OEM Updates, All in One Place

Manufacturers’ Information

Manufacturers’ Build-out and Start-up Dates for 2021

Find valuable build out and order bank information on popular fleet vehicles, consolidated into one easy to navigate location. Below you can click through any of the various manufacturers’ build-out and start-up dates for US cars and US trucks. Please be aware these dates change regularly.

Quick Menu: 2022 Build-outs

Select a Manufacturer:

Audi | Buick | Cadillac | Chevrolet | Chrysler | Dodge | Ford | GMC | Hyundai | Infiniti | Jeep | Lincoln | Mazda | Mercedes | Nissan | RAM | Subaru | Toyota | Volkswagen | Volvo

Audi

Model Last Updated Order Banks Open ETA for Data Available to Order Pricing Release Date Start of Production Last Date to Submit Orders to Merchants Build Out Date Average Lead Time Important Updates
A4/S4 04/02/2021 April 2020 April 2020 TBD 7/29/2019 03/24/2021 3/31/2021 8-12 weeks Unless noted, all production start dates are the week of.
A5/S5 04/02/2021 April 2020 April 2020 TBD 7/29/2019 03/24/2021 3/31/2021 8-12 weeks 5/29/2020 - A5 Sportback 4.0 TFSI q, production week August 3rd
A6/S6/RS6 04/02/2021 April 2020 April 2020 TBD 7/29/2019 03/24/2021 3/31/2021 8-12 weeks 5/29/2020 - A6 Sedan 4.5 TFSI+ q, production week of November 23rd. R6 Avant Ordering start is TBD
A7/S7/RS7 04/02/2021 April 2020 April 2020 TBD 7/29/2019 03/24/2021 3/31/2021 8-12 weeks
A8/S8 04/02/2021 April 2020 April 2020 TBD 7/29/2019 03/24/2021 3/31/2021 8-12 weeks
e-tron quattro/sportback 04/02/2021 TBD TBD TBD 8/10/2020 TBD TBD 8-12 weeks
Q3 04/02/2021 April 2020 April 2020 TBD 7/29/2019 03/24/2021 3/31/2021 8-12 weeks 5/29/2020 - Q3 4.0 TFSI q, production week of November 23rd
Q5/SQ5 04/02/2021 June 2020 June 2020 TBD 7/29/2019 03/24/2021 3/31/2021 8-12 weeks 5/29/2020 - Q5 4.5 TFSI q, production week of August 17th
Q7/SQ7 04/02/2021 April 2020 April 2020 TBD 7/29/2019 03/24/2021 3/31/2021 8-12 weeks 5/29/2020 - Q7 4.5 TFSI q, production week of August 31st
Q8/SQ8/RSQ8 04/02/2021 April 2020 April 2020 TBD 7/29/2019 03/24/2021 3/31/2021 12-16 weeks 5/29/2020 - R8 V10 Spyder/Coupe, production week of June 29th
TT/TTS/TTRS Coupe/Roadster 04/02/2021 April 2020 April 2020 TBD 6/29/2019 03/24/2021 3/31/2021 12-16 weeks 5/29/2020 TT Coupe/Roadster = production week July 29 TTS Coupe = production week August 10th TT RS Coupe = production week October 12th
Model Last Updated Order Banks Open ETA for Data Available to Order Pricing Release Date Start of Production Last Date to Submit Orders to Merchants Build Out Date Average Lead Time Important Updates

>> Back to Top

Buick

Model Last Updated Order Banks Open ETA for Data Available to Order Pricing Release Date Start of Production Last Date to Submit Orders to Merchants Build Out Date Average Lead Time Important Updates
Encore 12/09/2020 02/27/2020 TBD 5/7/19 6/1/2020 12/10/20 12/17/20 24-26 weeks
Encore GX 12/09/2020 03/26/2020 TBD 5/7/19 7/20/2020 12/10/20 12/17/20 24-26 weeks
Envision 01/14/2021 07/16/2020 TBD 2/12/19 8/5/2020 2/11/21 1/12/21 20 - 22 weeks
Enclave 04/12/2021 08/13/2020 TBD 5/7/19 10/12/2020 7/23/21 7/30/21 10 - 12 weeks
Model Last Updated Order Banks Open ETA for Data Available to Order Pricing Release Date Start of Production Last Date to Submit Orders to Merchants Build Out Date Average Lead Time Important Updates

>> Back to Top

Cadillac

Model Last Updated Order Banks Open ETA for Data Available to Order Pricing Release Date Start of Production Last Date to Submit Orders to Merchants Build Out Date Average Lead Time Important Updates
CT4 01/14/2021 7/2/2020 TBD 10/9/2019 9/28/2020 4/15/2021 1/12/2021 10 - 12 weeks
CT5 01/14/2021 7/2/2020 TBD 7/17/2019 9/28/2020 4/15/2021 1/12/2021 10 - 12 weeks
Escalade/Escalade ESV 02/26/2021 4/23/2020 TBD 5/24/2019 9/7/2020 5/1/2021 5/6/2021 14 - 16 weeks
XT4 01/14/2021 6/28/1010 TBD 5/24/2019 8/20/2020 2/11/2021 1/12/2021 12 - 14 weeks
XT5 01/14/2021 7/2/2020 TBD 7/9/2019 8/26/2020 3/18/2021 1/12/2021 12 - 14 weeks
XT6 01/14/2021 7/2/2020 TBD 4/8/2019 8/26/2020 3/18/2021 1/12/2021 12 - 14 weeks
Model Last Updated Order Banks Open ETA for Data Available to Order Pricing Release Date Start of Production Last Date to Submit Orders to Merchants Build Out Date Average Lead Time Important Updates

>> Back to Top

Chevrolet


>> Back to Top

Chrysler

Model Last Updated Order Banks Open ETA for Data Available to Order Pricing Release Date Start of Production Last Date to Submit Orders to Merchants Build Out Date Average Lead Time Important Updates
300 02/26/2021 10/06/2020 TBD 11/5/2019 11/9/2020 7/29/21 8/5/21 8-10 weeks
Pacifica 02/26/2021 10/06/2020 TBD 7/25/2019 11/10/2020 4/1/21 4/8/21 8-10 weeks Pacifica (RU-PHEV) Start of Production is 11/16/2020.
Voyager 02/26/2021 10/06/2020 TBD 7/25/2019 11/10/2020 4/1/21 4/8/21 8-10 weeks
Model Last Updated Order Banks Open ETA for Data Available to Order Pricing Release Date Start of Production Last Date to Submit Orders to Merchants Build Out Date Average Lead Time Important Updates

>> Back to Top

Dodge

Model Last Updated Order Banks Open ETA for Data Available to Order Pricing Release Date Start of Production Last Date to Submit Orders to Merchants Build Out Date Average Lead Time Important Updates
Challenger 02/26/2021 10/06/2020 TBD 11/5/2019 11/9/2020 7/29/21 8/5/21 8-10 weeks
Charger 02/26/2021 10/06/2020 TBD 11/5/2019 11/9/2020 7/29/21 8/5/21 8-10 weeks
Durango 02/26/2021 08/06/2020 TBD 7/8/2020 10/5/2020 4/1/21 4/8/21 8-10 weeks
Grand Caravan 09/19/2020 N/A N/A N/A N/A N/A N/A 2020MY is the final production year. Not available in the following states due to EPA regulations: CA, CT, DE, ME, MD, MA, NJ, NY, OR, PA, RI, VT & WA
Journey 09/19/2020 TBD 12/11/2019 N/A N/A N/A 10-12 weeks N/A for sale in California Emission States (CA & CT)
Model Last Updated Order Banks Open ETA for Data Available to Order Pricing Release Date Start of Production Last Date to Submit Orders to Merchants Build Out Date Average Lead Time Important Updates

>> Back to Top

Ford


>> Back to Top

GMC

Model Last Updated Order Banks Open ETA for Data Available to Order Pricing Release Date Start of Production Last Date to Submit Orders to Merchants Build Out Date Average Lead Time Important Updates
Acadia 01/12/2021 07/02/2020 TBD TBD 08/24/2020 3/18/2021 1/12/2021 12 - 14 weeks
Canyon 12/09/2020 01/30/2020 TBD TBD 06/26/2020 12/10/2020 12/17/2020 12 - 14 weeks Additional 4 - 6 weeks for Ship-Thru
Savana (Cargo/Cutaway/Pass) 12/30/2020 07/30/2020 TBD TBD 10/10/2020 12/25/2020 1/1/2021 18 - 22 weeks Additional 4 - 6 weeks for Ship-Thru
Sierra 1500 Regular 12/30/2020 07/16/2020 TBD TBD 09/14/2020 12/25/2020 1/1/2021 18 - 22 weeks Additional 4 - 6 weeks for Ship-Thru
Sierra 1500 Double 12/30/2020 07/16/2020 TBD TBD 09/14/2020 12/25/2020 1/1/2021 18 - 22 weeks Additional 4 - 6 weeks for Ship-Thru
Sierra 1500 Crew 12/30/2020 07/16/2020 TBD TBD 09/14/2020 12/25/2020 1/1/2021 18 - 22 weeks Additional 4 - 6 weeks for Ship-Thru
Sierra 2500/3500 Regular 12/30/2020 06/04/2020 TBD TBD 09/28/2020 12/25/2020 1/1/2021 18 - 22 weeks Additional 4 - 6 weeks for Ship-Thru
Sierra 2500/3500 Double 12/30/2020 06/04/2020 TBD TBD 09/28/2020 12/25/2020 1/1/2021 18 - 22 weeks Additional 4 - 6 weeks for Ship-Thru
Sierra 2500/3500 Crew 12/30/2020 06/04/2020 TBD TBD 09/28/2020 12/25/2020 1/1/2021 18 - 22 weeks Additional 4 - 6 weeks for Ship-Thru
Terrain 01/14/2021 07/30/2020 TBD TBD 09/21/2020 2/11/2021 1/12/2021 12 - 14 weeks
Yukon 02/26/2021 01/30/2020 TBD TBD 06/08/2020 5/1/2021 5/6/2021 12 - 14 weeks
Yukon XL 02/26/2021 01/30/2020 TBD TBD 07/13/2020 5/1/2021 5/6/2021 12 - 14 weeks
Model Last Updated Order Banks Open ETA for Data Available to Order Pricing Release Date Start of Production Last Date to Submit Orders to Merchants Build Out Date Average Lead Time Important Updates

>> Back to Top

Hyundai

Model Last Updated Order Banks Open ETA for Data Available to Order Pricing Release Date Start of Production Last Date to Submit Orders to Merchants Build Out Date Average Lead Time Important Updates
Accent 9/21/2020 4/1/2020 TBD TBD 6/1/2020 TBD TBD 12-16 weeks
Elantra 9/21/2020 6/1/2020 TBD TBD 9/1/2020 TBD TBD 12-16 weeks
Elantra GT 9/21/2020 N/A TBD TBD N/A TBD TBD 12-16 weeks
Ioniq EV 9/21/2020 5/1/2020 TBD TBD 8/1/2020 TBD TBD 12-16 weeks
Ioniq HEV/PHEV 9/21/2020 5/1/2020 TBD TBD 8/1/2020 TBD TBD 12-16 weeks
Kona 9/21/2020 4/1/2020 TBD TBD 6/1/2020 TBD TBD 12-16 weeks
Palisade 9/21/2020 4/1/2020 TBD TBD 6/1/2020 TBD TBD 12-16 weeks
Santa Fe 9/21/2020 9/1/2020 TBD TBD 9/1/2020 TBD TBD 12-16 weeks
Sonata Gas 9/21/2020 5/1/2020 TBD TBD 7/1/2020 TBD TBD 12-16 weeks
Sonata HEV 9/21/2020 8/1/2020 TBD TBD 7/1/2020 TBD TBD 12-16 weeks
Tucson 9/21/2020 4/1/2020 TBD TBD 6/1/2020 TBD TBD 12-16 weeks
Veloster 9/21/2020 1/1/2020 2/1/2020 TBD 4/1/2020 TBD TBD 12-16 weeks
Venue 9/21/2020 5/1/2020 TBD TBD 7/1/2020 TBD TBD 12-16 weeks
Model Last Updated Order Banks Open ETA for Data Available to Order Pricing Release Date Start of Production Last Date to Submit Orders to Merchants Build Out Date Average Lead Time Important Updates

>> Back to Top

Infiniti

Model Last Updated Order Banks Open ETA for Data Available to Order Pricing Release Date Start of Production Last Date to Submit Orders to Merchants Build Out Date Average Lead Time Important Updates
Q50 12/09/2020 3/15/2020 TBD TBD 3/15/2020 2/22/2021 3/1/2021 16-24 weeks Deliveries begin 09/2020
Q60 12/09/2020 4/15/2020 TBD TBD 4/15/2020 2/22/2021 3/1/2021 16-24 weeks Deliveries begin 09/2020
QX50 12/09/2020 6/15/2020 TBD TBD 6/15/2020 5/25/2021 6/1/2021 16-24 weeks Deliveries begin 09/2020
QX55 12/09/2020 TBD TBD TBD TBD TBD TBD TBD TBD
QX60 12/09/2020 TBD TBD TBD TBD TBD TBD TBD TBD
QX80 12/09/2020 1/15/2020 TBD TBD 1/15/2020 2/22/2021 3/1/2021 16-24 weeks Deliveries begin 09/2020
Model Last Updated Order Banks Open ETA for Data Available to Order Pricing Release Date Start of Production Last Date to Submit Orders to Merchants Build Out Date Average Lead Time Important Updates

>> Back to Top

Jeep

Model Last Updated Order Banks Open ETA for Data Available to Order Pricing Release Date Start of Production Last Date to Submit Orders to Merchants Build Out Date Average Lead Time Important Updates
Cherokee 02/26/2021 7/8/2020 TBD 6/21/2019 8/31/2020 4/1/21 4/8/21 8-10 weeks
Grand Cherokee 02/26/2021 8/6/2020 TBD 6/21/2019 9/14/2020 4/1/21 4/8/21 8-10 weeks
Compass 02/26/2021 6/5/2020 TBD 6/21/2019 7/30/2020 3/1/21 3/4/21 10-12 weeks
Gladiator 02/26/2021 7/8/2020 TBD 4/8/2019 8/19/2020 4/1/21 4/8/21 10-12 weeks
Renegade 02/26/2021 TBD TBD TBD 9/15/2020 4/1/21 4/8/21 8-10 weeks
Wrangler 02/26/2021 7/8/2020 TBD 7/2/2019 8/11/2020 4/1/21 4/8/21 8-10 weeks
Model Last Updated Order Banks Open ETA for Data Available to Order Pricing Release Date Start of Production Last Date to Submit Orders to Merchants Build Out Date Average Lead Time Important Updates

>> Back to Top

Lincoln

Model Last Updated Order Banks Open ETA for Data Available to Order Pricing Release Date Start of Production Last Date to Submit Orders to Merchants Build Out Date Average Lead Time Important Updates
Aviator 04/01/2021 7/13/2020 TBD TBD 9/23/2020 3/5/21 3/5/21 14 - 16 weeks Early Balance Out Paint: Crystal Copper, Blue Diamond, Magnetic Gray. Job 1 - 09/21/2020.
Continental 12/09/2020 N/A N/A N/A N/A N/A N/A Not available in 2021.
Corsair 04/01/2021 7/13/2020 TBD TBD 10/5/2020 4/26/21 4/30/21 16-18 weeks PHEV (plug -in) - 4/05/2021.
MKZ 12/09/2020 N/A N/A N/A N/A N/A N/A Not available in 2021.
Nautilus 12/09/2020 10/23/2020 TBD TBD 1/25/2021 TBD TBD 16-18 weeks Job 1 - 1/25/2021.
Navigator 12/09/2020 9/16/2020 TBD TBD 11/30/2020 TBD TBD 12-14 weeks
Model Last Updated Order Banks Open ETA for Data Available to Order Pricing Release Date Start of Production Last Date to Submit Orders to Merchants Build Out Date Average Lead Time Important Updates

>> Back to Top

Mercedes


>> Back to Top

Nissan

Model Last Updated Order Banks Open ETA for Data Available to Order Pricing Release Date Start of Production Last Date to Submit Orders to Merchants Build Out Date Average Lead Time Important Updates
Frontier 4/12/2021 9/15/2020 9/15/2020 TBD 9/15/2020 3/26/2021 4/1/2021 16-20 weeks Deliveries begin 02/2021
Altima Sedan 4/12/2021 4/15/2020 4/15/2020 TBD 4/15/2020 4/26/2021 4/11/2021 12-16 weeks Deliveries begin 10/2020
Armada 12/9/2020 7/15/2020 7/15/2020 TBD 1/1/2021 1/25/2021 2/1/2021 16-20 weeks Deliveries begin 01/2021
Kicks 4/12/2021 8/15/2020 6/15/2020 TBD 8/15/2020 7/26/2021 4/11/2021 16-20 weeks Deliveries begin 02/2021
Leaf 12/9/2020 7/15/2020 7/15/2020 TBD 7/15/2020 1/25/2021 1/1/2021 16-20 weeks Deliveries begin 12/2020
Maxima 4/12/2021 5/15/2020 5/15/2020 TBD 5/15/2020 7/26/2021 4/11/2021 16-20 weeks Deliveries begin 11/2020
Murano 4/12/2021 7/15/2020 7/15/2020 TBD 7/15/2020 5/25/2021 4/11/2021 16-20 weeks Deliveries begin 12/2020
NV 1500/2500/3500 12/9/2020 5/15/2020 5/15/2020 TBD 5/15/2020 11/18/2020 11/25/2020 16-20 weeks Deliveries begin 11/2020
NV Cargo/Passenger 12/9/2020 5/15/2020 5/15/2020 TBD 5/15/2020 11/18/2020 11/25/2020 16-20 weeks Deliveries begin 11/2020
NV200 12/9/2020 7/15/2020 7/15/2020 TBD 7/15/2020 2/3/2021 2/10/2021 16-20 weeks Deliveries begin 12/2020
Pathfinder 12/9/2020 TBD TBD TBD TBD TBD TBD TBD TBD
Rogue 4/12/2021 3/15/2020 3/15/2020 TBD 3/15/2020 5/25/2021 4/11/2021 16-20 weeks Deliveries begin 11/2020
Rogue Sport 4/12/2021 7/15/2020 7/15/2020 TBD 7/15/2020 8/25/2021 4/11/2021 16-20 weeks Deliveries begin 01/2021
Sentra 4/12/2021 6/15/2020 6/15/2020 TBD 6/15/2020 5/25/2021 4/11/2021 12-20 weeks Deliveries begin 12/2020
Titan 4/12/2021 4/15/2020 4/15/2020 TBD 4/15/2020 8/25/2021 4/11/2021 16-20 weeks Deliveries begin 09/2020
Versa Sedan 4/12/2021 4/15/2020 4/15/2020 TBD 4/15/2020 6/24/2021 4/11/2021 16-20 weeks Deliveries begin 11/2020
370Z Coupe 12/9/2020 TBD TBD TBD TBD TBD TBD TBD  
370Z Roadster 12/9/2020 TBD TBD TBD TBD TBD TBD TBD  
Model Last Updated Order Banks Open ETA for Data Available to Order Pricing Release Date Start of Production Last Date to Submit Orders to Merchants Build Out Date Average Lead Time Important Updates

>> Back to Top

RAM

Model Last Updated Order Banks Open ETA for Data Available to Order Pricing Release Date Start of Production Last Date to Submit Orders to Merchants Build Out Date Average Lead Time Important Updates
1500 (DT) 02/26/2021 07/08/2020 TBD 6/20/2019 8/31/2020 2/26/2021 3/1/2021 10-12 weeks
1500 Quad & Crew (DS) 04/01/2021 11/06/2020 TBD 11/5/2019 11/16/2020 4/1/2021 4/8/2021 10-12 weeks
1500 Regular (DS) 04/01/2021 11/06/2020 TBD 11/5/2019 11/23/2020 4/1/2021 4/8/2021 10-12 weeks
2500 Pickup 3500 Pickup & Chassis (DJ) 02/26/2021 09/04/2020 TBD 9/26/2019 11/17/2020 2/26/2021 3/1/2021 10-12 weeks
4500/5500 Chassis Cabs (DP) 02/26/2021 09/04/2020 TBD 9/26/2019 10/12/2020 2/26/2021 3/1/2021 12-14 weeks
ProMaster 02/26/2021 TBD TBD 8/18/2020 12/21/2020 12/28/2020 14 - 16 weeks
ProMaster City 04/01/2021 TBD TBD 9/1/2020 4/1/2021 4/8/2021 18-20 weeks Pool orders have a 6 week lead time.
Model Last Updated Order Banks Open ETA for Data Available to Order Pricing Release Date Start of Production Last Date to Submit Orders to Merchants Build Out Date Average Lead Time Important Updates

>> Back to Top

Subaru

Model Last Updated Order Banks Open ETA for Data Available to Order Pricing Release Date Start of Production Last Date to Submit Orders to Merchants Build Out Date Average Lead Time Important Updates
Ascent 1/14/2021 Early July 6/30/2020 6/30/2020 6/30/2020 5/5/2021 5/12/2021 8 - 10 weeks OTD for base option code vehicles will be up to 120 days after the first delivery month has occurred.
BRZ 1/14/2021 N/A N/A N/A N/A N/A TBD 8 - 10 weeks no 2021 model
Crosstrek 4/1/2021 Early July 7/1/2020 7/1/2020 7/1/2020 9/17/2021 9/24/2021 8 - 10 weeks OTD for base option code vehicles will be up to 120 days after the first delivery month has occurred.
Legacy 1/14/2021 Mid August 8/1/2020 8/1/2020 8/1/2020 1/6/2021 1/13/2021 8 - 10 weeks OTD for base option code vehicles will be up to 120 days after the first delivery month has occurred.
Outback 1/14/2021 Mid August 8/1/2020 8/1/2020 8/1/2020 1/6/2021 1/13/2021 8 - 10 weeks OTD for base option code vehicles will be up to 120 days after the first delivery month has occurred.
Impreza 4/1/2021 Mid August 8/1/2020 8/1/2020 8/1/2020 4/1/2021 4/6/2021 8 - 10 weeks OTD for base option code vehicles will be up to 120 days after the first delivery month has occurred.
Forester 4/1/2021 Early August 7/1/2020 7/1/2020 7/1/2020 8/20/2021 8/27/2021 8 - 10 weeks OTD for base option code vehicles will be up to 120 days after the first delivery month has occurred.
WRX/STi 1/14/2021 Mid January TBD 1/1/2021 TBD TBD TBD 8 - 10 weeks
Model Last Updated Order Banks Open ETA for Data Available to Order Pricing Release Date Start of Production Last Date to Submit Orders to Merchants Build Out Date Average Lead Time Important Updates

>> Back to Top

Toyota

Model Last Updated Order Banks Open ETA for Data Available to Order Pricing Release Date Start of Production Last Date to Submit Orders to Merchants Build Out Date Average Lead Time Important Updates
4Runner 04/02/2021 06/01/2020 6/10/2019 5/31/2019 08/01/2020 5/3/2021 5/10/2021 17-19 weeks Please note that 4Runner is built in Japan (VINS start with “J”) and unique shipping restrictions apply.
Avalon Gas/Hybrid 04/02/2021 05/01/2020 5/10/2019 5/1/2020 07/01/2020 4/5/2021 4/12/2021 8-12 weeks
C-HR 04/02/2021 06/01/2020 6/10/2019 5/31/2019 08/01/2020 9/3/2021 9/10/2021 17-19 weeks Please note that C-HR is built in Japan (VINS start with “J”) and unique shipping restrictions apply.
Camry Gas/Hybrid 04/02/2021 07/01/2020 6/10/2019 5/31/2019 09/01/2020 4/5/2021 4/12/2021 8-12 weeks
Corolla Gas/Hybrid 04/02/2021 02/01/2020 N/A 12/4/2018 04/01/2020 3/3/2021 3/10/2021 8-15 weeks
Corolla Hatchback 04/02/2021 04/01/2020 7/10/2019 6/1/2020 06/01/2020 4/5/2021 4/12/2021 12-16 weeks Please note that Corolla Hatchback is built exclusively in Japan and unique shipping restrictions apply.
Highlander Gas/Hybrid 04/02/2021 06/01/2020 9/10/2019 N/A 08/01/2020 6/3/2021 6/10/2021 10-12 weeks
Land Cruiser 04/02/2021 06/01/2020 6/10/2019 TBD 08/01/2020 1/4/2021 1/11/2021 12-16 weeks Please note that Land Cruiser is built exclusively in Japan and unique shipping restrictions apply.
Mirai (fuel cell) 04/02/2021 10/02/1010 9/10/2019 TBD 12/01/2020 5/3/2021 5/10/2021 12-16 weeks All New - CA deliveries only. Pre-approval required prior to ordering.
Prius 04/02/2021 06/01/2020 6/10/2019 TBD 08/01/2020 3/3/2021 3/10/2021 16-20 weeks Please note that Prius is built exclusively in Japan and unique shipping restrictions apply.
Prius Prime 04/02/2021 05/01/2020 3/12/2019 3/5/2019 07/01/2020 3/3/2021 3/10/2021 16-20 weeks Please note that Prius is built exclusively in Japan and unique shipping restrictions apply.
RAV4 Gas/Hybrid 04/02/2021 06/01/2020 6/10/2019 5/30/2019 08/01/2020 8/3/2021 8/10/2021 8-12 weeks Some RAV4's are built in Japan.
RAV4 Prime 04/02/2021 05/01/2020 N/A TBD 07/01/2020 8/3/2021 8/10/2021 16-20 weeks Please note that RAV4 Prime is built exclusively in Japan and unique shipping restrictions apply.
Sequoia 04/02/2021 06/01/2020 5/10/2019 TBD 08/01/2020 4/5/2021 4/12/2021 16-20 weeks
Sienna 04/02/2021 08/01/2020 1/3/2019 1/31/2019 10/01/2020 5/3/2021 5/10/2021 8-10 weeks All New - Hybrid only. No models come factory equipped with a spare tire.
Supra 04/02/2021 01/01/2020 1/10/2019 TBD 03/01/2020 TBD TBD 8-10 weeks
Tacoma 04/02/2021 06/01/2020 6/10/2019 TBD 08/01/2020 5/3/2021 5/10/2021 16-20 weeks Limited Availability
Tundra 04/02/2021 05/01/2020 5/11/2019 5/9/2018 07/01/2020 7/5/2021 7/12/2021 8-16 weeks Limited Availability
Venza 04/02/2021 06/01/2020 N/A TBD 08/01/2020 9/3/2021 9/10/2021 8-12 weeks All new hybrid AWD model.
Yaris Sedan/Hatchback 04/02/2021 10/01/2020 5/11/2019 5/3/2019 12/01/2020 TBD TBD 12-16 weeks
Model Last Updated Order Banks Open ETA for Data Available to Order Pricing Release Date Start of Production Last Date to Submit Orders to Merchants Build Out Date Average Lead Time Important Updates

>> Back to Top

Volkswagen

Model Last Updated Order Banks Open ETA for Data Available to Order Pricing Release Date Start of Production Last Date to Submit Orders to Merchants Build Out Date Average Lead Time Important Updates
Arteon 04/02/2021 7/17/2020 N/A N/A 09/07/2020 8/9/2021 8/16/2021 12-14 weeks First estimated delivery to dealer = 11/23/2020.
Atlas 04/02/2021 7/22/2020 N/A N/A 09/28/2020 5/31/2021 6/7/2021 12-14 weeks 2021.5MY production date 9/28/20. First estimated delivery to dealer = 3/23/2020.
Atlas Cross Sport 04/02/2021 6/12/2020 N/A N/A 09/28/2020 5/31/2021 6/7/2021 12-14 weeks First estimated delivery to dealer = 10/5/2020.
BEV Crossover 04/02/2021 TBD N/A N/A 5/31/2021 6/7/2021 TBD
Golf 04/02/2021 6/12/2020 N/A N/A 8/25/2021 9/1/2020 *Golf is discontinued for MY22. First estimated delivery to dealer = 11/17/2020.
GTI 04/02/2021 6/12/2020 N/A N/A 8/25/2021 9/1/2020 *Golf is discontinued for MY22. First estimated delivery to dealer = 10/19/2020.
Jetta 1.4T 04/02/2021 6/12/2020 N/A N/A 09/28/2020 7/9/2021 7/16/2021 12-14 weeks First estimated delivery to dealer = 10/19/2020.
Jetta GLI 04/02/2021 6/12/2020 N/A N/A 09/28/2020 8/25/2021 9/1/2021 12-14 weeks First estimated delivery to dealer = 10/19/2020.
Passat 04/02/2021 6/12/2020 N/A N/A 09/28/2020 5/17/2021 5/24/2021 12-14 weeks First estimated delivery to dealer = 10/5/2020
Tiguan 04/02/2021 6/12/2020 N/A N/A 08/31/2020 5/17/2021 5/24/2021 12-14 weeks First estimated delivery to dealer = 10/5/2020
ID.4 RWD 04/02/2021 TBD N/A N/A 10/12/2020 TBD TBD 12-14 weeks First estimated delivery to dealer = 12/21/2020
ID.4 AWD 04/02/2021 TBD N/A N/A 03/08/2021 TBD TBD 12-14 weeks First estimated delivery to dealer = 05/02/2021
Model Last Updated Order Banks Open ETA for Data Available to Order Pricing Release Date Start of Production Last Date to Submit Orders to Merchants Build Out Date Average Lead Time Important Updates