Find valuable build out and order bank information on popular fleet vehicles, consolidated into one easy to navigate location. Below you can click through any of the various manufacturers’ build-out and start-up dates for US cars and US trucks. Please be aware these dates change regularly.
Quick Menu: 2023 Build-outs
Audi | BMW | Buick | Cadillac | Chevrolet | Chrysler | Dodge | Ford | GMC | Hyundai | Infiniti | Jeep | Lincoln | Mazda | Mercedes | MINI | Nissan | RAM | Rivian | Subaru | Tesla | Toyota | Volkswagen | Volvo
Model | Last Updated | Order Banks Open | ETA for Data Available to Order | Pricing Release Date | Start of Production | Last Date to Submit Orders to Merchants | Build Out Date | Average Lead Time | Important Updates |
---|---|---|---|---|---|---|---|---|---|
A4/S4 | 02/25/2021 | TBD | TBD | TBD | TBD | TBD | TBD | 8-12 weeks | |
A5/S5 | 01/08/2021 | TBD | TBD | TBD | TBD | TBD | TBD | 8-12 weeks | |
A6/S6/RS6 | 01/08/2021 | TBD | TBD | TBD | TBD | TBD | TBD | 8-12 weeks | |
A7/S7/RS7 | 01/08/2021 | TBD | TBD | TBD | TBD | TBD | TBD | 8-12 weeks | |
A8/S8 | 01/08/2021 | TBD | TBD | TBD | TBD | TBD | TBD | 8-12 weeks | |
e-tron quattro/sportback | 01/08/2021 | TBD | TBD | TBD | TBD | TBD | TBD | 8-12 weeks | |
Q3 | 01/08/2021 | TBD | TBD | TBD | TBD | TBD | TBD | 8-12 weeks | |
Q5/SQ5 | 01/08/2021 | TBD | TBD | TBD | TBD | TBD | TBD | 8-12 weeks | |
Q7/SQ7 | 01/08/2021 | TBD | TBD | TBD | TBD | TBD | TBD | 8-12 weeks | |
Q8/SQ8/RSQ8 | 01/08/2021 | TBD | TBD | TBD | TBD | TBD | TBD | 12-16 weeks | |
TT/TTS/TTRS Coupe/Roadster | 01/08/2021 | TBD | TBD | TBD | TBD | TBD | TBD | 12-16 weeks | |
Model | Last Updated | Order Banks Open | ETA for Data Available to Order | Pricing Release Date | Start of Production | Last Date to Submit Orders to Merchants | Build Out Date | Average Lead Time | Important Updates |
Model | Last Updated | Order Banks Open | ETA for Data Available to Order | Pricing Release Date | Start of Production | Last Date to Submit Orders to Merchants | Build Out Date | Average Lead Time | Important Updates |
---|---|---|---|---|---|---|---|---|---|
2 Series | 12/15/2021 | 7/1/21 | TBD | TBD | 8/1/21 | 5/5/22 | 5/15/22 | 8-12 weeks | |
3 Series | 12/15/2021 | 6/1/21 | TBD | TBD | 7/1/21 | 5/5/22 | 5/15/22 | 8-12 weeks | |
4 Series | 12/15/2021 | 6/1/21 | TBD | TBD | 7/1/21 | 5/5/22 | 5/15/22 | 8-12 weeks | |
5 Series | 12/15/2021 | 6/1/21 | TBD | TBD | 7/1/21 | 5/5/22 | 5/15/22 | 8-12 weeks | |
7 Series | 12/15/2021 | 2/1/21 | TBD | TBD | 3/1/21 | 5/5/22 | 5/15/22 | 8-12 weeks | |
8 Series | 12/15/2021 | 2/1/21 | TBD | TBD | 3/1/21 | 1/5/22 | 1/15/22 | 8-12 weeks | |
X1 | 12/15/2021 | 10/1/21 | TBD | TBD | 11/1/21 | 4/5/22 | 4/15/22 | 8-12 weeks | |
X2 | 12/15/2021 | 2/1/21 | TBD | TBD | 3/1/21 | 1/5/22 | 1/15/22 | 8-12 weeks | |
X3 | 12/15/2021 | 7/1/21 | TBD | TBD | 8/1/21 | 6/5/22 | 6/15/22 | 8-12 weeks | |
X4 | 12/15/2021 | 7/1/21 | TBD | TBD | 8/1/21 | 6/5/22 | 6/15/22 | 8-12 weeks | |
X5 | 12/15/2021 | 7/1/21 | TBD | TBD | 8/1/21 | 6/5/22 | 6/15/22 | 8-12 weeks | |
X6 | 12/15/2021 | 7/1/21 | TBD | TBD | 8/1/21 | 6/5/22 | 6/15/22 | 8-12 weeks | |
X7 | 12/15/2021 | 7/1/21 | TBD | TBD | 8/1/21 | 6/5/22 | 6/15/22 | 8-12 weeks | |
Z4 | 12/15/2021 | 7/1/21 | TBD | TBD | 8/1/21 | 6/5/22 | 6/15/22 | 8-12 weeks | |
Model | Last Updated | Order Banks Open | ETA for Data Available to Order | Pricing Release Date | Start of Production | Last Date to Submit Orders to Merchants | Build Out Date | Average Lead Time | Important Updates |
Model | Last Updated | Order Banks Open | ETA for Data Available to Order | Pricing Release Date | Start of Production | Last Date to Submit Orders to Merchants | Build Out Date | Average Lead Time | Important Updates |
---|---|---|---|---|---|---|---|---|---|
Encore | 02/25/2022 | 2/11/21 | TBD | TBD | 5/3/21 | 7/16/21 | 7/16/21 | 24-26 weeks | Early Buildout - MY22 |
Encore GX | 02/25/2022 | 2/11/21 | TBD | TBD | 4/5/21 | 7/16/21 | 7/16/21 | 24-26 weeks | Early Buildout - MY22 |
Envision | 02/25/2022 | 3/25/21 | TBD | TBD | 7/5/21 | 8/20/21 | 8/20/21 | 20 - 22 weeks | |
Enclave | 02/25/2022 | 6/3/21 | TBD | TBD | 8/2/21 | 10/22/21 | 10/22/21 | 10 - 12 weeks | |
Model | Last Updated | Order Banks Open | ETA for Data Available to Order | Pricing Release Date | Start of Production | Last Date to Submit Orders to Merchants | Build Out Date | Average Lead Time | Important Updates |
Model | Last Updated | Order Banks Open | ETA for Data Available to Order | Pricing Release Date | Start of Production | Last Date to Submit Orders to Merchants | Build Out Date | Average Lead Time | Important Updates |
---|---|---|---|---|---|---|---|---|---|
CT4 | 02/24/2022 | 5/20/21 | TBD | TBD | 8/2/21 | 10/6/21 | 10/6/21 | 10 - 12 weeks | Blackwing Retail Only |
CT5 | 02/24/2022 | 5/20/21 | TBD | TBD | 8/2/21 | 9/28/21 | 9/28/21 | 10 - 12 weeks | Blackwing Retail Only |
Escalade/Escalade ESV | 02/24/2022 | 7/29/21 | TBD | TBD | 10/4/21 | 1/15/2022 | 1/20/2022 | 18 - 20 weeks | Controlled Allocation Approved Only |
XT4 | 02/24/2022 | 4/8/21 | TBD | TBD | 6/23/21 | 10/22/21 | 10/22/21 | 12 - 14 weeks | |
XT5 | 02/24/2022 | 5/6/21 | TBD | TBD | 6/14/21 | 10/22/21 | 10/22/21 | 12 - 14 weeks | |
XT6 | 02/24/2022 | 5/6/21 | TBD | TBD | 6/14/21 | 10/22/21 | 10/22/21 | 12 - 14 weeks | |
Model | Last Updated | Order Banks Open | ETA for Data Available to Order | Pricing Release Date | Start of Production | Last Date to Submit Orders to Merchants | Build Out Date | Average Lead Time | Important Updates |
Model | Last Updated | Order Banks Open | ETA for Data Available to Order | Pricing Release Date | Start of Production | Last Date to Submit Orders to Merchants | Build Out Date | Average Lead Time | Important Updates |
---|---|---|---|---|---|---|---|---|---|
Blazer | 02/24/2022 | 5/20/21 | TBD | TBD | 7/19/21 | 2/19/2022 | 2/24/2022 | 13-15 weeks | |
Bolt | 02/24/2022 | 2/25/21 | TBD | TBD | TBD | 12/9/2021 | 12/9/2021 | 16 - 20 weeks | |
Camaro | 02/24/2022 | 4/8/21 | TBD | TBD | 6/14/21 | 2/24/2022 | 2/24/2022 | 15 -17 weeks | |
Colorado | 02/24/2022 | 7/1/21 | TBD | TBD | 8/20/21 | 1/1/21 | 1/6/22 | 12-14 weeks | Controlled Allocation Approved Only |
Equinox | 02/24/2022 | 4/8/21 | TBD | TBD | 6/14/21 | 10/6/21 | 10/6/21 | 13-15 weeks | |
Express (Cargo/Cutaway/Pass) | 02/24/2022 | 7/1/21 | TBD | TBD | 9/20/21 | 1/21/22 | 1/27/22 | 16 - 18 weeks | Controlled Allocation Approved Only |
LCF 3500/4500 Gas **MY23 Build OUt 3/3/2022 | 03/04/2022 | 3/1/21 | TBD | TBD | 4/12/21 | 4/12/21 | 4/12/2021 | 22 - 26 weeks | 22MY Cut off early. **MY23 Build Out 3/3/22 |
LCF 4500/5500 HD/XD Diesel | 02/24/2022 | 9/15/20 | TBD | TBD | 1/5/21 | 7/16/21 | 7/16/21 | 22 - 26 weeks | 22MY Cut off early. |
LCF 6500 XD Diesel | 02/24/2022 | TBD | TBD | TBD | 7/1/21 | 12/31/2021 | 12/31/2021 | 22 - 26 weeks | |
Malibu | 02/24/2022 | 4/22/21 | TBD | TBD | 7/16/21 | 10/6/21 | 10/6/21 | 13-15 weeks | |
Silverado 1500 Regular LCI | 02/24/2022 | 7/1/21 | TBD | TBD | 9/20/21 | 10/25/21 | 10/28/21 | 18 - 22 weeks | Controlled Allocation Approved Only |
Silverado 1500 Regular MCM | 02/24/2022 | 11/18/21 | TBD | TBD | TBD | 2/28/22 | 3/3/22 | 18 - 22 weeks | Controlled Allocation Approved Only |
Silverado 1500 Double LCI | 02/24/2022 | 7/1/21 | TBD | TBD | 9/27/21 | 10/25/21 | 10/28/21 | 18 - 22 weeks | Controlled Allocation Approved Only |
Silverado 1500 Double MCM | 02/24/2022 | 11/18/21 | TBD | TBD | TBD | 2/28/22 | 3/3/22 | 18 - 22 weeks | Controlled Allocation Approved Only |
Silverado 1500 Crew LCI | 02/24/2022 | 7/1/21 | TBD | TBD | 9/20/21 | 10/25/21 | 10/28/21 | 18 - 22 weeks | Controlled Allocation Approved Only |
Silverado 1500 Crew MCM | 02/24/2022 | 11/18/21 | TBD | TBD | TBD | 2/28/22 | 3/3/22 | 18 - 22 weeks | Controlled Allocation Approved Only |
Silverado 2500/3500 Regular | 02/24/2022 | 7/1/21 | TBD | TBD | 7/12/21 | 1/14/21 | 1/20/22 | 18 - 22 weeks | Controlled Allocation Approved Only |
Silverado 2500/3500 Double | 02/24/2022 | 7/1/21 | TBD | TBD | 7/12/21 | 1/14/21 | 1/20/22 | 18 - 22 weeks | Controlled Allocation Approved Only |
Silverado 2500/3500 Crew | 02/24/2022 | 7/1/21 | TBD | TBD | 7/12/21 | 1/14/21 | 1/20/22 | 18 - 22 weeks | Controlled Allocation Approved Only |
Silverado Medium Duty (HD) | 02/28/2022 | 9/9/21 | TBD | TBD | 1/3/22 | 2/28/21 | 2/28/22 | 26 - 30 weeks | |
Spark | 02/24/2022 | 4/8/21 | TBD | TBD | 6/7/21 | 10/6/21 | 10/6/21 | 28 - 30 weeks | |
Suburban | 02/24/2022 | 7/29/21 | TBD | TBD | 10/4/21 | 1/14/21 | 1/20/22 | 18 - 20 weeks | Controlled Allocation Approved Only |
Tahoe | 02/24/2022 | 7/29/21 | TBD | TBD | 10/4/21 | 1/14/21 | 1/20/22 | 18 - 20 weeks | Controlled Allocation Approved Only |
Tahoe Police | 02/24/2022 | 7/29/21 | TBD | TBD | 10/4/21 | 9/2/21 | 9/2/21 | 18 - 20 weeks | Controlled Allocation Approved Only |
Trailblazer | 02/24/2022 | 2/11/21 | TBD | TBD | 4/5/21 | 9/28/21 | 9/28/21 | 32 - 34 weeks | |
Traverse | 02/24/2022 | 6/3/21 | TBD | TBD | 8/2/21 | 10/12/21 | 10/14/21 | 12 - 14 weeks | |
Trax | 02/24/2022 | 2/11/21 | TBD | TBD | 5/3/21 | 10/6/21 | 10/6/21 | 32 - 34 weeks | AWD only for Fleet |
Model | Last Updated | Order Banks Open | ETA for Data Available to Order | Pricing Release Date | Start of Production | Last Date to Submit Orders to Merchants | Build Out Date | Average Lead Time | Important Updates |
---|---|---|---|---|---|---|---|---|---|
300 | 05/10/2022 | 10/8/21 | TBD | TBD | 12/27/21 | 5/10/22 | 5/10/22 | 20 - 24 weeks | Built at Brampton. |
Pacifica | 03/10/2022 | 8/23/21 | TBD | TBD | 11/15/21 | 11/16/21 | 11/22/21 | 20 - 24 weeks | Built at Windsor. |
Voyager | 03/10/2022 | 8/23/21 | TBD | TBD | 11/15/21 | 11/16/21 | 11/22/21 | 20 - 24 weeks | Built at Windsor. |
Model | Last Updated | Order Banks Open | ETA for Data Available to Order | Pricing Release Date | Start of Production | Last Date to Submit Orders to Merchants | Build Out Date | Average Lead Time | Important Updates |
Model | Last Updated | Order Banks Open | ETA for Data Available to Order | Pricing Release Date | Start of Production | Last Date to Submit Orders to Merchants | Build Out Date | Average Lead Time | Important Updates |
---|---|---|---|---|---|---|---|---|---|
Challenger | 05/10/2022 | 10/8/21 | TBD | TBD | 12/27/21 | 5/10/22 | 5/10/22 | 20 - 24 weeks | Built in Brampton. |
Charger | 05/10/2022 | 10/8/21 | TBD | TBD | 12/27/21 | 5/10/22 | 5/10/22 | 20 - 24 weeks | Charger Police 12/14/21 |
Durango | 03/10/2022 | 10/8/21 | TBD | TBD | 12/14/21 | 12/3/21 | 12/8/21 | 20 - 24 weeks | Built at Jefferson North. |
Model | Last Updated | Order Banks Open | ETA for Data Available to Order | Pricing Release Date | Start of Production | Last Date to Submit Orders to Merchants | Build Out Date | Average Lead Time | Important Updates |
Model | Last Updated | Order Banks Open | ETA for Data Available to Order | Pricing Release Date | Start of Production | Last Date to Submit Orders to Merchants | Build Out Date | Average Lead Time | Important Updates |
---|---|---|---|---|---|---|---|---|---|
Bronco | 07/05/2022 | 10/13/21 | TBD | TBD | 10/14/21 | 7/8/22 | 7/15/22 | 18-20 weeks | Job #1 - 12/20/21 |
Bronco Sport | 04/14/2022 | 8/30/21 | TBD | TBD | 9/23/21 | 5/13/2022 | 5/20/22 | 16-18 weeks | Job #1 - 11/29/21 |
Econoline | 03/10/2022 | 10/22/20 | TBD | TBD | 1/4/21 | 5/24/21 | 5/28/21 | 30 - 32 weeks | *2023MY Order Bank Opens 10/27/21 - Job #1 2/10/22 |
Ecosport | 03/10/2022 | 10/13/21 | TBD | TBD | 11/18/21 | 1/7/22 | 1/7/2022 | 14 - 16 weeks | Job # 1 - 1/3/22 |
Edge | 04/14/2022 | 8/30/21 | TBD | TBD | 9/16/21 | 5/13/2022 | 5/20/22 | 16-18 weeks | Job # 1 - 11/15/21 5/20/22 Build Out = Commercial/Government Only |
Escape | 05/09/2022 | 8/16/21 | TBD | TBD | 9/23/21 | 5/13/2022 | 5/20/22 | 28-30 weeks | Escape Gas - Build Out 5/20/2022 - FHEV Hybrid Only Build Out 2/7/22 |
Escape PHEV | 05/20/2022 | 8/16/21 | TBD | TBD | 9/23/21 | 5/27/22 | 5/27/22 | 30+ weeks | 5/27/22 build out = Commercial/State & Local |
Explorer (Retail/Fleet/Police) | 07/05/2022 | 7/30/21 | TBD | TBD | 9/23/21 | 7/8/22 | 7/15/22 | 18 - 20 weeks | Explorer Base K7B, K8B BUILD OUT 5/13/2022 Police Utility HEV Build Out 2/11/22 |
Expedition | 03/10/2022 | 10/15/21 | TBD | TBD | 12/9/21 | 3/4/22 | 3/4/22 | 14 - 16 weeks | Job # 1 1/18/22 |
F150 / F-150 Police | 03/10/2022 | 9/30/21 | TBD | TBD | 10/14/21 | 12/14/21 | 12/14/21 | 18 - 22 weeks | Job # 1 - 11/21/21 DTP ; 12/10/21 KC |
F150 Lightning (BEV) | 03/10/2022 | 1/5/22 | TBD | TBD | 1/27/22 | 3/28/22 | 4/1/22 | 28-30 weeks | Job #1 3/14/22 |
Maverick ICE | 05/14/2022 | 6/8/21 | TBD | TBD | 7/15/21 | 5/13/2022 | 5/20/22 | 18-20 weeks | Job # 1 - 8/18/21 |
Maverick Hybrid | 03/10/2022 | 6/8/21 | TBD | TBD | 7/15/21 | 10/20/21 | 10/22/21 | 18-20 weeks | Job # 1 - 8/18/21 |
Medium Truck (F650 & F750) | 03/10/2022 | 10/23/20 | TBD | TBD | 11/12/20 | 7/2/21 | 7/9/21 | 28 - 30 weeks | *2023MY Ordering Banks Open 10/28/21 - 23MY Retail & Stock Final Order Due Date 3/4/22 |
Motorhome | 08/08/2022 | 9/22/21 | TBD | TBD | 10/21/21 | 8/12/22 | 8/19/22 | 28-30 weeks | Job # 1 1/4/22 |
Mustang | 08/08/2022 | 10/11/21 | TBD | TBD | 12/9/21 | 9/14/22 | 9/21/22 | 16-18 weeks | Job # 1 - 1/3/222 |
Mustang Mach-E | 05/03/2022 | 9/29/21 | TBD | TBD | 10/21/21 | 4/29/22 | 4/29/22 | 18-20 weeks | Job # 1 - 1/3/22 |
Ranger | 05/09/2022 | 9/27/21 | TBD | TBD | 10/21/21 | 5/13/22 | 5/20/22 | 24 - 26 weeks | XL Trim Closed 2/25/22 |
Super Duty (F250, F350, & F450, F550, & F600) | 03/10/2022 | 3/15/21 | TBD | TBD | 5/27/21 | 8/13/2021 | 8/13/2021 | 30 - 34 weeks | KTP Job #1 - 7/10/21; OH Job # 1 - 7/28/21; VSO & LPO Job # 1 - 7/5/21: Restricted paint will be scheduled in batches and may result in a scheduling delay of 6 or more weeks. Green (PN4GW), Orange (PN4GX), Vermillion Red (PNEGC), Yellow (PN4GY), School Bus Yellow (PNAHF), Green Gem (PN4DA). Pacific Gas/Electric Blue (PN4GC) |
e-Transit (BEV) | 03/21/2022 | 6/21/21 | TBD | TBD | 9/23/21 | 3/24/2022 | 4/1/2022 | 14-16 weeks | Job # 1 - 12/20/21 |
Transit | 03/10/2022 | 9/10/21 | TBD | TBD | 11/4/21 | 10/14/21 | 10/14/21 | 18-20 weeks | Job # 1 - 1/3/22 |
Transit Connect (Wagon) | 03/10/2022 | 1/25/21 | TBD | TBD | 2/11/21 | 12/4/21 | 12/10/21 | 26-28 weeks | Job #1 4/19/21 |
Transit Connect (Van) | 03/10/2022 | 1/25/21 | TBD | TBD | 2/11/21 | 11/8/21 | 11/12/21 | 26-28 weeks | Job #1 4/19/21 |
Model | Last Updated | Order Banks Open | ETA for Data Available to Order | Pricing Release Date | Start of Production | Last Date to Submit Orders to Merchants | Build Out Date | Average Lead Time | Important Updates |
---|---|---|---|---|---|---|---|---|---|
Acadia | 03/07/2022 | 5/6/21 | TBD | TBD | 6/14/21 | 10/6/21 | 10/6/21 | 18-22 weeks | |
Canyon | 03/07/2022 | 8/18/21 | TBD | TBD | TBD | 1/7/22 | 1/7/22 | 18-22 weeks | Controlled Allocation Approved Only |
Savana (Cargo/Cutaway/Pass) | 03/07/2022 | 7/1/21 | TBD | TBD | 11/19/21 | 1/27/22 | 1/27/22 | 18-22 weeks | Controlled Allocation Approved Only |
Sierra 1500 Regular LCI | 03/07/2022 | 7/1/21 | TBD | TBD | 9/20/21 | 10/25/21 | 10/28/21 | 18-22 weeks | Controlled Allocation Approved Only |
Sierra 1500 Regular MCM | 03/07/2022 | 6/16/22 | TBD | TBD | 8/29/22 | 3/3/22 | 3/3/22 | 18-22 weeks | Controlled Allocation Approved Only |
Sierra 1500 Double LCI | 03/07/2022 | 7/1/21 | TBD | TBD | 9/20/21 | 10/25/21 | 10/28/21 | 18-22 weeks | Controlled Allocation Approved Only |
Sierra 1500 Double MCM | 03/07/2022 | 6/16/22 | TBD | TBD | 9/2/22 | 3/3/22 | 3/3/22 | 18-22 weeks | Controlled Allocation Approved Only |
Sierra 1500 Crew LCI | 03/07/2022 | 7/1/21 | TBD | TBD | 9/20/21 | 10/25/21 | 10/28/21 | 18-22 weeks | Controlled Allocation Approved Only |
Sierra 1500 Crew MCM | 03/07/2022 | 6/16/22 | TBD | TBD | 8/29/22 | 3/3/22 | 3/3/22 | 18-22 weeks | Controlled Allocation Approved Only |
Sierra 2500/3500 Regular | 03/07/2022 | 5/5/22 | TBD | TBD | 7/12/21 | 1/14/22 | 1/20/22 | 18 - 22 weeks | Controlled Allocation Approved Only |
Sierra 2500/3500 Double | 03/07/2022 | 5/5/22 | TBD | TBD | 7/12/21 | 1/14/22 | 1/20/22 | 18 - 22 weeks | Controlled Allocation Approved Only |
Sierra 2500/3500 Crew | 03/07/2022 | 7/1/21 | TBD | TBD | 7/12/21 | 1/14/22 | 1/20/22 | 18 - 22 weeks | Controlled Allocation Approved Only |
Terrain | 03/07/2022 | 4/8/21 | TBD | TBD | 6/14/21 | 10/12/21 | 10/14/21 | 12 - 14 weeks | |
Yukon | 03/07/2022 | 7/29/21 | TBD | TBD | 10/4/21 | 1/1/22 | 1/6/22 | 12 - 14 weeks | Controlled Allocation Approved Only |
Yukon XL | 03/07/2022 | 7/29/21 | TBD | TBD | 10/4/21 | 1/1/22 | 1/6/22 | 12 - 14 weeks | Controlled Allocation Approved Only |
Model | Last Updated | Order Banks Open | ETA for Data Available to Order | Pricing Release Date | Start of Production | Last Date to Submit Orders to Merchants | Build Out Date | Average Lead Time | Important Updates |
Model | Last Updated | Order Banks Open | ETA for Data Available to Order | Pricing Release Date | Start of Production | Last Date to Submit Orders to Merchants | Build Out Date | Average Lead Time | Important Updates |
---|---|---|---|---|---|---|---|---|---|
Accent (HC) | 02/25/2022 | 5/1/21 | TBD | TBD | 7/1/21 | 10/20/21 | 10/20/21 | 12-16 weeks | Carry Over Model |
Elantra N (CN7 N) | 02/25/2022 | 7/1/21 | TBD | TBD | 9/1/21 | 10/20/21 | 10/20/21 | 12-16 weeks | All-New |
Elantra (CN7) | 02/25/2022 | 4/1/21 | TBD | TBD | 6/1/21 | 10/20/21 | 10/20/21 | 12-16 weeks | Carry Over Model |
Ioniq 5 (NE EV) | 02/25/2022 | 6/1/21 | TBD | TBD | 8/1/21 | 10/20/21 | 10/20/21 | 12-16 weeks | All-New |
Ioniq AE (PHEV & HEV) | 02/25/2022 | 4/1/21 | TBD | TBD | 7/1/21 | 10/20/21 | 10/20/21 | 12-16 weeks | Carry Over Model |
Kona (OS Gas) | 02/25/2022 | 1/1/21 | TBD | TBD | 3/1/21 | 10/20/21 | 10/20/21 | 12-16 weeks | Product Enhancement |
Nexo (FE) | 02/25/2022 | 6/1/21 | TBD | TBD | 8/1/21 | 10/20/21 | 10/20/21 | 12-16 weeks | Carry Over Model |
Palisade (LX2) | 02/25/2022 | 4/1/21 | TBD | TBD | 6/1/21 | 10/20/21 | 10/20/21 | 12-16 weeks | Carry Over Model |
Santa Fe (TM Gas & HEV) | 02/25/2022 | 4/1/21 | TBD | TBD | 6/1/21 | 10/20/21 | 10/20/21 | 12-16 weeks | Carry Over Model |
Santa Fe (TM PHEV) | 02/25/2022 | 3/1/21 | TBD | TBD | 4/1/21 | 10/20/21 | 10/20/21 | 12-16 weeks | All-New |
Santa Cruz (NX4O8) | 02/25/2022 | 4/1/21 | TBD | TBD | 6/1/21 | 10/20/21 | 10/20/21 | 12-16 weeks | All-New Truck |
Sonata (DN8 & DN8 HEV) | 02/25/2022 | 4/1/21 | TBD | TBD | 6/1/21 | 10/20/21 | 10/20/21 | 12-16 weeks | Carry Over Model |
Tucson (NX4 Gas) | 02/25/2022 | 2/2/21 | TBD | TBD | 4/1/21 | 10/20/21 | 10/20/21 | 12-16 weeks | All-New |
Venue (QX) | 02/25/2022 | 5/1/21 | TBD | TBD | 7/1/21 | 10/20/21 | 10/20/21 | 12-16 weeks | Carry Over Model |
Veloster N (JSN) | 02/25/2022 | 2/1/21 | TBD | TBD | 4/1/21 | 10/20/21 | 10/20/21 | 12-16 weeks | Carry Over Model |
Model | Last Updated | Order Banks Open | ETA for Data Available to Order | Pricing Release Date | Start of Production | Last Date to Submit Orders to Merchants | Build Out Date | Average Lead Time | Important Updates |
Model | Last Updated | Order Banks Open | ETA for Data Available to Order | Pricing Release Date | Start of Production | Last Date to Submit Orders to Merchants | Build Out Date | Average Lead Time | Important Updates |
---|---|---|---|---|---|---|---|---|---|
Q50 | 09/28/2021 | 3/15/21 | TBD | TBD | 9/1/21 | 10/16/21 | 10/21/21 | 16-24 weeks | Deliveries Begin October 2021 |
Q60 | 09/28/2021 | 3/15/21 | TBD | TBD | 9/1/21 | 10/16/21 | 10/21/21 | 16-24 weeks | Deliveries Begin October 2021 |
QX50 | 09/28/2021 | 6/15/21 | TBD | TBD | 12/1/21 | 10/16/21 | 10/21/21 | 16-24 weeks | Deliveries Begin January 2022 |
QX55 | 09/28/2021 | 12/15/20 | TBD | TBD | 3/1/21 | 10/16/21 | 10/21/21 | TBD | Deliveries Begin April 2021 |
QX60 | 09/28/2021 | 3/15/21 | TBD | TBD | 10/1/21 | 10/16/21 | 10/21/21 | TBD | Deliveries Begin November 2021 |
QX80 | 09/28/2021 | 3/15/21 | TBD | TBD | 9/1/21 | 10/16/21 | 10/21/21 | 16-24 weeks | Deliveries Begin October 2021 |
Model | Last Updated | Order Banks Open | ETA for Data Available to Order | Pricing Release Date | Start of Production | Last Date to Submit Orders to Merchants | Build Out Date | Average Lead Time | Important Updates |
Model | Last Updated | Order Banks Open | ETA for Data Available to Order | Pricing Release Date | Start of Production | Last Date to Submit Orders to Merchants | Build Out Date | Average Lead Time | Important Updates |
---|---|---|---|---|---|---|---|---|---|
Grand Cherokee (WL74) | 03/10/2022 | 9/9/21 | TBD | TBD | 10/4/21 | TBD | TBD | TBD | Built at Mack. |
Grand Cherokee (WL75) | 03/10/2022 | 10/8/21 | TBD | TBD | 11/16/21 | 3/7/2022 | 3/10/22 | TBD | 22MY Build Out Jeep Grand Cherokee L (WL75) |
Grand Cherokee (WK) | 03/10/2022 | 10/8/21 | TBD | TBD | 12/14/21 | 11/16/21 | 11/22/21 | TBD | Built at Jefferson North. |
Cherokee (KL) | 03/10/2022 | 11/10/21 | TBD | TBD | 1/3/22 | 1/16/22 | 1/21/22 | 22 - 26 weeks | Altitude FWD 1/18/22 |
Compass (MP) | 03/10/2022 | 9/9/21 | TBD | TBD | 10/1/21 | 1/16/22 | 1/21/22 | 22 - 26 weeks | Compass Sport 1/18/22 |
Gladiator (JT) | 03/10/2022 | 10/8/21 | TBD | TBD | 11/22/21 | 11/16/21 | 11/22/21 | 20 - 24 weeks | Built at Toledo Supplier Park. |
Renegade (BV) | 03/10/2022 | 9/9/21 | TBD | TBD | 9/1/21 | 1/16/22 | 1/21/22 | 24 - 28 weeks | Renegade Sport 1/18/22 |
Wrangler (JL) | 03/10/2022 | 10/6/21 | TBD | TBD | 12/6/21 | 11/16/21 | 11/22/21 | 20 - 24 weeks | Built at Toledo North. |
Wagoneer & Grand Wagoneer (WS) | 03/10/2022 | 6/14/21 | TBD | TBD | 6/3/21 | 3/7/2022 | 3/10/22 | TBD | Built at Warren. |
Model | Last Updated | Order Banks Open | ETA for Data Available to Order | Pricing Release Date | Start of Production | Last Date to Submit Orders to Merchants | Build Out Date | Average Lead Time | Important Updates |
Model | Last Updated | Order Banks Open | ETA for Data Available to Order | Pricing Release Date | Start of Production | Last Date to Submit Orders to Merchants | Build Out Date | Average Lead Time | Important Updates |
---|---|---|---|---|---|---|---|---|---|
Aviator | 03/04/2022 | 3/15/21 | TBD | TBD | 6/17/21 | 2/28/22 | 3/4/22 | 18 - 20 weeks | Job # 1 - 8/30/21 |
Corsair | 08/08/2022 | 8/16/21 | TBD | TBD | 9/23/21 | 8/12/22 | 8/19/22 | 16-18 weeks | Corsair PHEV only - Build Out 7/8/22 Job # 1 - 12/02/21 |
Nautilus | 04/14/2022 | 8/29/21 | TBD | TBD | 9/16/21 | 5/13/2022 | 5/20/22 | 16-18 weeks | Job # 1 - 11/15/21 |
Navigator | 03/04/2022 | 10/15/21 | TBD | TBD | 12/9/21 | 3/4/22 | 3/4/22 | 16-18 weeks | Job # 1 - 1/18/22 |
Model | Last Updated | Order Banks Open | ETA for Data Available to Order | Pricing Release Date | Start of Production | Last Date to Submit Orders to Merchants | Build Out Date | Average Lead Time | Important Updates |
Model | Last Updated | Order Banks Open | ETA for Data Available to Order | Pricing Release Date | Start of Production | Last Date to Submit Orders to Merchants | Build Out Date | Average Lead Time | Important Updates |
---|---|---|---|---|---|---|---|---|---|
C-Sedan | 03/02/2022 | 4/1/21 | TBD | TBD | 7/1/21 | 3/3/2022 | 3/3/2022 | 16-18 weeks | C300W & C300W4 - New Generation. C43W4, C63W, C63WS Introduced as MY23 MY2022 Estimated Launch - 01/01/2022 |
C-Coupe | 03/02/2022 | 7/1/21 | TBD | TBD | 9/1/21 | TBD | TBD | 16-18 weeks | MY2022 Estimated Launch - 12/1/2021 Model C63C = discontinued in US |
C-Cab | 03/02/2022 | 7/1/21 | TBD | TBD | 9/1/21 | TBD | TBD | 16-18 weeks | MY2022 Estimated Launch - 12/1/2021 |
CLA | 04/21/2022 | 3/1/21 | TBD | TBD | 6/1/21 | 4/21/22 | 4/25/22 | 16-18 weeks | MY2022 Estimated Launch - 10/1/2021 *CLA45C4 Launch Late March 2022 |
CLS | 03/02/2022 | 3/1/21 | TBD | TBD | 7/1/21 | TBD | TBD | 16-18 weeks | CLS450C & CLS53C4 Discontinued |
E-Sedan | 04/21/2022 | 3/1/21 | TBD | TBD | 7/1/21 | 4/2122 | 4/25/22 | 14-16 weeks | MY2022 Estimated Launch 10/1/21 |
E-Wagon | 04/21/2022 | 3/1/21 | TBD | TBD | 7/1/21 | 4/2122 | 4/25/22 | 14-16 weeks | MY2022 Estimated Lauch 10/1/21 |
E-Coupe | 03/02/2022 | 4/1/21 | TBD | TBD | 6/1/21 | TBD | TBD | 14-16 weeks | MY2022 Estimated Launch 10/1/21 - E53C4 Lauch 11/1/21 |
E-Cab | 03/02/2022 | 4/1/21 | TBD | TBD | 7/1/21 | TBD | TBD | 14-16 weeks | MY2022 Estimated Launch 10/1/21 - E53A4 Launch 11/1/21 |
G | 03/03/2022 | 5/1/21 | TBD | TBD | 7/1/21 | TBD | TBD | 14-16 weeks | MY Estimated Launch G550, G63W4 7/2022, G63W44 Estimated Launch 10/2022 w/limited availability |
GLA | 03/02/2022 | 4/1/21 | TBD | TBD | 6/1/21 | 3/3/2022 | 3/3/2022 | 14-16 weeks | Launched 10/7/21 *GLA45W4 to launch late March 2022 |
GLB | 04/21/2022 | 6/1/21 | TBD | TBD | 8/1/21 | 4/21/22 | 4/25/22 | 14-16 weeks | MY2022 Launched 11/5/21 |
GLC - SUV | 03/02/2022 | 7/1/21 | TBD | TBD | 9/1/21 | 3/3/2022 | 3/3/2022 | 14-16 weeks | BUILD OUT 3/3/22 = GLC300W, GLC300W4, GLC43W4 + GLC63W4 & GLC63W4S BUILD OUT TBD |
GLC - Coupe | 04/21/2022 | 7/1/21 | TBD | TBD | 9/1/21 | 4/21/22 | 4/25/22 | 14-16 weeks | MY2022 Estimated Launch - 10/25/21 *GLC63C4 Discontinued |
GLE - SUV | 03/03/2022 | 3/1/21 | TBD | TBD | 7/1/21 | TBD | TBD | 14-16 weeks | GLE350W,GLE350W4,GLE450W4 Launched 9/21, GLE53W4 Launched 11/21, GLW400e4 introduced as MY24 |
GLE - Coupe | 03/02/2022 | 4/1/21 | TBD | TBD | 7/1/21 | TBD | TBD | 14-16 weeks | MY2022 GLE53C4 Launched 11/3/21, GLE63C4S To Launch 6/2022 |
GLS | 03/02/2022 | 4/1/21 | TBD | TBD | 7/1/21 | TBD | TBD | 14-16 weeks | MY2022 GLS450W4 Launched 9/29/21, GLS580W4, GLS63W4 to Launch Late June 2022 |
Maybach | 04/21/2022 | 4/1/21 | TBD | TBD | 7/1/21 | 4/21/22 | 4/25/22 | 14-16 weeks | MY2022 Launched 11/24/2021, S680X4 22MY Estimated Lauch 5/22 |
GT - Coupe | 02/25/2022 | TBD | TBD | TBD | TBD | TBD | TBD | 14-16 weeks | |
GT - Roadster | 02/25/2022 | TBD | TBD | TBD | TBD | TBD | TBD | 14-16 weeks | ALL MODELS = final runout, production ends December 2021 |
GT - 4dr Coupe | 03/03/2022 | 3/1/21 | TBD | TBD | 6/1/21 | TBD | TBD | 14-16 weeks | MY2022 Estimated Launch - 11/1/21 *GT63Se to be intro'd as MY23 |
Metris | 03/04/2022 | 8/16/21 | TBD | TBD | 11/15/21 | TBD | 10/28/21 | 18-22 weeks | MY22 Start of Sale - January 2022 - Final Production 7/22 |
S-Sedan | 03/02/2022 | 3/1/21 | TBD | TBD | 6/1/21 | TBD | TBD | 14-16 weeks | S580e DISCONTINUED, S580e4, S63Ve, S500V to be introduced as MY23 |
Maybach | 02/25/2022 | 10/1/21 | TBD | TBD | 1/1/22 | TBD | TBD | 14-16 weeks | New generation (Z223), ISG |
S-Coupe | 02/25/2022 | TBD | TBD | TBD | TBD | TBD | TBD | 14-16 weeks | Final runout, production ends June 2021 |
S-Cab | 02/25/2022 | TBD | TBD | TBD | TBD | TBD | TBD | 14-16 weeks | Final runout, production ends June 2021 |
Sprinter | 03/04/2022 | 8/16/21 | TBD | TBD | 1/15/22 | TBD | 10/28/21 | 20-22 weeks | MY22 Start of Sale - January 2022 - Final Production 9/22 |
Model | Last Updated | Order Banks Open | ETA for Data Available to Order | Pricing Release Date | Start of Production | Last Date to Submit Orders to Merchants | Build Out Date | Average Lead Time | Important Updates |
---|---|---|---|---|---|---|---|---|---|
Cooper S Clubman ALL4 | 06/25/2021 | 3/1/21 | TBD | TBD | TBD | TBD | 2/1/22 | 10-12 weeks | |
Cooper S Clubman ALL4 | 06/25/2021 | 3/1/21 | TBD | TBD | TBD | TBD | 2/1/22 | 10-12 weeks | |
John Cooper Works Clubman ALL4 | 06/25/2021 | 3/1/21 | TBD | TBD | TBD | TBD | 2/1/22 | 10-12 weeks | |
Cooper Hardtop 4 door | 06/25/2021 | 3/1/21 | TBD | TBD | TBD | TBD | 2/1/22 | 10-12 weeks | |
Cooper S Hardtop 4 door | 06/25/2021 | 3/1/21 | TBD | TBD | TBD | TBD | 2/1/22 | 10-12 weeks | |
Cooper Hardtop 4dr - Oxford | 06/25/2021 | 3/1/21 | TBD | TBD | TBD | TBD | 2/1/22 | 10-12 weeks | |
Cooper SE Hardtop 2 Door | 06/25/2021 | 3/1/21 | TBD | TBD | TBD | TBD | 2/1/22 | 10-12 weeks | |
Cooper Hardtop 2 Door | 06/25/2021 | 3/1/21 | TBD | TBD | TBD | TBD | 2/1/22 | 10-12 weeks | |
Cooper S Hardtop 2 Door | 06/25/2021 | 3/1/21 | TBD | TBD | TBD | TBD | 2/1/22 | 10-12 weeks | |
John Cooper Works Hardtop | 06/25/2021 | 3/1/21 | TBD | TBD | TBD | TBD | 2/1/22 | 10-12 weeks | |
Cooper Hardtop 2dr - Oxford | 06/25/2021 | 3/1/21 | TBD | TBD | TBD | TBD | 2/1/22 | 10-12 weeks | |
Cooper Convertible | 06/25/2021 | 3/1/21 | TBD | TBD | TBD | TBD | 2/1/22 | 10-12 weeks | |
Cooper S Convertible | 06/25/2021 | 3/1/21 | TBD | TBD | TBD | TBD | 2/1/22 | 10-12 weeks | |
John Cooper Works Convertible | 06/25/2021 | 3/1/21 | TBD | TBD | TBD | TBD | 2/1/22 | 10-12 weeks | |
Cooper Countryman | 06/25/2021 | 3/1/21 | TBD | TBD | TBD | TBD | 2/1/22 | 10-12 weeks | |
Cooper Countryman ALL4 | 06/25/2021 | 3/1/21 | TBD | TBD | TBD | TBD | 2/1/22 | 10-12 weeks | |
Cooper S Countryman | 06/25/2021 | 3/1/21 | TBD | TBD | TBD | TBD | 2/1/22 | 10-12 weeks | |
Cooper S Countryman ALL4 | 06/25/2021 | 3/1/21 | TBD | TBD | TBD | TBD | 2/1/22 | 10-12 weeks | |
John Cooper Works CTM ALL4 | 06/25/2021 | 3/1/21 | TBD | TBD | TBD | TBD | 2/1/22 | 10-12 weeks | |
Cooper SE Countryman ALL4 | 06/25/2021 | 3/1/21 | TBD | TBD | TBD | TBD | 2/1/22 | 10-12 weeks | |
Countryman - Oxford | 06/25/2021 | 3/1/21 | TBD | TBD | TBD | TBD | 2/1/22 | 10-12 weeks | |
Countryman ALL4 - Oxford | 06/25/2021 | 3/1/21 | TBD | TBD | TBD | TBD | 2/1/22 | 10-12 weeks | |
Model | Last Updated | Order Banks Open | ETA for Data Available to Order | Pricing Release Date | Start of Production | Last Date to Submit Orders to Merchants | Build Out Date | Average Lead Time | Important Updates |
Model | Last Updated | Order Banks Open | ETA for Data Available to Order | Pricing Release Date | Start of Production | Last Date to Submit Orders to Merchants | Build Out Date | Average Lead Time | Important Updates |
---|---|---|---|---|---|---|---|---|---|
Altima | 03/10/2022 | 5/15/21 | TBD | TBD | 10/1/21 | 10/16/21 | 10/21/21 | 12-16 weeks | Deliveries Begin November 2021 |
Armada | 03/10/2022 | 2/15/21 | TBD | TBD | 7/1/21 | 10/16/21 | 10/21/21 | 16-20 weeks | Deliveries Begin August 2021 |
Frontier | 03/10/2022 | 4/15/21 | TBD | TBD | 8/1/21 | 10/16/21 | 10/21/21 | 16-20 weeks | Deliveries Begin September 2021 |
Kicks | 03/10/2022 | 8/15/21 | TBD | TBD | 1/1/22 | 10/16/21 | 10/21/21 | 16-20 weeks | Deliveries Begin February 2022 |
Leaf | 03/10/2022 | 1/15/21 | TBD | TBD | 7/1/21 | 10/16/21 | 10/21/21 | 16-20 weeks | Deliveries Begine August 2021 |
Maxima | 03/10/2022 | 8/15/21 | TBD | TBD | 11/1/21 | 10/16/21 | 10/21/21 | 16-20 weeks | Deliveries Begin December 2021 |
Murano | 03/10/2022 | 6/15/21 | TBD | TBD | 9/1/21 | 10/16/21 | 10/21/21 | 16-20 weeks | Deliveries Begin October 2021 |
Pathfinder | 03/10/2022 | 1/15/21 | TBD | TBD | 7/1/21 | 10/16/21 | 10/21/21 | TBD | Deliveries Begin August 2021 |
Rogue | 03/10/2022 | 6/15/21 | TBD | TBD | 12/1/21 | 10/16/21 | 10/21/21 | 16-20 weeks | Deliveries Begin January 2022 |
Rogue Sport | 03/10/2022 | 8/15/21 | TBD | TBD | 1/1/22 | 10/16/21 | 10/21/21 | 16-20 weeks | Deliveries Begin February 2022 |
Sentra | 03/10/2022 | 6/15/21 | TBD | TBD | 11/1/21 | 10/16/21 | 10/21/21 | 12-20 weeks | Deliveries Begin December 2021 |
Titan (Incl XD) | 03/10/2022 | 9/15/21 | TBD | TBD | 1/1/22 | 10/16/21 | 10/21/21 | 16-20 weeks | Deliveries Begin February 2022 |
Versa | 03/10/2022 | 7/15/21 | TBD | TBD | 12/1/21 | 10/16/21 | 10/21/21 | 16-20 weeks | Deliveries Begin January 2022 |
370Z Coupe | 03/10/2022 | 8/15/21 | TBD | TBD | 1/1/22 | 10/16/21 | 10/21/21 | TBD | Deliveries Begin February 2022 |
Model | Last Updated | Order Banks Open | ETA for Data Available to Order | Pricing Release Date | Start of Production | Last Date to Submit Orders to Merchants | Build Out Date | Average Lead Time | Important Updates |
Model | Last Updated | Order Banks Open | ETA for Data Available to Order | Pricing Release Date | Start of Production | Last Date to Submit Orders to Merchants | Build Out Date | Average Lead Time | Important Updates |
---|---|---|---|---|---|---|---|---|---|
1500 DT (New Models) | 03/10/2022 | 10/6/21 | TBD | TBD | 9/13/21 | 11/3/21 | 11/8/21 | 18 - 22 weeks | Built at SHAP. |
1500 Quad & Crew (DS) | 05/10/2022 | 9/9/21 | TBD | TBD | 11/24/21 | 5/9/2022 | 5/9/2022 | 16 - 20 weeks | V8 Engine Built Out 1/31/22; V6 Build out 5/9/22 |
1500 Regular (DS) | 05/10/2022 | 7/12/21 | TBD | TBD | 11/8/21 | 5/9/2022 | 5/9/2022 | 16 - 20 weeks | V8 Engine Built Out 1/31/22; V6 Build out 5/9/22 |
2500 All Trims (DJ) | 03/10/2022 | 6/14/21 | TBD | TBD | 8/9/21 | 11/16/21 | 11/22/21 | 22 - 26 weeks | Built at Saltillo Truck. |
3500 All Trims (D2/DD/DF) | 03/10/2022 | 6/14/21 | TBD | TBD | 8/9/21 | 11/10/21 | 11/15/21 | 22 - 26 weeks | 3500 D2 build out 11/22/21 |
4500/5500 All Trims (DP) | 03/10/2022 | 6/14/21 | TBD | TBD | 8/9/21 | 11/3/21 | 11/8/21 | 22 - 26 weeks | Built at Saltillo Truck. |
ProMaster (VF) | 03/10/2022 | 8/27/21 | TBD | TBD | 11/22/21 | 10/5/21 | 10/8/21 | 24 - 28 weeks | Built at Saltillo Van. |
ProMaster City (VM) | 03/21/2022 | 11/4/21 | TBD | TBD | 1/1/22 | 3/21/22 | 3/21/22 | 24 - 28 weeks | Built at Tofus. Pool orders have a 6 week lead time. |
Model | Last Updated | Order Banks Open | ETA for Data Available to Order | Pricing Release Date | Start of Production | Last Date to Submit Orders to Merchants | Build Out Date | Average Lead Time | Important Updates |
Model | Last Updated | Order Banks Open | ETA for Data Available to Order | Pricing Release Date | Start of Production | Last Date to Submit Orders to Merchants | Build Out Date | Average Lead Time | Important Updates |
---|---|---|---|---|---|---|---|---|---|
R1S | 01/08/2021 | TBD | TBD | TBD | TBD | Closed | Reservation Full | TBD | Deliveries begin 01/01/2022 Adventure Package Explore Package |
R1T | 01/08/2021 | TBD | TBD | TBD | TBD | Closed | Reservation Full | TBD | Deliveries begin 01/01/2022 Adventure Package Explore Package |
Model | Last Updated | Order Banks Open | ETA for Data Available to Order | Pricing Release Date | Start of Production | Last Date to Submit Orders to Merchants | Build Out Date | Average Lead Time | Important Updates |
Model | Last Updated | Order Banks Open | ETA for Data Available to Order | Pricing Release Date | Start of Production | Last Date to Submit Orders to Merchants | Build Out Date | Average Lead Time | Important Updates |
---|---|---|---|---|---|---|---|---|---|
Ascent | 03/10/2022 | 8/18/21 | TBD | 8/18/21 | TBD | 11/17/21 | 11/17/21 | 8 - 10 weeks | OTD for base option code vehicles will be up to 120 days after the first delivery month has occurred. First Delivery Month: October. |
Crosstrek | 03/10/2022 | 11/17/21 | TBD | 11/17/21 | TBD | 11/17/21 | 11/17/21 | 8 - 10 weeks | OTD for base option code vehicles will be up to 120 days after the first delivery month has occurred. First Delivery Month: February. |
Legacy | 03/10/2022 | 4/14/21 | TBD | 4/14/21 | TBD | 11/17/21 | 11/17/21 | 8 - 10 weeks | OTD for base option code vehicles will be up to 120 days after the first delivery month has occurred. First Delivery Month: July. |
Outback | 03/10/2022 | 4/14/21 | TBD | 4/14/21 | TBD | 11/17/21 | 11/17/21 | 8 - 10 weeks | OTD for base option code vehicles will be up to 120 days after the first delivery month has occurred. First Delivery Month: July. |
Impreza | 03/10/2022 | 6/16/21 | TBD | 6/16/21 | TBD | 11/17/21 | 11/17/21 | 8 - 10 weeks | OTD for base option code vehicles will be up to 120 days after the first delivery month has occurred. First Delivery Month: September. |
Forester | 03/10/2022 | 9/15/21 | TBD | 9/15/21 | TBD | 11/17/21 | 11/17/21 | 8 - 10 weeks | OTD for base option code vehicles will be up to 120 days after the first delivery month has occurred. First Delivery Month: December. |
WRX/STi | 03/10/2022 | TBD | TBD | TBD | TBD | 11/17/21 | 11/17/21 | 8 - 10 weeks | |
Model | Last Updated | Order Banks Open | ETA for Data Available to Order | Pricing Release Date | Start of Production | Last Date to Submit Orders to Merchants | Build Out Date | Average Lead Time | Important Updates |
Model | Last Updated | Order Banks Open | ETA for Data Available to Order | Pricing Release Date | Start of Production | Last Date to Submit Orders to Merchants | Build Out Date | Average Lead Time | Important Updates |
---|---|---|---|---|---|---|---|---|---|
Model S | 10/11/2022 | TBD | TBD | TBD | 11/01/21 | TBD | TBD | 8 - 12 weeks | |
Model 3 | 10/11/2021 | TBD | TBD | TBD | 11/01/21 | TBD | 23MY production began 10/4/22 | 8 - 12 weeks | |
Model X | 10/11/2021 | TBD | TBD | TBD | 11/01/21 | TBD | 23MY production began 10/3/22 | 32 - 36 weeks | |
Model Y | 10/11/2021 | TBD | TBD | TBD | 11/01/21 | TBD | TBD | 8 - 12 weeks | |
Model | Last Updated | Order Banks Open | ETA for Data Available to Order | Pricing Release Date | Start of Production | Last Date to Submit Orders to Merchants | Build Out Date | Average Lead Time | Important Updates |
Model | Last Updated | Order Banks Open | ETA for Data Available to Order | Pricing Release Date | Start of Production | Last Date to Submit Orders to Merchants | Build Out Date | Average Lead Time | Important Updates |
---|---|---|---|---|---|---|---|---|---|
4Runner | 02/25/2022 | 06/01/21 | TBD | TBD | 8/1/21 | 1/26/2022 | 1/26/2022 | 17-19 weeks | Carry Over. Please note that 4Runner is built in Japan (VINS start with “J”) and unique shipping restrictions apply. Toyota cutoff for the month is the 10th of the month. |
Avalon Gas/Hybrid | 02/25/2022 | 5/1/21 | TBD | TBD | 7/1/21 | 4/4/2022 | 4/11/2022 | 8-12 weeks | Carry Over. Toyota cutoff for the month is the 10th of the month. |
C-HR | 02/25/2022 | 10/1/21 | TBD | TBD | 12/1/21 | 11/29/21 | 11/29/21 | 17-19 weeks | Carry Over. Please note that C-HR is built in Japan (VINS start with “J”) and unique shipping restrictions apply. Toyota cutoff for the month is the 10th of the month. |
Camry Gas/Hybrid | 02/25/2022 | 5/1/21 | TBD | TBD | 7/1/21 | 11/29/2021 | 11/29/2021 | 8-12 weeks | Minor Changes/Updates. Toyota cutoff for the month is the 10th of the month. |
Corolla Gas | 04/22/2022 | 4/1/21 | TBD | TBD | 6/1/21 | 5/10/22 | 5/10/2022 | 8-15 weeks | Carry Over. H1 Commerical NOT AVAILABLE FOR ORDERING Toyota cutoff for the month is the 10th of the month. |
Corolla Hybrid | 04/22/2022 | 4/1/21 | TBD | TBD | 6/1/21 | 5/10/22 | 5/10/2022 | 8-15 weeks | Carry Over. H1 Commercial NOT AVAILABLE FOR ORDERING Toyota cutoff for the month is the 10th of the month. |
Corolla Hatchback | 04/22/2022 | 5/1/21 | TBD | TBD | 7/1/21 | 5/10/2022 | 5/10/2022 | 12-16 weeks | Carry Over. H1 Commerical NOT AVAILABLE FOR ORDERING Please note that Corolla Hatchback is built exclusively in Japan and unique shipping restrictions apply. Toyota cutoff for the month is the 10th of the month. |
Corolla Cross | 04/22/2022 | 6/1/21 | TBD | TBD | 8/1/21 | 6/11/2022 | 6/11/2022 | 12-16 weeks | H1 Commercial NOT AVAILABLE FOR ORDERING |
Highlander Gas/Hybrid | 04/22/2022 | 7/1/21 | TBD | TBD | 9/1/21 | 5/10/22 | 5/10/22 | 10-12 weeks | Carry Over. July 2022 Delivery H1 Commerical NOT AVAILABLE FOR ORDERING Toyota cutoff for the month is the 10th of the month. |
Mirai (fuel cell) | 02/25/2022 | 6/1/21 | TBD | TBD | 8/1/21 | 8/5/22 | 8/8/22 | 12-16 weeks | Carry Over. All New - CA deliveries only. Pre-approval required prior to ordering. Toyota cutoff for the month is the 10th of the month. |
Prius | 02/25/2022 | 4/1/21 | TBD | TBD | 6/1/21 | 9/5/2022 | 9/12/2022 | 16-20 weeks | NOT AVAILABLE FOR COMMERCIAL OR GOVERNMENT ORDERING Carry Over. Please note that Prius is built exclusively in Japan and unique shipping restrictions apply. Toyota cutoff for the month is the 10th of the month. |
Prius Prime | 02/25/2022 | 4/1/21 | TBD | TBD | 6/1/21 | 9/5/2022 | 9/12/2022 | 16-20 weeks | NOT AVAILABLE FOR COMMERCIAL OR GOVERNMENT ORDERING Carry Over. November 2022 Delivery Please note that Prius is built exclusively in Japan and unique shipping restrictions apply. Toyota cutoff for the month is the 10th of the month. |
RAV4 Gas/Hybrid | 02/25/2022 | 9/1/21 | TBD | TBD | 11/1/21 | 4/6/22 | 4/11/22 | 8-12 weeks | Early Build Out - August 2022 Delivery. Some RAV4's are built in Japan. Toyota cutoff for the month is the 10th of the month. |
RAV4 Prime | 02/25/2022 | 10/1/21 | TBD | TBD | 12/1/21 | 7/5/22 | 7/10/22 | 16-20 weeks | Carry Over. October 2022 Delivery. Please note that RAV4 Prime is built exclusively in Japan and unique shipping restrictions apply. Toyota cutoff for the month is the 10th of the month. |
Sequoia | 02/25/2022 | 5/1/21 | TBD | TBD | 7/1/21 | 9/3/2021 | 9/10/2021 | 16-20 weeks | Carry Over. Toyota cutoff for the month is the 10th of the month. |
Sienna | 02/25/2022 | 6/1/21 | TBD | TBD | 8/1/21 | 3/5/22 | 3/10/22 | 8-10 weeks | Early Build Out. September 2022 Delivery Toyota cutoff for the month is the 10th of the month. |
Supra | 02/25/2022 | 5/1/21 | TBD | TBD | 7/1/21 | 4/5/22 | 4/11/22 | 22-24 weeks | Toyota cutoff for the month is the 10th of the month. |
Tacoma | 02/25/2022 | 6/1/21 | TBD | TBD | 8/1/21 | 11/3/21 | 11/3/21 | 16-20 weeks | Toyota cutoff for the month is the 10th of the month. |
Tundra | 02/25/2022 | 9/1/21 | TBD | TBD | 11/1/21 | 11/3/21 | 11/3/21 | Toyota cutoff for the month is the 10th of the month. | |
Venza | 02/25/2022 | 10/1/21 | TBD | TBD | 12/1/21 | 11/29/2021 | 11/29/2021 | 8-12 weeks | Carry Over. Toyota cutoff for the month is the 10th of the month. |
Model | Last Updated | Order Banks Open | ETA for Data Available to Order | Pricing Release Date | Start of Production | Last Date to Submit Orders to Merchants | Build Out Date | Average Lead Time | Important Updates |
Model | Last Updated | Order Banks Open | ETA for Data Available to Order | Pricing Release Date | Start of Production | Last Date to Submit Orders to Merchants | Build Out Date | Average Lead Time | Important Updates |
---|---|---|---|---|---|---|---|---|---|
Arteon | 03/29/2022 | 7/12/21 | TBD | TBD | 1/10/22 | 4/13/22 | 4/18/22 | 14 - 18 weeks | Delivery Into Market 2/14/22 Built in Emden, Germany |
Atlas (2.0L & V6) | 03/29/2022 | 5/31/21 | TBD | TBD | 9/6/21 | 4/13/22 | 4/18/22 | 14 - 18 weeks | Delivery Into Market 9/20/21 Built in Chattanooga, TN |
Atlas Cross Sport (2.0L & V6) | 03/29/2022 | 5/31/21 | TBD | TBD | 8/22/21 | 4/13/22 | 4/18/22 | 14 - 18 weeks | Delivery Into Market 9/20/21 Built in Chattanooga, TN |
GTI | 03/29/2022 | 8/9/21 | TBD | TBD | 10/4/21 | 4/13/22 | 4/18/22 | 14 - 18 weeks | Delivery Into Market 11/15/21 Built in Wolfsburg, Germany |
Jetta GLI | 03/29/2022 | 7/12/21 | TBD | TBD | 1/10/22 | 4/13/22 | 4/18/22 | 14 - 18 weeks | Delivery Into Market 2/14/22 Built in Puebla, Mexico |
Passat | 03/29/2022 | 5/17/21 | TBD | TBD | 8/9/21 | 4/13/22 | 4/18/22 | 14 - 18 weeks | Delivery Into Market 8/30/21 Built in Chattanooga, TN |
Tiguan | 03/29/2022 | 5/10/21 | TBD | TBD | 8/16/21 | 4/13/22 | 4/18/22 | 14 - 18 weeks | Delivery Into Market 9/13/21 Built in Puebla, Mexico |
ID.4 Pro / Pro S FWD | 03/29/2022 | TBD | TBD | TBD | 12/20/21 | 4/13/22 | 4/18/22 | 14 - 18 weeks | Delivery Into Market 2/7/22 Built in Zwickau, Germany |
ID.4 Pro / Pro S AWD | 03/29/2022 | TBD | TBD | TBD | 12/20/21 | 4/13/22 | 4/18/22 | 14 - 18 weeks | Delivery Into Market 2/7/22 Built in Zwickau, Germany |
Taos FWD | 03/29/2022 | 10/20/21 | TBD | TBD | 2/8/21 | 4/13/22 | 4/18/22 | 14 - 18 weeks | Delivery Into Market 6/7/21 Built in Puebla, Mexico |
Taos AWD | 03/29/2022 | 2/8/21 | TBD | TBD | 5/3/21 | 4/13/22 | 4/18/22 | 14 - 18 weeks | Delivery Into Market 6/28/21 Built in Puebla, Mexico |
Model | Last Updated | Order Banks Open | ETA for Data Available to Order | Pricing Release Date | Start of Production | Last Date to Submit Orders to Merchants | Build Out Date | Average Lead Time | Important Updates |
Model | Last Updated | Order Banks Open | ETA for Data Available to Order | Pricing Release Date | Start of Production | Last Date to Submit Orders to Merchants | Build Out Date | Average Lead Time | Important Updates |
---|