE DATE STATE & LOCAL GOVERNMENT 10/7/22 |
30 | Transit Connect (Van) | 1/20/2023 | 1/25/23 Q2 2023 10/27/22 Q1 2023 8/16/22 Q4 2022 |
Restricted Q2 23CY 5 Q1 23CY 4 Q4 22CY |
9/16/2022 | 2/24/2023 Q2 23CY | 2/17/2023 Q2 23CY | 3/24/2023 Q2 23CY 11/18/2022 Q1 23CY 9/30/2022 Q4 22CY |
3/17/2023 Q2 23CY 11/11/2022 Q1 23CY 9/23/2022 Q4 22CY |
TBA | ALLOCATION APPROVAL REQUIRED (does not apply to Gov't FIN) Job #1 11/4/2022 FINAL ORDER DUE DATE STATE & LOCAL GOVERNMENT 10/7/22 |
33 | Transit(ICE) | 1/20/2023 | 1/25/23 Q2 2023 10/27/22 Q1 2023 5/31/22 Q4 2022 |
5 Q2 23CY 5 Q1 22CY 4 Q4 22CY |
6/30/22 Q4 22CY | 2/24/2023 Q2 23CY | 2/17/2023 Q2 23CY | 3/24/2023 Q2 23CY 12/23/2022 Q1 23CY 8/5/2022 Q4 22CY |
3/17/2023 Q2 23CY 12/16/2022 Q1 23CY 8/1/2022 Q4 22CY |
TBD | ALLOCATION APPROVAL REQUIRED 23MY Government & Municipal (GPC) Order Bank Closing 7/22/22 State/Local/Gov't Order Bank Open 5/31/22 & 23MY Build Out State/Local/Gov't 8/26/22 |
Model | Last Updated | Order Banks Open | Quarterly Cap Volume | Start of Production | FIN with Allocation Build Out Date | Last Date to Submit Orders to Merchants | FIN without Allocation Build Out date (Quarterly Cap) | Last Date to Submit Orders To Merchants | Average Lead Time | Important Updates |
Model | Last Updated | Order Banks Open | ETA for Data Available to Order | Pricing Release Date | Start of Production | Last Date to Submit Orders to Merchants | Build Out Date | Average Lead Time | Important Updates |
---|---|---|---|---|---|---|---|---|---|
Acadia | 06/01/2022 | 3/24/22 | TBD | TBD | 6/6/22 | 6/1/22 | 6/1/22 | TBD | Early 23MY cutoff |
Canyon | 12/13/2022 | 11/3/22 | TBD | TBD | 1/25/23 | 2/3/23 | 2/10/23 | TBD | ALLOCATION REQUIRED 23MY will be late Q4 open order bank & will require Allocation Approval |
Savana (Cargo/Cutaway/Pass) | 09/09/2022 | 6/16/22 | TBD | TBD | 8/15/22 | 10/21/22 | 10/28/22 | TBD | ALLOCATION REQUIRED Cutaway can be ordered with V6 & V8 Engine, Cargo & Passenger Van can only be ordered with V6. No Diesel Engine available for 23MY |
Sierra 1500 Regular MCM | 05/27/2022 | 5/26/22 | TBD | TBD | 8/29/22 | TBD | 5/26/22 | TBD | Early 23MY cutoff |
Sierra 1500 Double MCM | 05/27/2022 | 5/26/22 | TBD | TBD | 9/6/22 | TBD | 5/26/22 | TBD | Early 23MY cutoff |
Sierra 1500 Crew MCM | 05/27/2022 | 5/26/22 | TBD | TBD | 8/29/22 | TBD | 5/26/22 | TBD | Early 23MY cutoff |
Sierra 2500/3500 Regular | 05/27/2022 | 5/26/22 | TBD | TBD | 7/18/22 | TBD | 5/26/22 | TBD | Early 23MY cutoff |
Sierra 2500/3500 Double | 05/27/2022 | 5/26/22 | TBD | TBD | 7/18/22 | TBD | 5/26/22 | TBD | Early 23MY cutoff |
Sierra 2500/3500 Crew | 09/09/2022 | 5/26/22 | TBD | TBD | 7/18/22 | 9/23/22 | 9/30/22 | TBD | ALLOCATION REQUIRED FINAL ORDER CUTOFF 8/24/2022 - 3500 Chassis Cab - 2WD Crew Dual Rear Wheel 60" CA TC31043 & 4WD Crew Cab Dual Rear Wheel 60" CA TK31043 |
Terrain | 09/09/2022 | 6/23/22 | TBD | TBD | 8/22/22 | 11/28/22 | 12/2/22 | TBD | ALLOCATION REQUIRED |
Yukon | 05/24/2022 | 5/19/22 | TBD | TBD | 7/18/22 | 5/23/22 | 5/23/22 | TBD | Early 23MY cutoff |
Yukon XL | 05/24/2022 | 5/19/22 | TBD | TBD | 7/18/22 | 5/23/22 | 5/23/22 | TBD | Early 23MY cutoff |
Model | Last Updated | Order Banks Open | ETA for Data Available to Order | Pricing Release Date | Start of Production | Last Date to Submit Orders to Merchants | Build Out Date | Average Lead Time | Important Updates |
---|---|---|---|---|---|---|---|---|---|
Accent (HC) | 03/23/2022 | TBD | TBD | TBD | TBD | TBD | TBD | No 23MY | |
Elantra N (CN7 N) | 03/23/2022 | TBD | TBD | TBD | TBD | TBD | TBD | TBD | Carry Over Model *3/23/22 Fleet Orders not being accepted at this time |
Elantra (CN7) | 03/23/2022 | TBD | TBD | TBD | TBD | TBD | TBD | TBD | Carry Over Model *3/23/22 Fleet Orders not being accepted at this time |
Ioniq 5 (NE EV) | 03/23/2022 | TBD | TBD | TBD | TBD | TBD | TBD | TBD | Carry Over Model *3/23/22 Fleet Orders not being accepted at this time |
Ioniq AE (PHEV & HEV) | 03/23/2022 | TBD | TBD | TBD | TBD | TBD | TBD | No 23MY | |
Kona (OS Gas) | 03/23/2022 | TBD | TBD | TBD | TBD | TBD | TBD | TBD | Product Enhancement |
Nexo (FE) | 03/23/2022 | TBD | TBD | TBD | TBD | TBD | TBD | TBD | Carry Over Model *3/23/22 Fleet Orders not being accepted at this time |
Palisade (LX2) | 03/23/2022 | TBD | TBD | TBD | TBD | TBD | TBD | TBD | Carry Over Model *3/23/22 Fleet Orders not being accepted at this time |
Santa Fe (TM Gas & HEV) | 03/23/2022 | TBD | TBD | TBD | TBD | TBD | TBD | TBD | Carry Over Model *3/23/22 Fleet Orders not being accepted at this time |
Santa Fe (TM PHEV) | 03/23/2022 | TBD | TBD | TBD | TBD | TBD | TBD | TBD | Carry Over Model *3/23/22 Fleet Orders not being accepted at this time |
Santa Cruz (NX4O8) | 03/23/2022 | TBD | TBD | TBD | TBD | TBD | TBD | TBD | Carry Over Model *3/23/22 Fleet Orders not being accepted at this time |
Sonata (DN8 & DN8 HEV) | 03/23/2022 | TBD | TBD | TBD | TBD | TBD | TBD | TBD | Carry Over Model *3/23/22 Fleet Orders not being accepted at this time |
Tucson (NX4 Gas) | 03/23/2022 | TBD | TBD | TBD | TBD | TBD | TBD | TBD | Carry Over Model *3/23/22 Fleet Orders not being accepted at this time |
Venue (QX) | 03/23/2022 | TBD | TBD | TBD | TBD | TBD | TBD | TBD | Carry Over Model *3/23/22 Fleet Orders not being accepted at this time |
Veloster N (JSN) | 03/23/2022 | TBD | TBD | TBD | TBD | TBD | TBD | TBD | Carry Over Model *3/23/22 Fleet Orders not being accepted at this time |
Model | Last Updated | Order Banks Open | ETA for Data Available to Order | Pricing Release Date | Start of Production | Last Date to Submit Orders to Merchants | Build Out Date | Lead Times | Important Updates |
---|---|---|---|---|---|---|---|---|---|
Grand Cherokee (WL74) | 06/14/2022 | 6/20/22 | TBD | TBD | 7/11/2022 | TBD | TBD | TBD | Built at Jefferson North |
Grand Cherokee (WL75) | 06/14/2022 | 6/20/22 | TBD | TBD | 7/16/2022 | TBD | TBD | TBD | Built at Mack |
Cherokee (KL) | 10/18/2022 | NA | NA | NA | NA | NA | NA | NA | 12/9/22 advised by Stellantis, vehicle will NOT be opening for Fleet Ordering for 23MY Estimated 23MY Order Bank Opening - November Built at Belvidere |
Compass (MP) | 11/07/2022 | 11/7/22 | TBD | TBD | 12/15/22 | TBD | TBD | TBD | Built at Toluca |
Gladiator (JT) | 06/14/2022 | 6/20/22 | TBD | TBD | 9/5/2022 | TBD | TBD | TBD | Built at Toledo Supplier Park. |
Renegade (BV) | 11/08/2022 | 11/07/22 | TBD | TBD | 11/7/22 | TBD | TBD | TBD | Estimated 23MY Order Bank Opening - TBD Built at Melfi |
Wrangler (JL) | 06/14/2022 | 6/20/22 | TBD | TBD | 8/6/2022 | TBD | TBD | TBD | Built at Toledo North. |
Wagoneer & Grand Wagoneer (WS) | 06/14/2022 | 6/20/22 | TBD | TBD | 8/10/2022 | TBD | TBD | TBD | Built at Warren. |
Model | Last Updated | Order Banks Open | ETA for Data Available to Order | Pricing Release Date | Start of Production | Last Date to Submit Orders to Merchants | Build Out Date | Average Lead Time | Important Updates |
---|---|---|---|---|---|---|---|---|---|
Aviator | 01/17/2023 | 3/16/22 | TBD | TBD | 5/19/22 | TBD | TBD | 20 - 22 weeks | Job #1 6/30/22 |
Corsair | 01/17/2023 | 9/12/22 | TBD | TBD | 11/3/22 | TBD | TBD | 14 - 16 weeks | Job #1 1/3/23 |
Corsair PHEV | 01/17/2023 | 9/12/22 | TBD | TBD | 11/3/22 | TBD | TBD | 14 - 16 weeks | Job #1 1/3/23 |
Nautilus | 01/17/2023 | 8/5/22 | TBD | TBD | 9/15/22 | TBD | TBD | 14 - 16 weeks | Job #1 12/13/22 |
Navigator | 01/17/2023 | 8/15/22 | TBD | TBD | 9/22/22 | TBD | TBD | 12 - 14 weeks | Job #1 11/30/22 |
Model | Last Updated | Order Banks Open | ETA for Data Available to Order | Pricing Release Date | Start of Production | Last Date to Submit Orders to Merchants | Build Out Date | Average Lead Time | Important Updates |
---|---|---|---|---|---|---|---|---|---|
C-Sedan | 05/19/2022 | TBD | TBD | TBD | TBD | TBD | TBD | TBD | |
C-Coupe | 05/19/2022 | TBD | TBD | TBD | TBD | TBD | TBD | TBD | |
C-Cab | 05/19/2022 | TBD | TBD | TBD | TBD | TBD | TBD | TBD | |
CLA | 05/19/2022 | TBD | TBD | TBD | TBD | TBD | TBD | TBD | |
CLS | 05/19/2022 | TBD | TBD | TBD | TBD | TBD | TBD | TBD | |
E-Sedan | 05/19/2022 | TBD | TBD | TBD | TBD | TBD | TBD | TBD | |
E-Wagon | 05/19/2022 | TBD | TBD | TBD | TBD | TBD | TBD | TBD | |
E-Coupe | 05/19/2022 | TBD | TBD | TBD | TBD | TBD | TBD | TBD | |
E-Cab | 05/19/2022 | TBD | TBD | TBD | TBD | TBD | TBD | TBD | |
G | 05/19/2022 | TBD | TBD | TBD | TBD | TBD | TBD | TBD | |
GLA | 05/19/2022 | TBD | TBD | TBD | TBD | TBD | TBD | TBD | |
GLB | 05/19/2022 | TBD | TBD | TBD | TBD | TBD | TBD | TBD | |
GLC - SUV | 05/19/2022 | TBD | TBD | TBD | TBD | TBD | TBD | TBD | |
GLC - Coupe | 05/19/2022 | TBD | TBD | TBD | TBD | TBD | TBD | TBD | |
GLE - SUV | 05/19/2022 | TBD | TBD | TBD | TBD | TBD | TBD | TBD | |
GLE - Coupe | 05/19/2022 | TBD | TBD | TBD | TBD | TBD | TBD | TBD | |
GLS | 05/19/2022 | TBD | TBD | TBD | TBD | TBD | TBD | TBD | |
Maybach | 05/19/2022 | TBD | TBD | TBD | TBD | TBD | TBD | TBD | |
GT - Coupe | 05/19/2022 | TBD | TBD | TBD | TBD | TBD | TBD | TBD | |
GT - Roadster | 05/19/2022 | TBD | TBD | TBD | TBD | TBD | TBD | TBD | |
GT - 4dr Coupe | 05/19/2022 | TBD | TBD | TBD | TBD | TBD | TBD | TBD | |
Metris | 05/19/2022 | 6/1/22 | TBD | TBD | 1/1/23 | TBD | TBD | TBD | 23MY - No Fleet Orders Available. Dealer Stock Only |
S-Sedan | 05/19/2022 | TBD | TBD | TBD | TBD | TBD | TBD | TBD | |
Maybach | 05/19/2022 | TBD | TBD | TBD | TBD | TBD | TBD | TBD | |
S-Coupe | 05/19/2022 | TBD | TBD | TBD | TBD | TBD | TBD | TBD | |
S-Cab | 05/19/2022 | TBD | TBD | TBD | TBD | TBD | TBD | TBD | |
Sprinter | 05/19/2022 | 6/15/22 | TBD | TBD | 1/1/23 | TBD | TBD | TBD | 23MY - Fleet production to begin January 2023 |
Model | Last Updated | Order Banks Open | ETA for Data Available to Order | Pricing Release Date | Start of Production | Last Date to Submit Orders to Merchants | Build Out Date | Average Lead Time | Important Updates |
---|---|---|---|---|---|---|---|---|---|
Cooper S Clubman ALL4 | 03/23/2022 | 2/1/22 | TBD | TBD | 3/1/22 | TBD | TBD | 10-12 weeks | |
Cooper S Clubman ALL4 | 03/23/2022 | 2/1/22 | TBD | TBD | 3/1/22 | TBD | TBD | 10-12 weeks | |
John Cooper Works Clubman ALL4 | 03/23/2022 | 2/1/22 | TBD | TBD | 3/1/22 | TBD | TBD | 10-12 weeks | |
Cooper Hardtop 4 door | 03/23/2022 | 2/1/22 | TBD | TBD | 3/1/22 | TBD | TBD | 10-12 weeks | |
Cooper S Hardtop 4 door | 03/23/2022 | 2/1/22 | TBD | TBD | 3/1/22 | TBD | TBD | 10-12 weeks | |
Cooper Hardtop 4dr - Oxford | 03/23/2022 | 2/1/22 | TBD | TBD | 3/1/22 | TBD | TBD | 10-12 weeks | |
Cooper SE Hardtop 2 Door | 03/23/2022 | 2/1/22 | TBD | TBD | 3/1/22 | TBD | TBD | 10-12 weeks | |
Cooper Hardtop 2 Door | 03/23/2022 | 2/1/22 | TBD | TBD | 3/1/22 | TBD | TBD | 10-12 weeks | |
Cooper S Hardtop 2 Door | 03/23/2022 | 2/1/22 | TBD | TBD | 3/1/22 | TBD | TBD | 10-12 weeks | |
John Cooper Works Hardtop | 03/23/2022 | 2/1/22 | TBD | TBD | 3/1/22 | TBD | TBD | 10-12 weeks | |
Cooper Hardtop 2dr - Oxford | 03/23/2022 | 2/1/22 | TBD | TBD | 3/1/22 | TBD | TBD | 10-12 weeks | |
Cooper Convertible | 03/23/2022 | 2/1/22 | TBD | TBD | 3/1/22 | TBD | TBD | 10-12 weeks | |
Cooper S Convertible | 03/23/2022 | 2/1/22 | TBD | TBD | 3/1/22 | TBD | TBD | 10-12 weeks | |
John Cooper Works Convertible | 03/23/2022 | 2/1/22 | TBD | TBD | 3/1/22 | TBD | TBD | 10-12 weeks | |
Cooper Countryman | 03/23/2022 | 2/1/22 | TBD | TBD | 3/1/22 | TBD | TBD | 10-12 weeks | |
Cooper Countryman ALL4 | 03/23/2022 | 2/1/22 | TBD | TBD | 3/1/22 | TBD | TBD | 10-12 weeks | |
Cooper S Countryman | 03/23/2022 | 2/1/22 | TBD | TBD | 3/1/22 | TBD | TBD | 10-12 weeks | |
Cooper S Countryman ALL4 | 03/23/2022 | 2/1/22 | TBD | TBD | 3/1/22 | TBD | TBD | 10-12 weeks | |
John Cooper Works CTM ALL4 | 03/23/2022 | 2/1/22 | TBD | TBD | 3/1/22 | TBD | TBD | 10-12 weeks | |
Cooper SE Countryman ALL4 | 03/23/2022 | 2/1/22 | TBD | TBD | 3/1/22 | TBD | TBD | 10-12 weeks | |
Countryman - Oxford | 03/23/2022 | 2/1/22 | TBD | TBD | 3/1/22 | TBD | TBD | 10-12 weeks | |
Countryman ALL4 - Oxford | 03/23/2022 | 2/1/22 | TBD | TBD | 3/1/22 | TBD | TBD | 10-12 weeks |
Model | Last Updated | Order Banks Open | ETA for Data Available to Order | Pricing Release Date | Start of Production | Last Date to Submit Orders to Merchants | Build Out Date | Average Lead Time | Important Updates |
---|---|---|---|---|---|---|---|---|---|
Altima | 10/07/2022 | 5/26/22 | TBD | TBD | TBD | 10/17/21 | 10/21/2022 | TBD | Approval from Nissan required Delivery begins September 2022 |
Ariya (electric crossover) | 10/07/2022 | NA 23MY | NA 23MY | NA 23MY | NA 23MY | NA 23MY | NA 23MY | NA 23MY | NA 23MY |
Armada | 10/07/2022 | 5/26/22 | TBD | TBD | TBD | 10/17/21 | 10/21/2022 | TBD | Approval from Nissan required Delivery begins January 2023 |
Frontier | 10/07/2022 | 5/26/22 | TBD | TBD | TBD | 10/17/21 | 10/21/2022 | TBD | Approval from Nissan required Delivery begins September 2022 |
Kicks | 10/07/2022 | 5/26/22 | TBD | TBD | TBD | 10/17/21 | 10/21/2022 | TBD | Approval from Nissan required Delivery begins September 2022 |
Leaf | 10/07/2022 | 5/26/22 | TBD | TBD | TBD | 10/17/21 | 10/21/2022 | TBD | Approval from Nissan required Delivery begins June 2022 |
Maxima | 10/07/2022 | 5/26/22 | TBD | TBD | TBD | 10/17/21 | 10/21/2022 | TBD | Approval from Nissan required Delivery begins September 2022 |
Murano | 10/07/2022 | 5/26/22 | TBD | TBD | TBD | 10/17/21 | 10/21/2022 | TBD | Approval from Nissan required Delivery begins August 2022 |
Pathfinder | 07/25/2022 | 5/26/22 | TBD | TBD | TBD | 7/22/2022 | 7/22/2022 | TBD | Approval from Nissan required Delivery begins August 2022 Early Model Year Cutoff - 23MY |
Rogue | 07/25/2022 | 1/18/23 5/26/22 | TBD | TBD | TBD | (was 7/22/2022) | (was 7/20/2022) | TBD | *1/18/23 Nissan re-opened the 23MY Nissan Rogue. NO allocation needed. Production extended to January 2024 Approval from Nissan required Delivery begins August 2022 Early Model Year Cutoff - 23MY |
Rogue Sport | 10/07/2022 | NA 23MY | NA 23MY | NA 23MY | NA 23MY | NA 23MY | NA 23MY | NA 23MY | NA 23MY |
Sentra | 10/07/2022 | 8/15/22 | TBD | TBD | TBD | 9/7/2022 | TBD | Approval from Nissan required Delivery begins February 2023 | |
Titan (Incl XD) | 10/07/2022 | 5/26/22 | TBD | TBD | TBD | 10/17/21 | 10/21/2022 | TBD | Approval from Nissan required Delivery begins August 2022 |
Versa | 10/07/2022 | 5/26/22 | TBD | TBD | TBD | 10/17/21 | 10/21/2022 | TBD | Approval from Nissan required Delivery begins November 2022 |
370Z Coupe | 10/07/2022 | NA 23MY | NA 23MY | NA 23MY | NA 23MY | NA 23MY | NA 23MY | NA 23MY | NA 23MY |
Model | Last Updated | Order Banks Open | ETA for Data Available to Order | Pricing Release Date | Start of Production | Last Date to Submit Orders to Merchants | Build Out Date | Average Lead Time | Important Updates |
---|---|---|---|---|---|---|---|---|---|
1500 DT (New Models) | 10/04/2022 | 9/2/22 | TBD | TBD | 11/1/2022 | 10/4/22 | 10/4/22 | TBD | Early 2023 Model Year Cutoff Estimated 23MY Order Bank Opening - September Built at SHAP. |
1500 Quad & Crew (DS) | 11/07/2022 | 11/7/22 | TBD | TBD | 1/3/2023 | TBD | TBD | TBD | Built at Warren |
1500 Regular (DS) | 11/07/2022 | 11/7/22 | TBD | TBD | 1/3/2023 | TBD | TBD | TBD | Built at Saltillo Truck |
2500 All Trims (DJ) | 10/20/2022 | 9/12/2022 | TBD | TBD | 12/1/2022 | 9/15/22 | 9/16/22 | TBD | Early 2023 Model Year Cutoff Estimated 23MY Order Bank Opening - September Built at Saltillo Truck. |
3500 All Trims (D2/DD/DF) | 10/20/2022 | 9/12/2022 | TBD | TBD | 12/1/2022 | 9/15/22 | 9/16/22 | TBD | Early 2023 Model Year Cutoff Estimated 23MY Order Bank Opening - September Built at Saltillo Truck. |
4500/5500 All Trims (DP) | 10/20/2022 | 9/12/2022 | TBD | TBD | 12/1/2022 | 9/15/22 | 9/16/22 | TBD | Early 2023 Model Year Cutoff Estimated 23MY Order Bank Opening - September Built at Saltillo Truck. |
ProMaster (VF) | 06/27/2022 | 6/20/2022 | TBD | TBD | 7/29/2022 | 6/27/22 | 6/27/22 | TBD | Early 2023 Model Year Cutoff Built at Saltillo Truck |
ProMaster City (VM) | 06/14/2022 | NA | NA | NA | NA | NA | NA | NA | Model Discontinued |
no data available
>> Back to Top
Model | Last Updated | Order Banks Open | ETA for Data Available to Order | Pricing Release Date | Start of Production | Last Date to Submit Orders to Merchants | Build Out Date | Average Lead Time | Important Updates |
---|---|---|---|---|---|---|---|---|---|
Ascent | 06/22/2022 | 9/15/22 | TBD | 8/15/22 | 10/15/22 | TBD | TBD | TBD | ALLOCATION APPROVAL REQUIRED OTD for base option code vehicles will be up to 120 days after the first delivery month has occurred. First Delivery Month: TBA. |
Crosstrek | 06/22/2022 | 6/15/22 | TBD | 5/15/22 | 7/15/22 | TBD | TBD | TBD | ALLOCATION APPROVAL REQUIRED OTD for base option code vehicles will be up to 120 days after the first delivery month has occurred. First Delivery Month: TBA. |
Legacy | 06/22/2022 | 8/15/22 | TBD | 7/15/22 | 8/15/22 | TBD | TBD | TBD | ALLOCATION APPROVAL REQUIRED OTD for base option code vehicles will be up to 120 days after the first delivery month has occurred. First Delivery Month: TBA. |
Outback | 06/22/2022 | 8/15/22 | TBD | 7/15/22 | 8/15/22 | TBD | TBD | TBD | ALLOCATION APPROVAL REQUIRED OTD for base option code vehicles will be up to 120 days after the first delivery month has occurred. First Delivery Month: TBA. |
Impreza | 06/22/2022 | 6/25/22 | TBD | 6/25/22 | 8/15/22 | TBD | TBD | TBD | ALLOCATION APPROVAL REQUIRED OTD for base option code vehicles will be up to 120 days after the first delivery month has occurred. First Delivery Month: TBA. |
Forester | 06/22/2022 | 9/25/22 | TBD | 8/15/22 | 10/15/22 | TBD | TBD | TBD | ALLOCATION APPROVAL REQUIRED OTD for base option code vehicles will be up to 120 days after the first delivery month has occurred. First Delivery Month: TBA. |
Solterra | NA | NA | NA | NA | NA | NA | No Fleet Allocation |
Model | Last Updated | Order Banks Open | ETA for Data Available to Order | Pricing Release Date | Start of Production | Last Date to Submit Orders to Merchants | Build Out Date | Average Lead Time | Important Updates |
---|---|---|---|---|---|---|---|---|---|
4Runner | 12/16/2022 | 06/10/22 | TBD | TBD | 8/1/22 | 2/3/2023 | 2/10/2023 | TBD | 23MY - Requests reviewed and approved on case by case basis. Toyota Approval Required Carry Over. October delivery Please note that 4Runner is built in Japan (VINS start with “J”) and unique shipping restrictions apply. Toyota cutoff for the month is the 10th of the month. |
Avalon Gas/Hybrid | 10/04/2022 | NA | NA | NA | NA | NA | NA | NA | Avalon DISCONTINUED (per Robert Larson at Toyota 5/31/22) |
bZ4X | 12/16/2022 | 5/10/22 | TBD | TBD | 7/1/22 | 2/3/2023 | 2/10/2023 | TBD | 23MY - Requests reviewed and approved on case by case basis. Toyota Approval Required New Model. September delivery Production will begin for vehicles in ZEV states only in late-April/early-May .. *ZEV states = CA, CO, CT, MA, MD, ME, NY, NJ, OR, RI, VT Toyota cutoff for the month is the 10th of the month. |
C-HR | 10/04/2022 | TBD | TBD | TBD | TBD | TBD | TBD | TBD | Carry Over. November delivery Please note that C-HR is built in Japan (VINS start with “J”) and unique shipping restrictions apply. Toyota cutoff for the month is the 10th of the month. |
Camry Gas/Hybrid | 12/16/2022 | 5/10/22 | TBD | TBD | 7/1/22 | 1/3/2023 | 1/10/2023 | TBD | 23MY - Requests reviewed and approved on case by case basis. Toyota Approval Required 23MY Model 2549 Discontinued - Minor Changes/Updates. September delivery Toyota cutoff for the month is the 10th of the month. |
Corolla Gas | 12/16/2022 | 7/11/22 | TBD | TBD | 9/1/22 | 2/3/2023 | 2/10/2023 | TBD | 23MY - Requests reviewed and approved on case by case basis. Toyota Approval Required Carry Over. November delivery Toyota cutoff for the month is the 10th of the month. |
Corolla Hybrid | 12/16/2022 | 7/11/22 | TBD | TBD | 9/1/22 | 2/3/2023 | 2/10/2023 | TBD | 23MY - Requests reviewed and approved on case by case basis. Toyota Approval Required Carry Over. November delivery Toyota cutoff for the month is the 10th of the month. |
Corolla Hatchback | 12/16/2022 | 7/11/22 | TBD | TBD | 9/1/22 | 2/3/2023 | 2/10/2023 | TBD | 23MY - Requests reviewed and approved on case by case basis. Toyota Approval Required Carry Over. November delivery Please note that Corolla Hatchback is built exclusively in Japan and unique shipping restrictions apply. Toyota cutoff for the month is the 10th of the month. |
Corolla Cross | 12/16/2022 | 8/8/22 | TBD | TBD | 10/1/22 | 2/3/2023 | 2/10/2023 | TBD | 23MY - Requests reviewed and approved on case by case basis. Toyota Approval Required Carry Over. December 2022 delivery Toyota cutoff for the month is the 10th of the month. |
Corolla Cross Hybrid | 12/16/2022 | 1/10/23 | TBD | TBD | 3/1/23 | 2/3/2023 | 2/10/2023 | TBD | 23MY - Requests reviewed and approved on case by case basis. Toyota Approval Required NEW. May 2023 delivery Toyota cutoff for the month is the 10th of the month. |
Crown | 12/16/2022 | 11/10/22 | TBD | TBD | 1/1/23 | 2/3/2023 | 2/10/2023 | TBD | 23MY - Requests reviewed and approved on case by case basis. Toyota Approval Required NEW. March 2023 delivery Toyota cutoff for the month is the 10th of the month. |
GR86 | 12/16/2022 | 4/1/22 | TBD | TBD | 6/1/22 | 2/3/2023 | 2/10/2023 | TBD | 23MY - Requests reviewed and approved on case by case basis. Toyota Approval Required Carry Over. August delivery Toyota cutoff for the month is the 10th of the month. |
GR Supra | 12/16/2022 | 5/1/22 | TBD | TBD | 7/1/22 | 2/3/2023 | 2/10/2023 | TBD | 23MY Requests reviewed and approved on case by case basis. Toyota Approval Required Carry Over. November delivery Toyota cutoff for the month is the 10th of the month. |
Highlander Gas/Hybrid | 12/16/2022 | 7/11/22 | TBD | TBD | 9/1/22 | 2/3/2023 | 2/10/2023 | TBD | 23MY - Requests reviewed and approved on case by case basis. Toyota Approval Required Carry Over. November Delivery Toyota cutoff for the month is the 10th of the month. |
Mirai (fuel cell) | 12/16/2022 | 10/10/22 | TBD | TBD | 12/1/22 | 2/3/2023 | 2/10/2023 | TBD | 23MY - Requests reviewed and approved on case by case basis. Toyota Approval Required Carry Over. January 2023 delivery All New - CA deliveries only. Pre-approval required prior to ordering. Toyota cutoff for the month is the 10th of the month. |
Prius | 12/16/2022 | 10/10/22 | TBD | TBD | 12/1/22 | 2/3/2023 | 2/10/2023 | TBD | 23MY - Requests reviewed and approved on case by case basis. Toyota Approval Required Carry Over. February 2023 delivery Please note that Prius is built exclusively in Japan and unique shipping restrictions apply. Toyota cutoff for the month is the 10th of the month. |
Prius Prime (Plug In) | 10/04/2022 | 10/10/22 | TBD | TBD | 12/1/22 | TBD | TBD | TBD | 23MY - Requests reviewed and approved on case by case basis. Toyota Approval Required Carry Over. February 2023 Delivery Please note that Prius is built exclusively in Japan and unique shipping restrictions apply. Toyota cutoff for the month is the 10th of the month. |
RAV4 Gas/Hybrid | 12/16/2022 | 8/8/22 | TBD | TBD | 10/1/22 | 2/3/2023 | 2/10/2023 | TBD | 23MY - Requests reviewed and approved on case by case basis. Toyota Approval Required Carry Over. December 2022 Delivery. Some RAV4's are built in Japan. Toyota cutoff for the month is the 10th of the month. |
RAV4 Prime (Plug In) | 12/16/2022 | 8/8/22 | TBD | TBD | 10/1/22 | 2/3/2023 | 2/10/2023 | TBD | 23MY - Requests reviewed and approved on case by case basis. Toyota Approval Required Carry Over. December 2022 Delivery. Some RAV4's are built in Japan. Toyota cutoff for the month is the 10th of the month. |
Sequoia Hybrid | 12/16/2022 | 5/10/22 | TBD | TBD | 7/1/22 | 2/3/2023 | 2/10/2023 | TBD | 23MY Requests reviewed and approved on case by case basis. Toyota Approval Required. NEW. September 2023 delivery Toyota cutoff for the month is the 10th of the month. |
Sienna Hybrid | 12/16/2022 | 6/10/22 | TBD | TBD | 8/1/22 | 2/3/2023 | 2/10/2023 | TBD | 23MY Requests reviewed and approved on case by case basis. Toyota Approval Required Carry Over. October 2022 Delivery Toyota cutoff for the month is the 10th of the month. |
Tacoma | 12/16/2022 | 6/10/22 | TBD | TBD | 8/1/22 | 2/3/2023 | 2/10/2023 | TBD | 23MY Requests reviewed and approved on case by case basis. Toyota Approval Required Carry Over. October 2022 Delivery Toyota cutoff for the month is the 10th of the month. |
Tundra Gas/Hybrid | 12/16/2022 | 6/10/22 | TBD | TBD | 8/1/22 | 1/3/2023 | 1/10/2023 | TBD | 23MY Requests reviewed and approved on case by case basis. Toyota Approval Required Carry Over. October 2022 Delivery Toyota cutoff for the month is the 10th of the month. |
Venza | 12/16/2022 | 8/8/22 | TBD | TBD | 10/1/22 | 2/3/2023 | 2/10/2023 | TBD | 23MY Requests reviewed and approved on case by case basis. Toyota Approval Required Carry Over. December 2022 delivery Toyota cutoff for the month is the 10th of the month. |
Model | Last Updated | Order Banks Open | ETA for Data Available to Order | Pricing Release Date | Start of Production | Last Date to Submit Orders to Merchants | Build Out Date | Average Lead Time | Important Updates |
---|---|---|---|---|---|---|---|---|---|
Arteon | 01/16/2023 | 6/6/22 | TBD | TBD | 7/11/22 | 1/26/23 | 1/31/2023 | 14 - 18 weeks | *VW Sales Mgr apprval needed Delivery Into Market 8/29/22 Built in Emden, Germany |
Atlas (2.0L & V6) | 01/16/2023 | 5/30/22 | TBD | TBD | 7/25/22 | 1/26/23 | 1/31/2023 | 14 - 18 weeks | *VW Sales Mgr apprval needed Delivery Into Market 8/8/22 Built in Chattanooga, TN |
Atlas Cross Sport (2.0L & V6) | 01/16/2023 | 5/30/22 | TBD | TBD | 7/25/22 | 1/26/23 | 1/31/2023 | 14 - 18 weeks | *VW Sales Mgr apprval needed Delivery Into Market 8/8/22 Built in Chattanooga, TN |
Golf R | 06/08/2022 | NA | NA | NA | NA | NA | NA | NA | RETAIL ONLY |
GTI | 01/16/2023 | 6/6/22 | TBD | TBD | 7/11/22 | 1/26/23 | 1/31/2023 | 14 - 18 weeks | *VW Sales Mgr apprval needed Delivery Into Market 9/19/22 Built in Wolfsburg, Germany |
Jetta incl. GLI | 01/16/2023 | 5/30/22 | TBD | TBD | 7/25/22 | TBD | 1/13/2023 | 14 - 18 weeks | *VW Sales Mgr apprval needed Delivery Into Market 8/22/22 Built in Puebla, Mexico |
Passat | 06/08/2022 | NA | NA | NA | NA | NA | NA | NA | 2023MY DISCONTINUED |
Tiguan | 01/16/2023 | 5/30/22 | TBD | TBD | 8/22/22 | 1/26/23 | 1/31/2023 | 14 - 18 weeks | *VW Sales Mgr apprval needed Delivery Into Market 9/19/22 Built in Puebla, Mexico |
ID.4 RWD 82kWh | 01/16/2023 | 8/22/22 | TBD | TBD | 9/19/22 | 1/26/23 | 1/31/2023 | 14 - 18 weeks | *VW Sales Mgr apprval needed Delivery Into Market 10/24/22 Built in Chattanooga, TN (23MY) |
ID.4 AWD 82kWh | 01/16/2023 | 6/27/22 | TBD | TBD | 7/25/22 | 1/26/23 | 1/31/2023 | 14 - 18 weeks | *VW Sales Mgr apprval needed Delivery Into Market 10/24/22 Built in Chattanooga, TN (23MY) |
ID.4 RWD 62kWh | 01/16/2023 | 10/17/22 | TBD | TBD | 11/14/22 | 1/26/23 | 1/31/2023 | 14 - 18 weeks | *VW Sales Mgr apprval needed Delivery Into Market 11/14/22 Built in Chattanooga, TN (23MY) |
Taos (FWD/AWD) | 01/16/2023 | 5/30/22 | TBD | TBD | 7/25/22 | 1/26/23 | 1/31/2023 | 14 - 18 weeks | *VW Sales Mgr apprval needed Delivery Into Market 8/22/22 Built in Puebla, Mexico |
Model | Last Updated | Order Banks Open | ETA for Data Available to Order | Pricing Release Date | Start of Production | Last Date to Submit Orders to Merchants | Build Out Date | Average Lead Time | Important Updates |
---|---|---|---|---|---|---|---|---|---|
S60 (All Models) | 10/20/2022 | 5/1/2022 | TBD | TBD | 6/1/2022 | TBD | 10/20/22 | 28-35 weeks | Deliveries Begin September 2022 |
S90 (All Models) | 05/03/2022 | 5/1/2022 | TBD | TBD | 6/1/2022 | TBD | TBD | 34-38 weeks | Deliveries Begin September 2022 |
V60 (All Models) | 05/03/2022 | 5/1/2022 | TBD | TBD | 6/1/2022 | TBD | TBD | 26-32 weeks | Deliveries Begin September 2022 |
V90 (All Models) | 05/03/2022 | 5/1/2022 | TBD | TBD | 6/1/2022 | TBD | TBD | 26-32 weeks | Deliveries Begin September 2022 |
XC40 (All Models) | 05/03/2022 | 5/1/2022 | TBD | TBD | 6/1/2022 | TBD | TBD | 31-40 weeks | Deliveries Begin September 2022 |
XC60 (All Models) | 10/20/2022 | 5/1/2022 | TBD | TBD | 6/1/2022 | TBD | 10/20/22 | 28-35 weeks | Deliveries Begin September 2022 |
XC90 (All Models) | 05/03/2022 | 5/1/2022 | TBD | TBD | 6/1/2022 | TBD | TBD | 28-35 weeks | Deliveries Begin September 2022 |