Manufacturers’ Build-out and Start-up Dates for 2022

Find valuable build out and order bank information on popular fleet vehicles, consolidated into one easy to navigate location. Below you can click through any of the various manufacturers’ build-out and start-up dates for US cars and US trucks. Please be aware these dates change regularly.

Quick Menu: 2023 Build-outs

Select a Manufacturer:

Audi | BMW | Buick | Cadillac | Chevrolet | Chrysler | Dodge | Ford | GMC | Hyundai | Infiniti | Jeep | Lincoln | Mazda | Mercedes | MINI | Nissan | RAM | Rivian | Subaru | Tesla | Toyota | Volkswagen | Volvo

Audi

Model Last Updated Order Banks Open ETA for Data Available to Order Pricing Release Date Start of Production Last Date to Submit Orders to Merchants Build Out Date Average Lead Time Important Updates
A4/S4 02/25/2021 TBD TBD TBD TBD TBD TBD 8-12 weeks
A5/S5 01/08/2021 TBD TBD TBD TBD TBD TBD 8-12 weeks
A6/S6/RS6 01/08/2021 TBD TBD TBD TBD TBD TBD 8-12 weeks
A7/S7/RS7 01/08/2021 TBD TBD TBD TBD TBD TBD 8-12 weeks
A8/S8 01/08/2021 TBD TBD TBD TBD TBD TBD 8-12 weeks
e-tron quattro/sportback 01/08/2021 TBD TBD TBD TBD TBD TBD 8-12 weeks
Q3 01/08/2021 TBD TBD TBD TBD TBD TBD 8-12 weeks
Q5/SQ5 01/08/2021 TBD TBD TBD TBD TBD TBD 8-12 weeks
Q7/SQ7 01/08/2021 TBD TBD TBD TBD TBD TBD 8-12 weeks
Q8/SQ8/RSQ8 01/08/2021 TBD TBD TBD TBD TBD TBD 12-16 weeks
TT/TTS/TTRS Coupe/Roadster 01/08/2021 TBD TBD TBD TBD TBD TBD 12-16 weeks
Model Last Updated Order Banks Open ETA for Data Available to Order Pricing Release Date Start of Production Last Date to Submit Orders to Merchants Build Out Date Average Lead Time Important Updates

>> Back to Top

BMW

Model Last Updated Order Banks Open ETA for Data Available to Order Pricing Release Date Start of Production Last Date to Submit Orders to Merchants Build Out Date Average Lead Time Important Updates
2 Series 12/15/2021 7/1/21 TBD TBD 8/1/21 5/5/22 5/15/22 8-12 weeks
3 Series 12/15/2021 6/1/21 TBD TBD 7/1/21 5/5/22 5/15/22 8-12 weeks
4 Series 12/15/2021 6/1/21 TBD TBD 7/1/21 5/5/22 5/15/22 8-12 weeks
5 Series 12/15/2021 6/1/21 TBD TBD 7/1/21 5/5/22 5/15/22 8-12 weeks
7 Series 12/15/2021 2/1/21 TBD TBD 3/1/21 5/5/22 5/15/22 8-12 weeks
8 Series 12/15/2021 2/1/21 TBD TBD 3/1/21 1/5/22 1/15/22 8-12 weeks
X1 12/15/2021 10/1/21 TBD TBD 11/1/21 4/5/22 4/15/22 8-12 weeks
X2 12/15/2021 2/1/21 TBD TBD 3/1/21 1/5/22 1/15/22 8-12 weeks
X3 12/15/2021 7/1/21 TBD TBD 8/1/21 6/5/22 6/15/22 8-12 weeks
X4 12/15/2021 7/1/21 TBD TBD 8/1/21 6/5/22 6/15/22 8-12 weeks
X5 12/15/2021 7/1/21 TBD TBD 8/1/21 6/5/22 6/15/22 8-12 weeks
X6 12/15/2021 7/1/21 TBD TBD 8/1/21 6/5/22 6/15/22 8-12 weeks
X7 12/15/2021 7/1/21 TBD TBD 8/1/21 6/5/22 6/15/22 8-12 weeks
Z4 12/15/2021 7/1/21 TBD TBD 8/1/21 6/5/22 6/15/22 8-12 weeks
Model Last Updated Order Banks Open ETA for Data Available to Order Pricing Release Date Start of Production Last Date to Submit Orders to Merchants Build Out Date Average Lead Time Important Updates

>> Back to Top

Buick

Model Last Updated Order Banks Open ETA for Data Available to Order Pricing Release Date Start of Production Last Date to Submit Orders to Merchants Build Out Date Average Lead Time Important Updates
Encore 02/25/2022 2/11/21 TBD TBD 5/3/21 7/16/21 7/16/21 24-26 weeks Early Buildout - MY22
Encore GX 02/25/2022 2/11/21 TBD TBD 4/5/21 7/16/21 7/16/21 24-26 weeks Early Buildout - MY22
Envision 02/25/2022 3/25/21 TBD TBD 7/5/21 8/20/21 8/20/21 20 - 22 weeks
Enclave 02/25/2022 6/3/21 TBD TBD 8/2/21 10/22/21 10/22/21 10 - 12 weeks
Model Last Updated Order Banks Open ETA for Data Available to Order Pricing Release Date Start of Production Last Date to Submit Orders to Merchants Build Out Date Average Lead Time Important Updates

>> Back to Top

Cadillac

Model Last Updated Order Banks Open ETA for Data Available to Order Pricing Release Date Start of Production Last Date to Submit Orders to Merchants Build Out Date Average Lead Time Important Updates
CT4 02/24/2022 5/20/21 TBD TBD 8/2/21 10/6/21 10/6/21 10 - 12 weeks Blackwing Retail Only
CT5 02/24/2022 5/20/21 TBD TBD 8/2/21 9/28/21 9/28/21 10 - 12 weeks Blackwing Retail Only
Escalade/Escalade ESV 02/24/2022 7/29/21 TBD TBD 10/4/21 1/15/2022 1/20/2022 18 - 20 weeks Controlled Allocation Approved Only
XT4 02/24/2022 4/8/21 TBD TBD 6/23/21 10/22/21 10/22/21 12 - 14 weeks
XT5 02/24/2022 5/6/21 TBD TBD 6/14/21 10/22/21 10/22/21 12 - 14 weeks
XT6 02/24/2022 5/6/21 TBD TBD 6/14/21 10/22/21 10/22/21 12 - 14 weeks
Model Last Updated Order Banks Open ETA for Data Available to Order Pricing Release Date Start of Production Last Date to Submit Orders to Merchants Build Out Date Average Lead Time Important Updates

>> Back to Top

Chevrolet


>> Back to Top

Chrysler

Model Last Updated Order Banks Open ETA for Data Available to Order Pricing Release Date Start of Production Last Date to Submit Orders to Merchants Build Out Date Average Lead Time Important Updates
300 05/10/2022 10/8/21 TBD TBD 12/27/21 5/10/22 5/10/22 20 - 24 weeks Built at Brampton.
Pacifica 03/10/2022 8/23/21 TBD TBD 11/15/21 11/16/21 11/22/21 20 - 24 weeks Built at Windsor.
Voyager 03/10/2022 8/23/21 TBD TBD 11/15/21 11/16/21 11/22/21 20 - 24 weeks Built at Windsor.
Model Last Updated Order Banks Open ETA for Data Available to Order Pricing Release Date Start of Production Last Date to Submit Orders to Merchants Build Out Date Average Lead Time Important Updates

>> Back to Top

Dodge

Model Last Updated Order Banks Open ETA for Data Available to Order Pricing Release Date Start of Production Last Date to Submit Orders to Merchants Build Out Date Average Lead Time Important Updates
Challenger 05/10/2022 10/8/21 TBD TBD 12/27/21 5/10/22 5/10/22 20 - 24 weeks Built in Brampton.
Charger 05/10/2022 10/8/21 TBD TBD 12/27/21 5/10/22 5/10/22 20 - 24 weeks Charger Police 12/14/21
Durango 03/10/2022 10/8/21 TBD TBD 12/14/21 12/3/21 12/8/21 20 - 24 weeks Built at Jefferson North.
Model Last Updated Order Banks Open ETA for Data Available to Order Pricing Release Date Start of Production Last Date to Submit Orders to Merchants Build Out Date Average Lead Time Important Updates

>> Back to Top

Ford


>> Back to Top

GMC

Model Last Updated Order Banks Open ETA for Data Available to Order Pricing Release Date Start of Production Last Date to Submit Orders to Merchants Build Out Date Average Lead Time Important Updates
Acadia 03/07/2022 5/6/21 TBD TBD 6/14/21 10/6/21 10/6/21 18-22 weeks
Canyon 03/07/2022 8/18/21 TBD TBD TBD 1/7/22 1/7/22 18-22 weeks Controlled Allocation Approved Only
Savana (Cargo/Cutaway/Pass) 03/07/2022 7/1/21 TBD TBD 11/19/21 1/27/22 1/27/22 18-22 weeks Controlled Allocation Approved Only
Sierra 1500 Regular LCI 03/07/2022 7/1/21 TBD TBD 9/20/21 10/25/21 10/28/21 18-22 weeks Controlled Allocation Approved Only
Sierra 1500 Regular MCM 03/07/2022 6/16/22 TBD TBD 8/29/22 3/3/22 3/3/22 18-22 weeks Controlled Allocation Approved Only
Sierra 1500 Double LCI 03/07/2022 7/1/21 TBD TBD 9/20/21 10/25/21 10/28/21 18-22 weeks Controlled Allocation Approved Only
Sierra 1500 Double MCM 03/07/2022 6/16/22 TBD TBD 9/2/22 3/3/22 3/3/22 18-22 weeks Controlled Allocation Approved Only
Sierra 1500 Crew LCI 03/07/2022 7/1/21 TBD TBD 9/20/21 10/25/21 10/28/21 18-22 weeks Controlled Allocation Approved Only
Sierra 1500 Crew MCM 03/07/2022 6/16/22 TBD TBD 8/29/22 3/3/22 3/3/22 18-22 weeks Controlled Allocation Approved Only
Sierra 2500/3500 Regular 03/07/2022 5/5/22 TBD TBD 7/12/21 1/14/22 1/20/22 18 - 22 weeks Controlled Allocation Approved Only
Sierra 2500/3500 Double 03/07/2022 5/5/22 TBD TBD 7/12/21 1/14/22 1/20/22 18 - 22 weeks Controlled Allocation Approved Only
Sierra 2500/3500 Crew 03/07/2022 7/1/21 TBD TBD 7/12/21 1/14/22 1/20/22 18 - 22 weeks Controlled Allocation Approved Only
Terrain 03/07/2022 4/8/21 TBD TBD 6/14/21 10/12/21 10/14/21 12 - 14 weeks
Yukon 03/07/2022 7/29/21 TBD TBD 10/4/21 1/1/22 1/6/22 12 - 14 weeks Controlled Allocation Approved Only
Yukon XL 03/07/2022 7/29/21 TBD TBD 10/4/21 1/1/22 1/6/22 12 - 14 weeks Controlled Allocation Approved Only
Model Last Updated Order Banks Open ETA for Data Available to Order Pricing Release Date Start of Production Last Date to Submit Orders to Merchants Build Out Date Average Lead Time Important Updates

>> Back to Top

Hyundai

Model Last Updated Order Banks Open ETA for Data Available to Order Pricing Release Date Start of Production Last Date to Submit Orders to Merchants Build Out Date Average Lead Time Important Updates
Accent (HC) 02/25/2022 5/1/21 TBD TBD 7/1/21 10/20/21 10/20/21 12-16 weeks Carry Over Model
Elantra N (CN7 N) 02/25/2022 7/1/21 TBD TBD 9/1/21 10/20/21 10/20/21 12-16 weeks All-New
Elantra (CN7) 02/25/2022 4/1/21 TBD TBD 6/1/21 10/20/21 10/20/21 12-16 weeks Carry Over Model
Ioniq 5 (NE EV) 02/25/2022 6/1/21 TBD TBD 8/1/21 10/20/21 10/20/21 12-16 weeks All-New
Ioniq AE (PHEV & HEV) 02/25/2022 4/1/21 TBD TBD 7/1/21 10/20/21 10/20/21 12-16 weeks Carry Over Model
Kona (OS Gas) 02/25/2022 1/1/21 TBD TBD 3/1/21 10/20/21 10/20/21 12-16 weeks Product Enhancement
Nexo (FE) 02/25/2022 6/1/21 TBD TBD 8/1/21 10/20/21 10/20/21 12-16 weeks Carry Over Model
Palisade (LX2) 02/25/2022 4/1/21 TBD TBD 6/1/21 10/20/21 10/20/21 12-16 weeks Carry Over Model
Santa Fe (TM Gas & HEV) 02/25/2022 4/1/21 TBD TBD 6/1/21 10/20/21 10/20/21 12-16 weeks Carry Over Model
Santa Fe (TM PHEV) 02/25/2022 3/1/21 TBD TBD 4/1/21 10/20/21 10/20/21 12-16 weeks All-New
Santa Cruz (NX4O8) 02/25/2022 4/1/21 TBD TBD 6/1/21 10/20/21 10/20/21 12-16 weeks All-New Truck
Sonata (DN8 & DN8 HEV) 02/25/2022 4/1/21 TBD TBD 6/1/21 10/20/21 10/20/21 12-16 weeks Carry Over Model
Tucson (NX4 Gas) 02/25/2022 2/2/21 TBD TBD 4/1/21 10/20/21 10/20/21 12-16 weeks All-New
Venue (QX) 02/25/2022 5/1/21 TBD TBD 7/1/21 10/20/21 10/20/21 12-16 weeks Carry Over Model
Veloster N (JSN) 02/25/2022 2/1/21 TBD TBD 4/1/21 10/20/21 10/20/21 12-16 weeks Carry Over Model
Model Last Updated Order Banks Open ETA for Data Available to Order Pricing Release Date Start of Production Last Date to Submit Orders to Merchants Build Out Date Average Lead Time Important Updates

>> Back to Top

Infiniti

Model Last Updated Order Banks Open ETA for Data Available to Order Pricing Release Date Start of Production Last Date to Submit Orders to Merchants Build Out Date Average Lead Time Important Updates
Q50 09/28/2021 3/15/21 TBD TBD 9/1/21 10/16/21 10/21/21 16-24 weeks Deliveries Begin October 2021
Q60 09/28/2021 3/15/21 TBD TBD 9/1/21 10/16/21 10/21/21 16-24 weeks Deliveries Begin October 2021
QX50 09/28/2021 6/15/21 TBD TBD 12/1/21 10/16/21 10/21/21 16-24 weeks Deliveries Begin January 2022
QX55 09/28/2021 12/15/20 TBD TBD 3/1/21 10/16/21 10/21/21 TBD Deliveries Begin April 2021
QX60 09/28/2021 3/15/21 TBD TBD 10/1/21 10/16/21 10/21/21 TBD Deliveries Begin November 2021
QX80 09/28/2021 3/15/21 TBD TBD 9/1/21 10/16/21 10/21/21 16-24 weeks Deliveries Begin October 2021
Model Last Updated Order Banks Open ETA for Data Available to Order Pricing Release Date Start of Production Last Date to Submit Orders to Merchants Build Out Date Average Lead Time Important Updates

>> Back to Top

Jeep

Model Last Updated Order Banks Open ETA for Data Available to Order Pricing Release Date Start of Production Last Date to Submit Orders to Merchants Build Out Date Average Lead Time Important Updates
Grand Cherokee (WL74) 03/10/2022 9/9/21 TBD TBD 10/4/21 TBD TBD TBD Built at Mack.
Grand Cherokee (WL75) 03/10/2022 10/8/21 TBD TBD 11/16/21 3/7/2022 3/10/22 TBD 22MY Build Out Jeep Grand Cherokee L (WL75)
Grand Cherokee (WK) 03/10/2022 10/8/21 TBD TBD 12/14/21 11/16/21 11/22/21 TBD Built at Jefferson North.
Cherokee (KL) 03/10/2022 11/10/21 TBD TBD 1/3/22 1/16/22 1/21/22 22 - 26 weeks Altitude FWD 1/18/22
Compass (MP) 03/10/2022 9/9/21 TBD TBD 10/1/21 1/16/22 1/21/22 22 - 26 weeks Compass Sport 1/18/22
Gladiator (JT) 03/10/2022 10/8/21 TBD TBD 11/22/21 11/16/21 11/22/21 20 - 24 weeks Built at Toledo Supplier Park.
Renegade (BV) 03/10/2022 9/9/21 TBD TBD 9/1/21 1/16/22 1/21/22 24 - 28 weeks Renegade Sport 1/18/22
Wrangler (JL) 03/10/2022 10/6/21 TBD TBD 12/6/21 11/16/21 11/22/21 20 - 24 weeks Built at Toledo North.
Wagoneer & Grand Wagoneer (WS) 03/10/2022 6/14/21 TBD TBD 6/3/21 3/7/2022 3/10/22 TBD Built at Warren.
Model Last Updated Order Banks Open ETA for Data Available to Order Pricing Release Date Start of Production Last Date to Submit Orders to Merchants Build Out Date Average Lead Time Important Updates

>> Back to Top

Lincoln

Model Last Updated Order Banks Open ETA for Data Available to Order Pricing Release Date Start of Production Last Date to Submit Orders to Merchants Build Out Date Average Lead Time Important Updates
Aviator 03/04/2022 3/15/21 TBD TBD 6/17/21 2/28/22 3/4/22 18 - 20 weeks Job # 1 - 8/30/21
Corsair 04/14/2022 8/16/21 TBD TBD 9/23/21 TBD TBD 16-18 weeks Job # 1 - 12/02/21
Nautilus 04/14/2022 8/29/21 TBD TBD 9/16/21 5/13/2022 5/20/22 16-18 weeks Job # 1 - 11/15/21
Navigator 03/04/2022 10/15/21 TBD TBD 12/9/21 3/4/22 3/4/22 16-18 weeks Job # 1 - 1/18/22
Model Last Updated Order Banks Open ETA for Data Available to Order Pricing Release Date Start of Production Last Date to Submit Orders to Merchants Build Out Date Average Lead Time Important Updates

>> Back to Top

Mercedes


>> Back to Top

MINI

Model Last Updated Order Banks Open ETA for Data Available to Order Pricing Release Date Start of Production Last Date to Submit Orders to Merchants Build Out Date Average Lead Time Important Updates
Cooper S Clubman ALL4 06/25/2021 3/1/21 TBD TBD TBD TBD 2/1/22 10-12 weeks
Cooper S Clubman ALL4 06/25/2021 3/1/21 TBD TBD TBD TBD 2/1/22 10-12 weeks
John Cooper Works Clubman ALL4 06/25/2021 3/1/21 TBD TBD TBD TBD 2/1/22 10-12 weeks
Cooper Hardtop 4 door 06/25/2021 3/1/21 TBD TBD TBD TBD 2/1/22 10-12 weeks
Cooper S Hardtop 4 door 06/25/2021 3/1/21 TBD TBD TBD TBD 2/1/22 10-12 weeks
Cooper Hardtop 4dr - Oxford 06/25/2021 3/1/21 TBD TBD TBD TBD 2/1/22 10-12 weeks
Cooper SE Hardtop 2 Door 06/25/2021 3/1/21 TBD TBD TBD TBD 2/1/22 10-12 weeks
Cooper Hardtop 2 Door 06/25/2021 3/1/21 TBD TBD TBD TBD 2/1/22 10-12 weeks
Cooper S Hardtop 2 Door 06/25/2021 3/1/21 TBD TBD TBD TBD 2/1/22 10-12 weeks
John Cooper Works Hardtop 06/25/2021 3/1/21 TBD TBD TBD TBD 2/1/22 10-12 weeks
Cooper Hardtop 2dr - Oxford 06/25/2021 3/1/21 TBD TBD TBD TBD 2/1/22 10-12 weeks
Cooper Convertible 06/25/2021 3/1/21 TBD TBD TBD TBD 2/1/22 10-12 weeks
Cooper S Convertible 06/25/2021 3/1/21 TBD TBD TBD TBD 2/1/22 10-12 weeks
John Cooper Works Convertible 06/25/2021 3/1/21 TBD TBD TBD TBD 2/1/22 10-12 weeks
Cooper Countryman 06/25/2021 3/1/21 TBD TBD TBD TBD 2/1/22 10-12 weeks
Cooper Countryman ALL4 06/25/2021 3/1/21 TBD TBD TBD TBD 2/1/22 10-12 weeks
Cooper S Countryman 06/25/2021 3/1/21 TBD TBD TBD TBD 2/1/22 10-12 weeks
Cooper S Countryman ALL4 06/25/2021 3/1/21 TBD TBD TBD TBD 2/1/22 10-12 weeks
John Cooper Works CTM ALL4 06/25/2021 3/1/21 TBD TBD TBD TBD 2/1/22 10-12 weeks
Cooper SE Countryman ALL4 06/25/2021 3/1/21 TBD TBD TBD TBD 2/1/22 10-12 weeks
Countryman - Oxford 06/25/2021 3/1/21 TBD TBD TBD TBD 2/1/22 10-12 weeks
Countryman ALL4 - Oxford 06/25/2021 3/1/21 TBD TBD TBD TBD 2/1/22 10-12 weeks
Model Last Updated Order Banks Open ETA for Data Available to Order Pricing Release Date Start of Production Last Date to Submit Orders to Merchants Build Out Date Average Lead Time Important Updates

>> Back to Top

Nissan

Model Last Updated Order Banks Open ETA for Data Available to Order Pricing Release Date Start of Production Last Date to Submit Orders to Merchants Build Out Date Average Lead Time Important Updates
Altima 03/10/2022 5/15/21 TBD TBD 10/1/21 10/16/21 10/21/21 12-16 weeks Deliveries Begin November 2021
Armada 03/10/2022 2/15/21 TBD TBD 7/1/21 10/16/21 10/21/21 16-20 weeks Deliveries Begin August 2021
Frontier 03/10/2022 4/15/21 TBD TBD 8/1/21 10/16/21 10/21/21 16-20 weeks Deliveries Begin September 2021
Kicks 03/10/2022 8/15/21 TBD TBD 1/1/22 10/16/21 10/21/21 16-20 weeks Deliveries Begin February 2022
Leaf 03/10/2022 1/15/21 TBD TBD 7/1/21 10/16/21 10/21/21 16-20 weeks Deliveries Begine August 2021
Maxima 03/10/2022 8/15/21 TBD TBD 11/1/21 10/16/21 10/21/21 16-20 weeks Deliveries Begin December 2021
Murano 03/10/2022 6/15/21 TBD TBD 9/1/21 10/16/21 10/21/21 16-20 weeks Deliveries Begin October 2021
Pathfinder 03/10/2022 1/15/21 TBD TBD 7/1/21 10/16/21 10/21/21 TBD Deliveries Begin August 2021
Rogue 03/10/2022 6/15/21 TBD TBD 12/1/21 10/16/21 10/21/21 16-20 weeks Deliveries Begin January 2022
Rogue Sport 03/10/2022 8/15/21 TBD TBD 1/1/22 10/16/21 10/21/21 16-20 weeks Deliveries Begin February 2022
Sentra 03/10/2022 6/15/21 TBD TBD 11/1/21 10/16/21 10/21/21 12-20 weeks Deliveries Begin December 2021
Titan (Incl XD) 03/10/2022 9/15/21 TBD TBD 1/1/22 10/16/21 10/21/21 16-20 weeks Deliveries Begin February 2022
Versa 03/10/2022 7/15/21 TBD TBD 12/1/21 10/16/21 10/21/21 16-20 weeks Deliveries Begin January 2022
370Z Coupe 03/10/2022 8/15/21 TBD TBD 1/1/22 10/16/21 10/21/21 TBD Deliveries Begin February 2022
Model Last Updated Order Banks Open ETA for Data Available to Order Pricing Release Date Start of Production Last Date to Submit Orders to Merchants Build Out Date Average Lead Time Important Updates

>> Back to Top

RAM

Model Last Updated Order Banks Open ETA for Data Available to Order Pricing Release Date Start of Production Last Date to Submit Orders to Merchants Build Out Date Average Lead Time Important Updates
1500 DT (New Models) 03/10/2022 10/6/21 TBD TBD 9/13/21 11/3/21 11/8/21 18 - 22 weeks Built at SHAP.
1500 Quad & Crew (DS) 05/10/2022 9/9/21 TBD TBD 11/24/21 5/9/2022 5/9/2022 16 - 20 weeks V8 Engine Built Out 1/31/22; V6 Build out 5/9/22
1500 Regular (DS) 05/10/2022 7/12/21 TBD TBD 11/8/21 5/9/2022 5/9/2022 16 - 20 weeks V8 Engine Built Out 1/31/22; V6 Build out 5/9/22
2500 All Trims (DJ) 03/10/2022 6/14/21 TBD TBD 8/9/21 11/16/21 11/22/21 22 - 26 weeks Built at Saltillo Truck.
3500 All Trims (D2/DD/DF) 03/10/2022 6/14/21 TBD TBD 8/9/21 11/10/21 11/15/21 22 - 26 weeks 3500 D2 build out 11/22/21
4500/5500 All Trims (DP) 03/10/2022 6/14/21 TBD TBD 8/9/21 11/3/21 11/8/21 22 - 26 weeks Built at Saltillo Truck.
ProMaster (VF) 03/10/2022 8/27/21 TBD TBD 11/22/21 10/5/21 10/8/21 24 - 28 weeks Built at Saltillo Van.
ProMaster City (VM) 03/21/2022 11/4/21 TBD TBD 1/1/22 3/21/22 3/21/22 24 - 28 weeks Built at Tofus. Pool orders have a 6 week lead time.
Model Last Updated Order Banks Open ETA for Data Available to Order Pricing Release Date Start of Production Last Date to Submit Orders to Merchants Build Out Date Average Lead Time Important Updates

>> Back to Top

Rivian

Model Last Updated Order Banks Open ETA for Data Available to Order Pricing Release Date Start of Production Last Date to Submit Orders to Merchants Build Out Date Average Lead Time Important Updates
R1S 01/08/2021 TBD TBD TBD TBD Closed Reservation Full TBD Deliveries begin 01/01/2022 Adventure Package Explore Package
R1T 01/08/2021 TBD TBD TBD TBD Closed Reservation Full TBD Deliveries begin 01/01/2022 Adventure Package Explore Package
Model Last Updated Order Banks Open ETA for Data Available to Order Pricing Release Date Start of Production Last Date to Submit Orders to Merchants Build Out Date Average Lead Time Important Updates

>> Back to Top

Subaru

Model Last Updated Order Banks Open ETA for Data Available to Order Pricing Release Date Start of Production Last Date to Submit Orders to Merchants Build Out Date Average Lead Time Important Updates
Ascent 03/10/2022 8/18/21 TBD 8/18/21 TBD 11/17/21 11/17/21 8 - 10 weeks OTD for base option code vehicles will be up to 120 days after the first delivery month has occurred. First Delivery Month: October.
Crosstrek 03/10/2022 11/17/21 TBD 11/17/21 TBD 11/17/21 11/17/21 8 - 10 weeks OTD for base option code vehicles will be up to 120 days after the first delivery month has occurred. First Delivery Month: February.
Legacy 03/10/2022 4/14/21 TBD 4/14/21 TBD 11/17/21 11/17/21 8 - 10 weeks OTD for base option code vehicles will be up to 120 days after the first delivery month has occurred. First Delivery Month: July.
Outback 03/10/2022 4/14/21 TBD 4/14/21 TBD 11/17/21 11/17/21 8 - 10 weeks OTD for base option code vehicles will be up to 120 days after the first delivery month has occurred. First Delivery Month: July.
Impreza 03/10/2022 6/16/21 TBD 6/16/21 TBD 11/17/21 11/17/21 8 - 10 weeks OTD for base option code vehicles will be up to 120 days after the first delivery month has occurred. First Delivery Month: September.
Forester 03/10/2022 9/15/21 TBD 9/15/21 TBD 11/17/21 11/17/21 8 - 10 weeks OTD for base option code vehicles will be up to 120 days after the first delivery month has occurred. First Delivery Month: December.
WRX/STi 03/10/2022 TBD TBD TBD TBD 11/17/21 11/17/21 8 - 10 weeks
Model Last Updated Order Banks Open ETA for Data Available to Order Pricing Release Date Start of Production Last Date to Submit Orders to Merchants Build Out Date Average Lead Time Important Updates

>> Back to Top

Tesla

Model Last Updated Order Banks Open ETA for Data Available to Order Pricing Release Date Start of Production Last Date to Submit Orders to Merchants Build Out Date Average Lead Time Important Updates
Model S 06/24/2021 TBD TBD TBD 11/01/21 TBD TBD 18-22 weeks Model S was updated in January 2021
Model 3 06/24/2021 TBD TBD TBD 11/01/21 TBD TBD 8 - 12 weeks
Model X 06/24/2021 TBD TBD TBD 11/01/21 TBD TBD 32 - 36 weeks Model X was updated in January 2021
Model Y 06/24/2021 TBD TBD TBD 11/01/21 TBD TBD 8 - 12 weeks
Model Last Updated Order Banks Open ETA for Data Available to Order Pricing Release Date Start of Production Last Date to Submit Orders to Merchants Build Out Date Average Lead Time Important Updates

>> Back to Top

Toyota

Model Last Updated Order Banks Open ETA for Data Available to Order Pricing Release Date Start of Production Last Date to Submit Orders to Merchants Build Out Date Average Lead Time Important Updates
4Runner 02/25/2022 06/01/21 TBD TBD 8/1/21 1/26/2022 1/26/2022 17-19 weeks Carry Over. Please note that 4Runner is built in Japan (VINS start with “J”) and unique shipping restrictions apply. Toyota cutoff for the month is the 10th of the month.
Avalon Gas/Hybrid 02/25/2022 5/1/21 TBD TBD 7/1/21 4/4/2022 4/11/2022 8-12 weeks Carry Over. Toyota cutoff for the month is the 10th of the month.
C-HR 02/25/2022 10/1/21 TBD TBD 12/1/21 11/29/21 11/29/21 17-19 weeks Carry Over. Please note that C-HR is built in Japan (VINS start with “J”) and unique shipping restrictions apply. Toyota cutoff for the month is the 10th of the month.
Camry Gas/Hybrid 02/25/2022 5/1/21 TBD TBD 7/1/21 11/29/2021 11/29/2021 8-12 weeks Minor Changes/Updates. Toyota cutoff for the month is the 10th of the month.
Corolla Gas 04/22/2022 4/1/21 TBD TBD 6/1/21 5/10/22 5/10/2022 8-15 weeks Carry Over. H1 Commerical NOT AVAILABLE FOR ORDERING Toyota cutoff for the month is the 10th of the month.
Corolla Hybrid 04/22/2022 4/1/21 TBD TBD 6/1/21 5/10/22 5/10/2022 8-15 weeks Carry Over. H1 Commercial NOT AVAILABLE FOR ORDERING Toyota cutoff for the month is the 10th of the month.
Corolla Hatchback 04/22/2022 5/1/21 TBD TBD 7/1/21 5/10/2022 5/10/2022 12-16 weeks Carry Over. H1 Commerical NOT AVAILABLE FOR ORDERING Please note that Corolla Hatchback is built exclusively in Japan and unique shipping restrictions apply. Toyota cutoff for the month is the 10th of the month.
Corolla Cross 04/22/2022 6/1/21 TBD TBD 8/1/21 6/11/2022 6/11/2022 12-16 weeks H1 Commercial NOT AVAILABLE FOR ORDERING
Highlander Gas/Hybrid 04/22/2022 7/1/21 TBD TBD 9/1/21 5/10/22 5/10/22 10-12 weeks Carry Over. July 2022 Delivery H1 Commerical NOT AVAILABLE FOR ORDERING Toyota cutoff for the month is the 10th of the month.
Mirai (fuel cell) 02/25/2022 6/1/21 TBD TBD 8/1/21 8/5/22 8/8/22 12-16 weeks Carry Over. All New - CA deliveries only. Pre-approval required prior to ordering. Toyota cutoff for the month is the 10th of the month.
Prius 02/25/2022 4/1/21 TBD TBD 6/1/21 9/5/2022 9/12/2022 16-20 weeks Carry Over. Please note that Prius is built exclusively in Japan and unique shipping restrictions apply. Toyota cutoff for the month is the 10th of the month.
Prius Prime 02/25/2022 4/1/21 TBD TBD 6/1/21 9/5/2022 9/12/2022 16-20 weeks Carry Over. November 2022 Delivery Please note that Prius is built exclusively in Japan and unique shipping restrictions apply. Toyota cutoff for the month is the 10th of the month.
RAV4 Gas/Hybrid 02/25/2022 9/1/21 TBD TBD 11/1/21 4/6/22 4/11/22 8-12 weeks Early Build Out - August 2022 Delivery. Some RAV4's are built in Japan. Toyota cutoff for the month is the 10th of the month.
RAV4 Prime 02/25/2022 10/1/21 TBD TBD 12/1/21 7/5/22 7/10/22 16-20 weeks Carry Over. October 2022 Delivery. Please note that RAV4 Prime is built exclusively in Japan and unique shipping restrictions apply. Toyota cutoff for the month is the 10th of the month.
Sequoia 02/25/2022 5/1/21 TBD TBD 7/1/21 9/3/2021 9/10/2021 16-20 weeks Carry Over. Toyota cutoff for the month is the 10th of the month.
Sienna 02/25/2022 6/1/21 TBD TBD 8/1/21 3/5/22 3/10/22 8-10 weeks Early Build Out. September 2022 Delivery Toyota cutoff for the month is the 10th of the month.
Supra 02/25/2022 5/1/21 TBD TBD 7/1/21 4/5/22 4/11/22 22-24 weeks Toyota cutoff for the month is the 10th of the month.
Tacoma 02/25/2022 6/1/21 TBD TBD 8/1/21 11/3/21 11/3/21 16-20 weeks Toyota cutoff for the month is the 10th of the month.
Tundra 02/25/2022 9/1/21 TBD TBD 11/1/21 11/3/21 11/3/21 Toyota cutoff for the month is the 10th of the month.
Venza 02/25/2022 10/1/21 TBD TBD 12/1/21 11/29/2021 11/29/2021 8-12 weeks Carry Over. Toyota cutoff for the month is the 10th of the month.
Model Last Updated Order Banks Open ETA for Data Available to Order Pricing Release Date Start of Production Last Date to Submit Orders to Merchants Build Out Date Average Lead Time Important Updates

>> Back to Top

Volkswagen

Model Last Updated Order Banks Open ETA for Data Available to Order Pricing Release Date Start of Production Last Date to Submit Orders to Merchants Build Out Date Average Lead Time Important Updates
Arteon 03/29/2022 7/12/21 TBD TBD 1/10/22 4/13/22 4/18/22 14 - 18 weeks Delivery Into Market 2/14/22 Built in Emden, Germany
Atlas (2.0L & V6) 03/29/2022 5/31/21 TBD TBD 9/6/21 4/13/22 4/18/22 14 - 18 weeks Delivery Into Market 9/20/21 Built in Chattanooga, TN
Atlas Cross Sport (2.0L & V6) 03/29/2022 5/31/21 TBD TBD 8/22/21 4/13/22 4/18/22 14 - 18 weeks Delivery Into Market 9/20/21 Built in Chattanooga, TN
GTI 03/29/2022 8/9/21 TBD TBD 10/4/21 4/13/22 4/18/22 14 - 18 weeks Delivery Into Market 11/15/21 Built in Wolfsburg, Germany
Jetta GLI 03/29/2022 7/12/21 TBD TBD 1/10/22 4/13/22 4/18/22 14 - 18 weeks Delivery Into Market 2/14/22 Built in Puebla, Mexico
Passat 03/29/2022 5/17/21 TBD TBD 8/9/21 4/13/22 4/18/22 14 - 18 weeks Delivery Into Market 8/30/21 Built in Chattanooga, TN
Tiguan 03/29/2022 5/10/21 TBD TBD 8/16/21 4/13/22 4/18/22 14 - 18 weeks Delivery Into Market 9/13/21 Built in Puebla, Mexico
ID.4 Pro / Pro S FWD 03/29/2022 TBD TBD TBD 12/20/21 4/13/22 4/18/22 14 - 18 weeks Delivery Into Market 2/7/22 Built in Zwickau, Germany
ID.4 Pro / Pro S AWD 03/29/2022 TBD TBD TBD 12/20/21 4/13/22 4/18/22 14 - 18 weeks Delivery Into Market 2/7/22 Built in Zwickau, Germany
Taos FWD 03/29/2022 10/20/21 TBD TBD 2/8/21 4/13/22 4/18/22 14 - 18 weeks Delivery Into Market 6/7/21 Built in Puebla, Mexico
Taos AWD 03/29/2022 2/8/21 TBD TBD 5/3/21 4/13/22 4/18/22 14 - 18 weeks Delivery Into Market 6/28/21 Built in Puebla, Mexico
Model Last Updated Order Banks Open ETA for Data Available to Order Pricing Release Date Start of Production Last Date to Submit Orders to Merchants Build Out Date Average Lead Time Important Updates

>> Back to Top