OEM Updates, All in One Place

Manufacturers’ Information

Manufacturers’ Build-out and Start-up Dates for 2021

Find valuable build out and order bank information on popular fleet vehicles, consolidated into one easy to navigate location. Below you can click through any of the various manufacturers’ build-out and start-up dates for US cars and US trucks. Please be aware these dates change regularly.

Quick Menu: 2020 Build-outs | 2022 Build-outs

Select a Manufacturer:

Audi | Buick | Cadillac | Chevrolet | Chrysler | Dodge | Ford | GMC | Hyundai | Infiniti | Jeep | Lincoln | Mazda | Mercedes | Nissan | RAM | Subaru | Toyota | Volkswagen | Volvo

Audi

ModelLast UpdatedOrder Banks OpenETA for Data Available to OrderPricing Release DateStart of ProductionLast Date to Submit Orders to MerchantsBuild Out DateAverage Lead TimeImportant Updates
A4/S405/29/2020April 2020April 2020TBD7/29/2019TBDTBD8-12 weeksUnless noted, all production start dates are the week of.
A5/S505/29/2020April 2020April 2020TBD7/29/2019TBDTBD8-12 weeks5/29/2020 - A5 Sportback 4.0 TFSI q, production week August 3rd
A6/S6/RS605/29/2020April 2020April 2020TBD7/29/2019TBDTBD8-12 weeks5/29/2020 - A6 Sedan 4.5 TFSI+ q, production week of November 23rd. R6 Avant Ordering start is TBD
A7/S7/RS705/29/2020April 2020April 2020TBD7/29/2019TBDTBD8-12 weeks
A8/S805/29/2020April 2020April 2020TBD7/29/2019TBDTBD8-12 weeks
e-tron quattro/sportback05/29/2020TBDTBDTBD8/10/2020TBDTBD8-12 weeks
Q305/29/2020April 2020April 2020TBD7/29/2019TBDTBD8-12 weeks5/29/2020 - Q3 4.0 TFSI q, production week of November 23rd
Q5/SQ505/29/2020June 2020June 2020TBD7/29/2019TBDTBD8-12 weeks5/29/2020 - Q5 4.5 TFSI q, production week of August 17th
Q7/SQ705/29/2020April 2020April 2020TBD7/29/2019TBDTBD8-12 weeks5/29/2020 - Q7 4.5 TFSI q, production week of August 31st
Q8/SQ8/RSQ805/29/2020April 2020April 2020TBD7/29/2019TBDTBD12-16 weeks5/29/2020 - R8 V10 Spyder/Coupe, production week of June 29th
TT/TTS/TTRS Coupe/Roadster05/29/2020April 2020April 2020TBD6/29/2019TBDTBD12-16 weeks5/29/2020 TT Coupe/Roadster = production week July 29 TTS Coupe = production week August 10th TT RS Coupe = production week October 12th
ModelLast UpdatedOrder Banks OpenETA for Data Available to OrderPricing Release DateStart of ProductionLast Date to Submit Orders to MerchantsBuild Out DateAverage Lead TimeImportant Updates

>> Back to Top

Buick

ModelLast UpdatedOrder Banks OpenETA for Data Available to OrderPricing Release DateStart of ProductionLast Date to Submit Orders to MerchantsBuild Out DateAverage Lead TimeImportant Updates
Encore12/09/202002/27/2020TBD5/7/196/1/202012/10/2012/17/2024-26 weeks
Encore GX12/09/202003/26/2020TBD5/7/197/20/202012/10/2012/17/2024-26 weeks
Envision01/14/202107/16/2020TBD2/12/198/5/20202/11/211/12/2120 - 22 weeks
Enclave12/09/202008/13/2020TBD5/7/1910/12/20204/15/214/22/2110 - 12 weeks
ModelLast UpdatedOrder Banks OpenETA for Data Available to OrderPricing Release DateStart of ProductionLast Date to Submit Orders to MerchantsBuild Out DateAverage Lead TimeImportant Updates

>> Back to Top

Cadillac

ModelLast UpdatedOrder Banks OpenETA for Data Available to OrderPricing Release DateStart of ProductionLast Date to Submit Orders to MerchantsBuild Out DateAverage Lead TimeImportant Updates
CT401/14/20217/2/2020TBD10/9/20199/28/20204/15/20211/12/202110 - 12 weeks
CT501/14/20217/2/2020TBD7/17/20199/28/20204/15/20211/12/202110 - 12 weeks
Escalade/Escalade ESV01/14/20214/23/2020TBD5/24/20199/7/2020TBDTBD14 - 16 weeks
XT401/14/20216/28/1010TBD5/24/20198/20/20202/11/20211/12/202112 - 14 weeks
XT501/14/20217/2/2020TBD7/9/20198/26/20203/18/20211/12/202112 - 14 weeks
XT601/14/20217/2/2020TBD4/8/20198/26/20203/18/20211/12/202112 - 14 weeks
ModelLast UpdatedOrder Banks OpenETA for Data Available to OrderPricing Release DateStart of ProductionLast Date to Submit Orders to MerchantsBuild Out DateAverage Lead TimeImportant Updates

>> Back to Top

Chevrolet

ModelLast UpdatedOrder Banks OpenETA for Data Available to OrderPricing Release DateStart of ProductionLast Date to Submit Orders to MerchantsBuild Out DateAverage Lead TimeImportant Updates
Blazer01/14/202106/04/2020TBDTBD8/24/20203/18/20211/12/202113-15 weeksContraints: LS Model, WBL Redline
Bolt12/09/202010/08/2020TBDTBD11/16/202012/10/202012/17/202016 - 20 weeks
Camaro01/14/202103/26/2020TBDTBD8/6/20204/1/20211/12/202115 -17 weeks
Colorado12/09/202001/30/2020TBDTBD6/26/202012/10/202012/17/202012-14 weeksCrew Cab
Corvette12/09/2020TBDTBDTBDTBDTBD20- 24 weeksNot Fleet Eligible
Equinox01/14/202107/30/2020TBDTBD9/21/20202/11/20211/12/202113-15 weeks
Express (Cargo/Cutaway/Pass)12/30/202007/30/2020TBDTBD10/10/202012/25/20201/1/202116 - 18 weeks
LCF 3500/4500 Gas12/09/202007/02/2020TBDTBD11/1/2020TBDTBD
LCF 4500/5500 HD/XD Diesel12/09/202008/29/20199/10/2019TBD1/1/20209/8/20209/15/2020
LCF 6500 XD Diesel12/09/202009/12/20199/10/2019TBD4/1/20209/23/20209/30/2020
Malibu01/14/202107/02/2020TBDTBD9/2/20204/15/20211/12/202113-15 weeksConstraint: PCV Sport Edition_x000D_
Silverado 1500 Regular12/30/202007/16/2020TBDTBD9/14/202012/25/20201/1/202118 - 22 weeksAdditional 4 - 6 weeks for Ship-Thru
Silverado 1500 Double12/30/202007/16/2020TBDTBD9/14/202012/25/20201/1/202118 - 22 weeksAdditional 4 - 6 weeks for Ship-Thru
Silverado 1500 Crew12/30/202007/16/2020TBDTBD9/14/202012/25/20201/1/202118 - 22 weeksAdditional 4 - 6 weeks for Ship-Thru
Silverado 2500/3500 Regular12/30/202006/04/2020TBDTBD9/28/202012/25/20201/1/202118 - 22 weeksAdditional 4 - 6 weeks for Ship-Thru
Silverado 2500/3500 Double12/30/202006/04/2020TBDTBD9/28/202012/25/20201/1/202118 - 22 weeksAdditional 4 - 6 weeks for Ship-Thru
Silverado 2500/3500 Crew12/30/202006/04/2020TBDTBD9/28/202012/25/20201/1/202118 - 22 weeksAdditional 4 - 6 weeks for Ship-Thru Contraints for HD Crew Cab only: Gas Engine, Power Retractable Running Board, Z71 Sport Edition, Midnight Edition, Dual Tank Gas Engine, Cherry Red Tintcoat, Trailboss, Rally Edition, Custom Trailboss, 4.3L V6 engine (LV3) w/o Rear Differential (G80)
Silverado Medium Duty12/09/202007/30/2020TBDTBD11/30/20201/14/20211/21/202118 - 22 weeksAdditional 4 - 6 weeks for Ship-Thru
Sonic12/09/2020TBDTBDTBDTBDTBD
Spark01/14/202103/12/2020TBDTBD6/1/20204/1/20211/12/202128 - 30 weeks
Suburban12/09/202001/30/2020TBDTBD7/13/2020TBDTBD13-15 weeksTechnology Package, LPO Wheel 22" Bright Chrome, LPO All Weather Floor Liners (1st/2nd row), Z71 Signature Package, Diesel Engine, Power Sliding Module
Tahoe12/09/202001/30/2020TBDTBD6/8/2020TBDTBD13-15 weeksTechnology Package, LPO Wheel 22" Bright Chrome, LPO All Weather Floor Liners (1st/2nd row), Z71 Signature Package, Diesel Engine, Power Sliding Module
Tahoe Police12/09/202009/24/2020TBDTBDTBD3/18/20213/25/2021
Trailblazer12/09/202012/05/2019TBDTBDTBD12/10/202012/17/2020Constraint: AWD
Traverse12/09/202008/13/2020TBDTBD10/12/20204/15/20214/22/202112 - 14 weeks
Trax12/09/202002/27/2020TBDTBD6/8/202012/10/202012/17/202028 - 30 weeksContraints: FWD, LS Models
ModelLast UpdatedOrder Banks OpenETA for Data Available to OrderPricing Release DateStart of ProductionLast Date to Submit Orders to MerchantsBuild Out DateAverage Lead TimeImportant Updates

>> Back to Top

Chrysler

ModelLast UpdatedOrder Banks OpenETA for Data Available to OrderPricing Release DateStart of ProductionLast Date to Submit Orders to MerchantsBuild Out DateAverage Lead TimeImportant Updates
30009/19/202010/06/2020TBD11/5/201911/9/2020TBDTBD8-10 weeks
Pacifica09/19/202010/06/2020TBD7/25/201911/10/2020TBDTBD8-10 weeksPacifica (RU-PHEV) Start of Production is 11/16/2020.
Voyager09/19/202010/06/2020TBD7/25/201911/10/2020TBDTBD8-10 weeks
ModelLast UpdatedOrder Banks OpenETA for Data Available to OrderPricing Release DateStart of ProductionLast Date to Submit Orders to MerchantsBuild Out DateAverage Lead TimeImportant Updates

>> Back to Top

Dodge

ModelLast UpdatedOrder Banks OpenETA for Data Available to OrderPricing Release DateStart of ProductionLast Date to Submit Orders to MerchantsBuild Out DateAverage Lead TimeImportant Updates
Challenger09/19/202010/06/2020TBD11/5/201911/9/2020TBDTBD8-10 weeks
Charger09/19/202010/06/2020TBD11/5/201911/9/2020TBDTBD8-10 weeks
Durango09/19/202008/06/2020TBD7/8/202010/5/2020TBDTBD8-10 weeks
Grand Caravan09/19/2020N/AN/AN/AN/AN/AN/A2020MY is the final production year. Not available in the following states due to EPA regulations: CA, CT, DE, ME, MD, MA, NJ, NY, OR, PA, RI, VT & WA
Journey09/19/2020TBD12/11/2019N/AN/AN/A10-12 weeksN/A for sale in California Emission States (CA & CT)
ModelLast UpdatedOrder Banks OpenETA for Data Available to OrderPricing Release DateStart of ProductionLast Date to Submit Orders to MerchantsBuild Out DateAverage Lead TimeImportant Updates

>> Back to Top

Ford

ModelLast UpdatedOrder Banks OpenETA for Data Available to OrderPricing Release DateStart of ProductionLast Date to Submit Orders to MerchantsBuild Out DateAverage Lead TimeImportant Updates
Bronco12/09/20207/14/20TBDTBD10/26/20TBDTBD18-20 weeksJob 1 – 3/22/2021
Bronco Sport12/09/20207/14/20TBDTBD10/26/20TBDTBD16-18 weeks
Econoline12/09/20209/16/201910/2/201912/12/20191/2/202010/2/202010/9/202016-18 weeks
Ecosport12/09/20204/15/2020TBDTBD9/1/2020TBDTBD20 - 22 weeks
Edge12/09/202010/23/2020TBDTBD1/25/2021TBDTBD18-20 weeks
Escape12/09/202010/12/2020TBDTBD1/4/2021TBDTBD16-18 weeks
Explorer (Retail/Fleet/Police)12/09/20207/13/2020TBDTBD9/23/2020TBDTBD12-14 weeks
Expedition12/09/20209/16/2020TBDTBD11/30/2020TBDTBD14 - 16 weels
F15012/09/20207/15/2020TBDTBDDTP - 10/12/2020 KC - 11/9/2020TBDTBD12 - 14 weeksLPO paint Job 1 - 01/11/2021.
Medium Truck12/09/20209/16/2020TBDTBD2/3/202010/2/202010/9/202012 - 14 weelsSkipped MY20 See MY22 information.
Motorhome12/09/20209/16/2020TBDTBD12/14/2020TBDTBD24-26 weeksJob 1 – 12/14/2020
Mustang12/09/202010/12/2020TBDTBD1/4/2021TBDTBD16-18 weeks
Mustang Mach-E12/09/20206/22/2020TBDTBD10/26/2020TBDTBD14 - 16 weels
Ranger12/09/20209/14/2020TBDTBD12/7/2020TBDTBD16-18 weeksJob 1 – 12/7/2020
Super Duty01/20/20218/17/2020TBDTBD10/26/20201/18/211/20/2116-18 weeks*Restricted paint (LPO) will be scheduled in batches and may result in a scheduling delay of 6 or more weeks.
Transit12/09/202010/12/2020TBDTBD1/11/2021TBDTBD16-18 weeksVSO: 02/08/2021
Transit Connect12/09/20202/28/2020TBDTBD6/26/202012/10/2012/17/2020-22 weeksYellow School Bus: Incremental 8 weeks
ModelLast UpdatedOrder Banks OpenETA for Data Available to OrderPricing Release DateStart of ProductionLast Date to Submit Orders to MerchantsBuild Out DateAverage Lead TimeImportant Updates

>> Back to Top

GMC

ModelLast UpdatedOrder Banks OpenETA for Data Available to OrderPricing Release DateStart of ProductionLast Date to Submit Orders to MerchantsBuild Out DateAverage Lead TimeImportant Updates
Acadia01/12/202107/02/2020TBDTBD08/24/20203/18/20211/12/202112 - 14 weeks
Canyon12/09/202001/30/2020TBDTBD06/26/202012/10/202012/17/202012 - 14 weeksAdditional 4 - 6 weeks for Ship-Thru
Savana (Cargo/Cutaway/Pass)12/30/202007/30/2020TBDTBD10/10/202012/25/20201/1/202118 - 22 weeksAdditional 4 - 6 weeks for Ship-Thru
Sierra 1500 Regular12/30/202007/16/2020TBDTBD09/14/202012/25/20201/1/202118 - 22 weeksAdditional 4 - 6 weeks for Ship-Thru
Sierra 1500 Double12/30/202007/16/2020TBDTBD09/14/202012/25/20201/1/202118 - 22 weeksAdditional 4 - 6 weeks for Ship-Thru
Sierra 1500 Crew12/30/202007/16/2020TBDTBD09/14/202012/25/20201/1/202118 - 22 weeksAdditional 4 - 6 weeks for Ship-Thru
Sierra 2500/3500 Regular12/30/202006/04/2020TBDTBD09/28/202012/25/20201/1/202118 - 22 weeksAdditional 4 - 6 weeks for Ship-Thru
Sierra 2500/3500 Double12/30/202006/04/2020TBDTBD09/28/202012/25/20201/1/202118 - 22 weeksAdditional 4 - 6 weeks for Ship-Thru
Sierra 2500/3500 Crew12/30/202006/04/2020TBDTBD09/28/202012/25/20201/1/202118 - 22 weeksAdditional 4 - 6 weeks for Ship-Thru
Terrain01/14/202107/30/2020TBDTBD09/21/20202/11/20211/12/202112 - 14 weeks
Yukon12/09/202001/30/2020TBDTBD06/08/2020TBDTBD12 - 14 weeks
Yukon XL12/09/202001/30/2020TBDTBD07/13/2020TBDTBD12 - 14 weeks
ModelLast UpdatedOrder Banks OpenETA for Data Available to OrderPricing Release DateStart of ProductionLast Date to Submit Orders to MerchantsBuild Out DateAverage Lead TimeImportant Updates

>> Back to Top

Hyundai

ModelLast UpdatedOrder Banks OpenETA for Data Available to OrderPricing Release DateStart of ProductionLast Date to Submit Orders to MerchantsBuild Out DateAverage Lead TimeImportant Updates
Accent9/21/20204/1/2020TBDTBD6/1/2020TBDTBD12-16 weeks
Elantra9/21/20206/1/2020TBDTBD9/1/2020TBDTBD12-16 weeks
Elantra GT9/21/2020N/ATBDTBDN/ATBDTBD12-16 weeks
Ioniq EV9/21/20205/1/2020TBDTBD8/1/2020TBDTBD12-16 weeks
Ioniq HEV/PHEV9/21/20205/1/2020TBDTBD8/1/2020TBDTBD12-16 weeks
Kona9/21/20204/1/2020TBDTBD6/1/2020TBDTBD12-16 weeks
Palisade9/21/20204/1/2020TBDTBD6/1/2020TBDTBD12-16 weeks
Santa Fe9/21/20209/1/2020TBDTBD9/1/2020TBDTBD12-16 weeks
Sonata Gas9/21/20205/1/2020TBDTBD7/1/2020TBDTBD12-16 weeks
Sonata HEV9/21/20208/1/2020TBDTBD7/1/2020TBDTBD12-16 weeks
Tucson9/21/20204/1/2020TBDTBD6/1/2020TBDTBD12-16 weeks
Veloster9/21/20201/1/20202/1/2020TBD4/1/2020TBDTBD12-16 weeks
Venue9/21/20205/1/2020TBDTBD7/1/2020TBDTBD12-16 weeks
ModelLast UpdatedOrder Banks OpenETA for Data Available to OrderPricing Release DateStart of ProductionLast Date to Submit Orders to MerchantsBuild Out DateAverage Lead TimeImportant Updates

>> Back to Top

Infiniti

ModelLast UpdatedOrder Banks OpenETA for Data Available to OrderPricing Release DateStart of ProductionLast Date to Submit Orders to MerchantsBuild Out DateAverage Lead TimeImportant Updates
Q5012/09/20203/15/2020TBDTBD3/15/20202/22/20213/1/202116-24 weeksDeliveries begin 09/2020
Q6012/09/20204/15/2020TBDTBD4/15/20202/22/20213/1/202116-24 weeksDeliveries begin 09/2020
QX5012/09/20206/15/2020TBDTBD6/15/20205/25/20216/1/202116-24 weeksDeliveries begin 09/2020
QX5512/09/2020TBDTBDTBDTBDTBDTBDTBDTBD
QX6012/09/2020TBDTBDTBDTBDTBDTBDTBDTBD
QX8012/09/20201/15/2020TBDTBD1/15/20202/22/20213/1/202116-24 weeksDeliveries begin 09/2020
ModelLast UpdatedOrder Banks OpenETA for Data Available to OrderPricing Release DateStart of ProductionLast Date to Submit Orders to MerchantsBuild Out DateAverage Lead TimeImportant Updates

>> Back to Top

Jeep

ModelLast UpdatedOrder Banks OpenETA for Data Available to OrderPricing Release DateStart of ProductionLast Date to Submit Orders to MerchantsBuild Out DateAverage Lead TimeImportant Updates
Cherokee09/19/20207/8/2020TBD6/21/20198/31/2020TBDTBD8-10 weeks
Grand Cherokee09/19/20208/6/2020TBD6/21/20199/14/2020TBDTBD8-10 weeks
Compass09/19/20206/5/2020TBD6/21/20197/30/2020TBDTBD10-12 weeks
Gladiator09/19/20207/8/2020TBD4/8/20198/19/2020TBDTBD10-12 weeks
Renegade09/19/2020TBDTBDTBD9/15/2020TBDTBD8-10 weeks
Wrangler09/19/20207/8/2020TBD7/2/20198/11/2020TBDTBD8-10 weeks
ModelLast UpdatedOrder Banks OpenETA for Data Available to OrderPricing Release DateStart of ProductionLast Date to Submit Orders to MerchantsBuild Out DateAverage Lead TimeImportant Updates

>> Back to Top

Lincoln

ModelLast UpdatedOrder Banks OpenETA for Data Available to OrderPricing Release DateStart of ProductionLast Date to Submit Orders to MerchantsBuild Out DateAverage Lead TimeImportant Updates
Aviator12/09/20207/13/2020TBDTBD9/23/2020TBDTBD14 - 16 weeksEarly Balance Out Paint: Crystal Copper, Blue Diamond, Magnetic Gray. Job 1 - 09/21/2020.
Continental12/09/2020N/AN/AN/AN/AN/AN/ANot available in 2021.
Corsair12/09/20207/13/2020TBDTBD10/5/2020TBDTBD16-18 weeksPHEV (plug -in) - 4/05/2021.
MKZ12/09/2020N/AN/AN/AN/AN/AN/ANot available in 2021.
Nautilus12/09/202010/23/2020TBDTBD1/25/2021TBDTBD16-18 weeksJob 1 - 1/25/2021.
Navigator12/09/20209/16/2020TBDTBD11/30/2020TBDTBD12-14 weeks
ModelLast UpdatedOrder Banks OpenETA for Data Available to OrderPricing Release DateStart of ProductionLast Date to Submit Orders to MerchantsBuild Out DateAverage Lead TimeImportant Updates

>> Back to Top

Mercedes

ModelLast UpdatedOrder Banks OpenETA for Data Available to OrderPricing Release DateStart of ProductionLast Date to Submit Orders to MerchantsBuild Out DateAverage Lead TimeImportant Updates
C-Sedan12/9/20202/1/2020N/ATBD7/1/2020TBDTBD16-18 weeksC350WE & C350W4E = DISCONTINUED Production ends May 2021
C-Coupe12/9/20201/1/20207/1/2019TBD6/1/2020TBDTBD16-18 weeks
C-Cab12/9/20201/1/20207/1/2019TBD6/1/2020TBDTBD16-18 weeks
CLA12/9/20201/1/20208/22/2019TBD6/1/2020TBDTBD16-18 weeks
CLS12/9/20202/1/202010/29/2019TBD7/1/2020TBDTBD16-18 weeks
E-Sedan12/9/20201/1/20205/27/2019TBD6/1/2020TBDTBD14-16 weeksE350We/E350We4 = New model/facelift, Plug-in Hybrid E350W/E350W4 = Facelift E450W4 = Facelift, new engine (M256), ISG (Integrated Starter Generator – so the car will start electrically via electric battery, there won’t be the starter sound per ICE internal combustion engines) E53W4 = Facelift, ISG, 4Matic+ E63W = DISCONTINUED E63W4S = Facelift, S-Model, 4Matic+
E-Wagon12/9/20201/1/20205/27/2019TBD6/1/2020TBDTBD14-16 weeksE450S4 = Facelift, New engine (M256), ISG, replaces E450-4M E63S4S = Facelift, S-Model, 4Matic+
E-Coupe12/9/20203/1/20205/27/2019TBD8/1/2020TBDTBD14-16 weeksFacelift on all models New engine (M256), ISG on E450 series
E-Cab12/9/20203/1/20205/27/2019TBD8/1/2020TBDTBD14-16 weeksFacelift on all models New engine (M256), ISG on E450 series
G12/9/20204/1/2020TBDTBD9/1/2020TBDTBD14-16 weeks
GLA12/9/20201/1/20205/13/2019TBDSee Important UpdatesTBDTBD14-16 weeksGLA 2-series = production start 41/2020 GLA 3-series = production start 7/1/2020 GLA 4-series = production start 6/1/2020 New generation (H247) GLA45W4S = discontinued
GLB12/9/20201/1/202010/18/2019TBD6/1/2020TBDTBD14-16 weeksGLB35W4 = New model, 4Matic, order banks open 3/1/2020, production start 8/1/2020
GLC - SUV12/9/20204/1/20206/20/2019TBD9/1/2020TBDTBD14-16 weeksGLC350e4 = order banks open 1/1/2020, plug-in Hybrid GLC4 = 4Matic GLC6 = 4Matic+
GLC - Coupe12/9/20201/1/20206/20/2019TBD9/1/2020TBDTBD14-16 weeks
GLE - SUV12/9/20202/1/20202/6/2019TBDSee Important UpdatesTBDTBD14-16 weeksGLE350Ve4 = New model, plug-in Hybrid, start production 10/1/2020 ALL OTHER GLE 3-SERIES = START PRODUCTION 7/1/2020 GLE450V4 = New model, ISG, start production 7/1/2020 GLE580V4 = DISCONTINUED GLE53W4 = ORDER BANKS OPEN 11/1/2019, START PRODUCTION 4/1/2020 GLE63W = DISCONTINUED GLE63W4S = New model, S-model, 4Matic+, ISG, start p[roduction 2/1/2020
GLE - Coupe12/9/2020See Important Updates2/6/2019TBDSee Important UpdatesTBDTBD14-16 weeksGLE53C4 = order banks open 8/1/2020, New generation (C167), 4Matic+, ISG, start production 1/1/2020 GLE63C4S = order banks open 1/1/2020, New generation (C167), S-Model, 4Matic+, ISG, start production 6/1/2020
GLS12/9/20202/1/20209/27/2019TBDSee Important UpdatesTBDTBD14-16 weeksGLS63W4 = order banks open Sept 2019, New model, 4Matic+, ISG, start production 2/1/2020 ALL OTHER GLS MODELS = START PRODUCTION 7/1/2020
Maybach12/9/202012/1/20198/13/2019TBD5/1/2020TBDTBD14-16 weeksNew model, ISG
GT - Coupe12/9/20202/1/20207/16/2019TBD7/1/2020TBDTBD14-16 weeksGT Blk.Ser = ORDER BANKS OPEN 6/1/2020, START PRODUCTION NOVEMBER 2019 ALL MODELS = final runout, production ends December 2021
GT - Roadster12/9/20202/1/20207/16/2019TBD7/1/2020TBDTBD14-16 weeksALL MODELS = final runout, production ends December 2021
GT - 4dr Coupe12/9/20202/1/20207/16/2019TBD7/1/2020TBDTBD14-16 weeksGT43W4 = New model, 4Matic+, ISG GT73We = N/A. Introduced as MY22 in CY 21
Metris12/9/20208/1/2020Late JulyTBD11/1/202012/23/20201/1/202118-22 weeks7/15/2020 = production will be available as of Nov with a re-freshed Metris. New standard equipment and options will be available. The ordering guide should be available at the end of July. MB/DV Fleet will provide further details as they become available.
S-Sedan12/9/202011/10/33017/16/2019TBD10/1/2020TBDTBD14-16 weeksS63Ve = N/A, will be re-intorduced as MY22
Maybach12/9/20208/1/20208/13/2019TBD3/1/2020TBDTBD14-16 weeksNew generation (Z223), ISG
S-Coupe12/9/20202/1/20207/16/2019TBD6/1/2020TBDTBD14-16 weeksFinal runout, production ends June 2021
S-Cab12/9/20202/1/20207/16/2019TBD6/1/2020TBDTBD14-16 weeksFinal runout, production ends June 2021
Sprinter12/9/2020TBDTBDTBD1/1/20211/25/20212/1/202120-22 weeks
ModelLast UpdatedOrder Banks OpenETA for Data Available to OrderPricing Release DateStart of ProductionLast Date to Submit Orders to MerchantsBuild Out DateAverage Lead TimeImportant Updates

>> Back to Top

Nissan

ModelLast UpdatedOrder Banks OpenETA for Data Available to OrderPricing Release DateStart of ProductionLast Date to Submit Orders to MerchantsBuild Out DateAverage Lead TimeImportant Updates
Frontier12/9/20209/15/20209/15/2020TBD9/15/20203/26/20214/1/202116-20 weeksDeliveries begin 02/2021
Altima Sedan12/9/20204/15/20204/15/2020TBD4/15/20204/26/20215/1/202112-16 weeksDeliveries begin 10/2020
Armada12/9/20207/15/20207/15/2020TBD1/1/20211/25/20212/1/202116-20 weeksDeliveries begin 01/2021
Kicks12/9/20208/15/20206/15/2020TBD8/15/20206/24/20217/1/202116-20 weeksDeliveries begin 02/2021
Leaf12/9/20207/15/20207/15/2020TBD7/15/20201/25/20211/1/202116-20 weeksDeliveries begin 12/2020
Maxima12/9/20205/15/20205/15/2020TBD5/15/20207/26/20218/1/202116-20 weeksDeliveries begin 11/2020
Murano12/9/20207/15/20207/15/2020TBD7/15/20205/25/20216/1/202116-20 weeksDeliveries begin 12/2020
NV 1500/2500/350012/9/20205/15/20205/15/2020TBD5/15/202011/18/202011/25/202016-20 weeksDeliveries begin 11/2020
NV Cargo/Passenger12/9/20205/15/20205/15/2020TBD5/15/202011/18/202011/25/202016-20 weeksDeliveries begin 11/2020
NV20012/9/20207/15/20207/15/2020TBD7/15/20202/3/20212/10/202116-20 weeksDeliveries begin 12/2020
Pathfinder12/9/2020TBDTBDTBDTBDTBDTBDTBDTBD
Rogue12/9/20203/15/20203/15/2020TBD3/15/20205/25/20216/1/202116-20 weeksDeliveries begin 11/2020
Rogue Sport12/9/20207/15/20207/15/2020TBD7/15/20208/25/20219/1/202116-20 weeksDeliveries begin 01/2021
Sentra12/9/20206/15/20206/15/2020TBD6/15/20206/24/20217/1/202112-20 weeksDeliveries begin 12/2020
Titan12/9/20204/15/20204/15/2020TBD4/15/20208/25/20219/1/202116-20 weeksDeliveries begin 09/2020
Versa Sedan12/9/20204/15/20204/15/2020TBD4/15/20206/24/20217/1/202116-20 weeksDeliveries begin 11/2020
370Z Coupe12/9/2020TBDTBDTBDTBDTBDTBDTBD 
370Z Roadster12/9/2020TBDTBDTBDTBDTBDTBDTBD 
ModelLast UpdatedOrder Banks OpenETA for Data Available to OrderPricing Release DateStart of ProductionLast Date to Submit Orders to MerchantsBuild Out DateAverage Lead TimeImportant Updates

>> Back to Top

RAM

ModelLast UpdatedOrder Banks OpenETA for Data Available to OrderPricing Release DateStart of ProductionLast Date to Submit Orders to MerchantsBuild Out DateAverage Lead TimeImportant Updates
1500 DT (New Models)05/06/202007/08/2020TBD6/20/20198/31/2020TBDTBD10-12 weeks
1500 Quad & Crew DS05/06/202011/06/2020TBD11/5/201911/16/2020TBDTBD10-12 weeks
1500 Regular DS05/06/202011/06/2020TBD11/5/201911/23/2020TBDTBD10-12 weeks
2500 Pickup 3500 Pickup & Chassis05/06/202009/04/2020TBD9/26/201911/17/2020TBDTBD10-12 weeks
4500/5500 Chassis Cabs05/06/202009/04/2020TBD9/26/201910/12/2020TBDTBD12-14 weeks
ProMaster05/06/2020TBDTBD8/18/202012/21/202012/28/202014 - 16 weeks
ProMaster City05/06/2020TBDTBD9/1/2020TBDTBD18-20 weeksPool orders have a 6 week lead time.
ModelLast UpdatedOrder Banks OpenETA for Data Available to OrderPricing Release DateStart of ProductionLast Date to Submit Orders to MerchantsBuild Out DateAverage Lead TimeImportant Updates

>> Back to Top

Subaru

ModelLast UpdatedOrder Banks OpenETA for Data Available to OrderPricing Release DateStart of ProductionLast Date to Submit Orders to MerchantsBuild Out DateAverage Lead TimeImportant Updates
Ascent1/14/2021Early July6/30/20206/30/20206/30/20205/5/20215/12/20218 - 10 weeksOTD for base option code vehicles will be up to 120 days after the first delivery month has occurred.
BRZ1/14/2021N/AN/AN/AN/AN/ATBD8 - 10 weeksno 2021 model
Crosstrek1/14/2021Early July7/1/20207/1/20207/1/20208/4/20218/11/20218 - 10 weeksOTD for base option code vehicles will be up to 120 days after the first delivery month has occurred.
Legacy1/14/2021Mid August8/1/20208/1/20208/1/20201/6/20211/13/20218 - 10 weeksOTD for base option code vehicles will be up to 120 days after the first delivery month has occurred.
Outback1/14/2021Mid August8/1/20208/1/20208/1/20201/6/20211/13/20218 - 10 weeksOTD for base option code vehicles will be up to 120 days after the first delivery month has occurred.
Impreza1/14/2021Mid August8/1/20208/1/20208/1/20204/8/20214/15/20218 - 10 weeksOTD for base option code vehicles will be up to 120 days after the first delivery month has occurred.
Forester1/14/2021Early August7/1/20207/1/20207/1/20206/10/20216/17/20218 - 10 weeksOTD for base option code vehicles will be up to 120 days after the first delivery month has occurred.
WRX/STi1/14/2021Mid JanuaryTBD1/1/2021TBDTBDTBD8 - 10 weeks
ModelLast UpdatedOrder Banks OpenETA for Data Available to OrderPricing Release DateStart of ProductionLast Date to Submit Orders to MerchantsBuild Out DateAverage Lead TimeImportant Updates

>> Back to Top

Toyota

ModelLast UpdatedOrder Banks OpenETA for Data Available to OrderPricing Release DateStart of ProductionLast Date to Submit Orders to MerchantsBuild Out DateAverage Lead TimeImportant Updates
4Runner12/09/202006/01/20206/10/20195/31/201908/01/20205/3/20215/10/202117-19 weeksPlease note that 4Runner is built in Japan (VINS start with “J”) and unique shipping restrictions apply.
Avalon Gas/Hybrid12/09/202005/01/20205/10/20195/1/202007/01/20204/5/20214/12/20218-12 weeks
C-HR12/09/202006/01/20206/10/20195/31/201908/01/20205/3/20215/10/202117-19 weeksPlease note that C-HR is built in Japan (VINS start with “J”) and unique shipping restrictions apply.
Camry Gas/Hybrid12/09/202007/01/20206/10/20195/31/201909/01/20204/5/20214/12/20218-12 weeks
Corolla Gas/Hybrid12/09/202002/01/2020N/A12/4/201804/01/20203/3/20213/10/20218-15 weeks
Corolla Hatchback12/09/202004/01/20207/10/20196/1/202006/01/20204/5/20214/12/202112-16 weeksPlease note that Corolla Hatchback is built exclusively in Japan and unique shipping restrictions apply.
Highlander Gas/Hybrid12/09/202006/01/20209/10/2019N/A08/01/20206/3/20216/10/202110-12 weeks
Land Cruiser12/09/202006/01/20206/10/2019TBD08/01/20201/4/20211/11/202112-16 weeksPlease note that Land Cruiser is built exclusively in Japan and unique shipping restrictions apply.
Mirai (fuel cell)12/09/202001/10/19009/10/2019TBD12/01/20205/3/20215/10/202112-16 weeksAll New - CA deliveries only. Pre-approval required prior to ordering.
Prius12/09/202006/01/20206/10/2019TBD08/01/20203/3/20213/10/202116-20 weeksPlease note that Prius is built exclusively in Japan and unique shipping restrictions apply.
Prius Prime12/09/202005/01/20203/12/20193/5/201907/01/20203/3/20213/10/202116-20 weeksPlease note that Prius is built exclusively in Japan and unique shipping restrictions apply.
RAV4 Gas/Hybrid12/09/202006/01/20206/10/20195/30/201908/01/20207/5/20217/12/20218-12 weeksSome RAV4's are built in Japan.
RAV4 Prime12/09/202005/01/2020N/ATBD07/01/20207/5/20217/12/202116-20 weeksPlease note that RAV4 Prime is built exclusively in Japan and unique shipping restrictions apply.
Sequoia12/09/202006/01/20205/10/2019TBD08/01/20204/5/20214/12/202116-20 weeks
Sienna12/09/202008/01/20201/3/20191/31/201910/01/20205/3/20215/10/20218-10 weeksAll New - Hybrid only. No models come factory equipped with a spare tire.
Supra12/09/202001/01/20201/10/2019TBD03/01/2020TBDTBD8-10 weeks
Tacoma12/09/202006/01/20206/10/2019TBD08/01/20205/3/20215/10/202116-20 weeks
Tundra12/09/202005/01/20205/11/20195/9/201807/01/20207/5/20217/12/20218-16 weeks
Venza12/09/202006/01/2020N/ATBD08/01/20204/5/20214/12/20218-12 weeksAll new hybrid AWD model.
Yaris Sedan/Hatchback12/09/202010/01/20205/11/20195/3/201912/01/2020TBDTBD12-16 weeks
ModelLast UpdatedOrder Banks OpenETA for Data Available to OrderPricing Release DateStart of ProductionLast Date to Submit Orders to MerchantsBuild Out DateAverage Lead TimeImportant Updates

>> Back to Top

Volkswagen

ModelLast UpdatedOrder Banks OpenETA for Data Available to OrderPricing Release DateStart of ProductionLast Date to Submit Orders to MerchantsBuild Out DateAverage Lead TimeImportant Updates
Arteon09/19/20207/17/2020N/AN/A09/07/2020TBDTBD12-14 weeksFirst estimated delivery to dealer = 11/23/2020.
Atlas09/19/20207/22/2020N/AN/A09/28/2020TBDTBD12-14 weeks2021.5MY production date 9/28/20. First estimated delivery to dealer = 3/23/2020.
Atlas Cross Sport09/19/20206/12/2020N/AN/A09/28/2020TBDTBD12-14 weeksFirst estimated delivery to dealer = 10/5/2020.
BEV Crossover09/19/2020TBDN/AN/ATBDTBDTBD
Golf09/19/20206/12/2020N/AN/A8/18/20209/1/2020*Golf is discontinued for MY22. First estimated delivery to dealer = 11/17/2020.
GTI09/19/20206/12/2020N/AN/A8/18/20209/1/2020*Golf is discontinued for MY22. First estimated delivery to dealer = 10/19/2020.
Jetta 1.4T09/19/20206/12/2020N/AN/A09/28/2020TBDTBD12-14 weeksFirst estimated delivery to dealer = 10/19/2020.
Jetta GLI09/19/20206/12/2020N/AN/A09/28/2020TBDTBD12-14 weeksFirst estimated delivery to dealer = 10/19/2020.
Passat09/19/20206/12/2020N/AN/A09/28/2020TBDTBD12-14 weeksFirst estimated delivery to dealer = 10/5/2020
Tiguan09/19/20206/12/2020N/AN/A08/31/2020TBDTBD12-14 weeksFirst estimated delivery to dealer = 10/5/2020
ID.4 RWD09/19/2020TBDN/AN/A10/12/2020TBDTBD12-14 weeksFirst estimated delivery to dealer = 12/21/2020
ID.4 AWD09/19/2020TBDN/AN/A03/08/2021TBDTBD12-14 weeksFirst estimated delivery to dealer = 05/02/2021
ModelLast UpdatedOrder Banks OpenETA for Data Available to OrderPricing Release DateStart of ProductionLast Date to Submit Orders to MerchantsBuild Out DateAverage Lead TimeImportant Updates