OEM Updates, All in One Place

Manufacturers’ Information

Manufacturers’ Build-out and Start-up Dates for 2022

Find valuable build out and order bank information on popular fleet vehicles, consolidated into one easy to navigate location. Below you can click through any of the various manufacturers’ build-out and start-up dates for US cars and US trucks. Please be aware these dates change regularly.

Quick Menu: 2020 Build-outs | 2021 Build-outs

Select a Manufacturer:

Audi | BMW | Buick | Cadillac | Chevrolet | Chrysler | Dodge | Ford | GMC | Hyundai | Infiniti | Jeep | Lincoln | Mazda | Mercedes | MINI | Nissan | RAM | Rivian | Subaru | Tesla | Toyota | Volkswagen | Volvo

Audi

ModelLast UpdatedOrder Banks OpenETA for Data Available to OrderPricing Release DateStart of ProductionLast Date to Submit Orders to MerchantsBuild Out DateAverage Lead TimeImportant Updates
A4/S401/05/2021TBDTBDTBDTBD8-12 weeks
A5/S501/05/2021TBDTBDTBDTBD8-12 weeks
A6/S6/RS601/05/2021TBDTBDTBDTBD8-12 weeks
A7/S7/RS701/05/2021TBDTBDTBDTBD8-12 weeks
A8/S801/05/2021TBDTBDTBDTBD8-12 weeks
e-tron quattro/sportback01/05/2021TBDTBDTBDTBD8-12 weeks
Q301/05/2021TBDTBDTBDTBD8-12 weeks
Q5/SQ501/05/2021TBDTBDTBDTBD8-12 weeks
Q7/SQ701/05/2021TBDTBDTBDTBD8-12 weeks
Q8/SQ8/RSQ801/05/2021TBDTBDTBDTBD12-16 weeks
TT/TTS/TTRS Coupe/Roadster01/05/2021TBDTBDTBDTBD12-16 weeks
ModelLast UpdatedOrder Banks OpenETA for Data Available to OrderPricing Release DateStart of ProductionLast Date to Submit Orders to MerchantsBuild Out DateAverage Lead TimeImportant Updates

>> Back to Top

BMW

ModelLast UpdatedOrder Banks OpenETA for Data Available to OrderPricing Release DateStart of ProductionLast Date to Submit Orders to MerchantsBuild Out DateAverage Lead TimeImportant Updates
2 Series01/08/2021TBDTBDTBDTBDTBDTBD8-12 weeks
3 Series01/08/2021TBDTBDTBDTBDTBDTBD8-12 weeks
4 Series01/08/2021TBDTBDTBDTBDTBDTBD8-12 weeks
5 Series01/08/2021TBDTBDTBDTBDTBDTBD8-12 weeks
7 Series01/08/2021TBDTBDTBDTBDTBDTBD8-12 weeks
8 Series01/08/2021TBDTBDTBDTBDTBDTBD8-12 weeks
X101/08/2021TBDTBDTBDTBDTBDTBD8-12 weeks
X201/08/2021TBDTBDTBDTBDTBDTBD8-12 weeks
X301/08/2021TBDTBDTBDTBDTBDTBD8-12 weeks
X401/08/2021TBDTBDTBDTBDTBDTBD8-12 weeks
X501/08/2021TBDTBDTBDTBDTBDTBD8-12 weeks
X601/08/2021TBDTBDTBDTBDTBDTBD8-12 weeks
X701/08/2021TBDTBDTBDTBDTBDTBD8-12 weeks
Z401/08/2021TBDTBDTBDTBDTBDTBD8-12 weeks
i301/08/2021TBDTBDTBDTBDTBDTBD8-12 weeks
i801/08/2021TBDTBDTBDTBDTBDTBD8-12 weeks
M2 Competition Coupe01/08/2021TBDTBDTBDTBDTBDTBDLimited Edition High Performance
M3 Sedan01/08/2021TBDTBDTBDTBDTBDTBDLimited Edition High Performance
M4 Coupe01/08/2021TBDTBDTBDTBDTBDTBDLimited Edition High Performance
M4 Convertible01/08/2021TBDTBDTBDTBDTBDTBDLimited Edition High Performance
M5 Sedan01/08/2021TBDTBDTBDTBDTBDTBDLimited Edition High Performance
M8 Coupe01/08/2021TBDTBDTBDTBDTBDTBDLimited Edition High Performance
M8 Convertible01/08/2021TBDTBDTBDTBDTBDTBDLimited Edition High Performance
M8 Gran Coupe01/08/2021TBDTBDTBDTBDTBDTBDLimited Edition High Performance
X3 M01/08/2021TBDTBDTBDTBDTBDTBDLimited Edition High Performance
X4 M01/08/2021TBDTBDTBDTBDTBDTBDLimited Edition High Performance
X5 M01/08/2021TBDTBDTBDTBDTBDTBDLimited Edition High Performance
X6 M01/08/2021TBDTBDTBDTBDTBDTBDLimited Edition High Performance
ModelLast UpdatedOrder Banks OpenETA for Data Available to OrderPricing Release DateStart of ProductionLast Date to Submit Orders to MerchantsBuild Out DateAverage Lead TimeImportant Updates

>> Back to Top

Buick

ModelLast UpdatedOrder Banks OpenETA for Data Available to OrderPricing Release DateStart of ProductionLast Date to Submit Orders to MerchantsBuild Out DateAverage Lead TimeImportant Updates
Encore01/05/20212/11/2021TBDTBD8/2/2021TBDTBD24-26 weeks
Encore GX01/05/20212/11/2021TBDTBD8/2/2021TBDTBD24-26 weeks
Envision01/14/20213/25/2021TBDTBD7/5/2021TBDTBD20 - 22 weeks
Enclave01/05/20216/3/2021TBDTBD8/2/2021TBDTBD10 - 12 weeks
ModelLast UpdatedOrder Banks OpenETA for Data Available to OrderPricing Release DateStart of ProductionLast Date to Submit Orders to MerchantsBuild Out DateAverage Lead TimeImportant Updates

>> Back to Top

Cadillac

ModelLast UpdatedOrder Banks OpenETA for Data Available to OrderPricing Release DateStart of ProductionLast Date to Submit Orders to MerchantsBuild Out DateAverage Lead TimeImportant Updates
CT401/14/20215/6/2021TBDTBD8/2/2021TBDTBD10 - 12 weeks
CT501/14/20215/6/2021TBDTBD8/2/2021TBDTBD10 - 12 weeks
Escalade/Escalade ESV01/14/2021TBDTBDTBDTBDTBDTBD14 - 16 weeks
XT401/14/20214/8/2021TBDTBD6/7/2021TBDTBD12 - 14 weeks
XT501/14/20215/6/2021TBDTBD7/12/2021TBDTBD12 - 14 weeks
XT601/14/20215/6/2021TBDTBD7/12/2021TBDTBD12 - 14 weeks
ModelLast UpdatedOrder Banks OpenETA for Data Available to OrderPricing Release DateStart of ProductionLast Date to Submit Orders to MerchantsBuild Out DateAverage Lead TimeImportant Updates

>> Back to Top

Chevrolet

ModelLast UpdatedOrder Banks OpenETA for Data Available to OrderPricing Release DateStart of ProductionLast Date to Submit Orders to MerchantsBuild Out DateAverage Lead TimeImportant Updates
Blazer01/14/20215/6/2021TBDTBD7/12/2021TBDTBD13-15 weeks
Bolt01/14/2021TBDTBDTBDTBDTBDTBD16 - 20 weeks
Camaro01/14/20214/8/2021TBDTBD6/14/2021TBDTBD15 -17 weeks
Colorado01/14/20213/11/2021TBDTBD5/2/2021TBDTBD12-14 weeks
Equinox01/14/20214/8/2021TBDTBD6/14/2021TBDTBD13-15 weeks
Express (Cargo/Cutaway/Pass)01/14/20216/17/2021TBDTBD8/16/2021TBDTBD16 - 18 weeks
LCF 3500/4500 Gas01/14/2021TBDTBDTBDTBDTBDTBD
LCF 4500/5500 HD/XD Diesel01/14/20219/15/2020TBDTBD1/5/2021TBDTBD
LCF 6500 XD Diesel01/14/20212/1/2021TBDTBD4/1/2021TBDTBD
Malibu01/14/20214/22/2021TBDTBD6/21/2021TBDTBD13-15 weeks
Silverado 1500 Regular01/14/20215/20/2021TBDTBD9/20/2021TBDTBD18 - 22 weeks
Silverado 1500 Double01/14/20215/20/2021TBDTBD9/20/2021TBDTBD18 - 22 weeks
Silverado 1500 Crew01/14/20215/20/2021TBDTBD9/20/2021TBDTBD18 - 22 weeks
Silverado 2500/3500 Regular01/14/20215/6/2021TBDTBD7/12/2021TBDTBD18 - 22 weeks
Silverado 2500/3500 Double01/14/20215/6/2021TBDTBD7/12/2021TBDTBD18 - 22 weeks
Silverado 2500/3500 Crew01/14/20215/6/2021TBDTBD7/12/2021TBDTBD18 - 22 weeks
Silverado Medium Duty (HD)01/14/20215/6/2021TBDTBD7/12/2021TBDTBD18 - 22 weeks
Sonic01/14/2021TBDTBDTBDTBDTBDTBD
Spark01/14/20214/8/2021TBDTBD6/7/2021TBDTBD28 - 30 weeks
Suburban01/14/2021TBDTBDTBDTBDTBDTBD13-15 weeks
Tahoe01/14/2021TBDTBDTBDTBDTBDTBD13-15 weeks
Tahoe Police01/14/2021TBDTBDTBDTBDTBDTBD
Trailblazer01/14/20212/11/2021TBDTBD4/5/2021TBDTBD
Traverse01/14/20216/3/2021TBDTBD8/2/2021TBDTBD12 - 14 weeks
Trax01/14/20212/11/2021TBDTBD4/5/2021TBDTBD28 - 30 weeks
ModelLast UpdatedOrder Banks OpenETA for Data Available to OrderPricing Release DateStart of ProductionLast Date to Submit Orders to MerchantsBuild Out DateAverage Lead TimeImportant Updates

>> Back to Top

Chrysler

ModelLast UpdatedOrder Banks OpenETA for Data Available to OrderPricing Release DateStart of ProductionLast Date to Submit Orders to MerchantsBuild Out DateAverage Lead TimeImportant Updates
30001/08/2021TBDTBDTBDTBDTBDTBD8-10 weeks
Pacifica01/08/2021TBDTBDTBDTBDTBDTBD8-10 weeksPacifica (RU-PHEV) Start of Production is 11/16/2020.
Voyager01/08/2021TBDTBDTBDTBDTBDTBD8-10 weeks
ModelLast UpdatedOrder Banks OpenETA for Data Available to OrderPricing Release DateStart of ProductionLast Date to Submit Orders to MerchantsBuild Out DateAverage Lead TimeImportant Updates

>> Back to Top

Dodge

ModelLast UpdatedOrder Banks OpenETA for Data Available to OrderPricing Release DateStart of ProductionLast Date to Submit Orders to MerchantsBuild Out DateAverage Lead TimeImportant Updates
Challenger01/08/2021TBDTBDTBDTBDTBDTBD8-10 weeks
Charger01/08/2021TBDTBDTBDTBDTBDTBD8-10 weeks
Durango01/08/2021TBDTBDTBDTBDTBDTBD8-10 weeks
Journey01/08/2021TBDTBDTBDTBDTBDTBD10-12 weeksN/A for sale in California Emission States (CA & CT)
ModelLast UpdatedOrder Banks OpenETA for Data Available to OrderPricing Release DateStart of ProductionLast Date to Submit Orders to MerchantsBuild Out DateAverage Lead TimeImportant Updates

>> Back to Top

Ford

ModelLast UpdatedOrder Banks OpenETA for Data Available to OrderPricing Release DateStart of ProductionLast Date to Submit Orders to MerchantsBuild Out DateAverage Lead TimeImportant Updates
Bronco01/05/2021TBDTBDTBDTBDTBDTBD18-20 weeks
Bronco Sport01/05/2021TBDTBDTBDTBDTBDTBD16-18 weeks
Econoline01/10/202110/22/2020TBDTBD1/4/2021TBDTBD16-18 weeksVSO Production Starts 2/08/2021
Ecosport01/05/2021TBDTBDTBDTBDTBDTBD20 - 22 weeks
Edge01/05/2021TBDTBDTBDTBDTBDTBD18-20 weeks
Escape01/05/2021TBDTBDTBDTBDTBDTBD16-18 weeks
Explorer (Retail/Fleet/Police)01/05/2021TBDTBDTBDTBDTBDTBD12-14 weeks
Expedition01/05/2021TBDTBDTBDTBDTBDTBD14 - 16 weels
F15001/05/2021TBDTBDTBDTBDTBDTBD12 - 14 weeks
Medium Truck (F650 & F750)01/05/202110/23/2021TBDTBD1/4/2021TBDTBD16-18 weeksVSO Production Starts 2/08/2021
Motorhome01/05/2021TBDTBDTBDTBDTBDTBD24-26 weeks
Mustang01/05/2021TBDTBDTBDTBDTBDTBD16-18 weeks
Mustang Mach-E01/05/2021TBDTBDTBDTBDTBDTBD14 - 16 weels
Ranger01/05/2021TBDTBDTBDTBDTBDTBD16-18 weeks
Super Duty (F250, F350, & F450, F550, & F600)01/10/20213/15/2021TBDTBD6/1/2021TBDTBD16-18 weeksVSO Production Starts 6/28/2021
Transit01/05/2021TBDTBDTBDTBDTBDTBD16-18 weeks
Transit Connect01/10/20211/25/2021TBDTBD4/19/2021TBDTBD20-22 weeksScheduling starts 02/11/021
ModelLast UpdatedOrder Banks OpenETA for Data Available to OrderPricing Release DateStart of ProductionLast Date to Submit Orders to MerchantsBuild Out DateAverage Lead TimeImportant Updates

>> Back to Top

GMC

ModelLast UpdatedOrder Banks OpenETA for Data Available to OrderPricing Release DateStart of ProductionLast Date to Submit Orders to MerchantsBuild Out DateAverage Lead TimeImportant Updates
Acadia01/14/20215/6/2021TBDTBD7/12/2021TBDTBD12 - 14 weeks
Canyon01/08/20213/11/2021TBDTBD5/3/2021TBDTBD12 - 14 weeks
Savana (Cargo/Cutaway/Pass)01/08/20216/17/2021TBDTBD8/16/2021TBDTBD18 - 22 weeks
Sierra 1500 Regular01/08/20215/20/2021TBDTBD9/20/2021TBDTBD18 - 22 weeks
Sierra 1500 Double01/08/20215/20/2021TBDTBD9/20/2021TBDTBD18 - 22 weeks
Sierra 1500 Crew01/08/20215/20/2021TBDTBD9/20/2021TBDTBD18 - 22 weeks
Sierra 2500/3500 Regular01/08/20215/6/2021TBDTBD7/12/2021TBDTBD18 - 22 weeks
Sierra 2500/3500 Double01/08/20215/6/2021TBDTBD7/12/2021TBDTBD18 - 22 weeks
Sierra 2500/3500 Crew01/08/20215/6/2021TBDTBD7/12/2021TBDTBD18 - 22 weeks
Terrain01/14/20214/8/2021TBDTBD6/14/2021TBDTBD12 - 14 weeks
Yukon01/08/2021TBDTBDTBDTBDTBDTBD12 - 14 weeks
Yukon XL01/08/2021TBDTBDTBDTBDTBDTBD12 - 14 weeks
ModelLast UpdatedOrder Banks OpenETA for Data Available to OrderPricing Release DateStart of ProductionLast Date to Submit Orders to MerchantsBuild Out DateAverage Lead TimeImportant Updates

>> Back to Top

Hyundai

ModelLast UpdatedOrder Banks OpenETA for Data Available to OrderPricing Release DateStart of ProductionLast Date to Submit Orders to MerchantsBuild Out DateAverage Lead TimeImportant Updates
Accent01/08/20215/1/2021TBDTBD7/1/2021TBDTBD12-16 weeksCarry Over Model
Elantra01/08/20214/1/2021TBDTBD6/1/2021TBDTBD12-16 weeksCarry Over Model
Ioniq (EV)01/08/20214/1/2021TBDTBD6/1/2021TBDTBD12-16 weeksCarry Over Model
Ioniq (HEV)01/08/20214/1/2021TBDTBD6/1/2021TBDTBD12-16 weeksCarry Over Model
Ioniq (HEV)01/08/20214/1/2021TBDTBD6/1/2021TBDTBD12-16 weeksCarry Over Model
Kona (Gas)01/08/202112/1/2021TBDTBD3/1/2021TBDTBD12-16 weeksProduct Enhancement
Nexo01/08/20216/1/2021TBDTBD8/1/2021TBDTBD12-16 weeksCarry Over Model
Palisade01/08/20214/1/2021TBDTBD6/1/2021TBDTBD12-16 weeksCarry Over Model
Santa Fe (Gas)01/08/20214/1/2021TBDTBD6/1/2021TBDTBD12-16 weeksCarry Over Model
Santa Fe (HEV)01/08/20214/1/2021TBDTBD6/1/2021TBDTBD12-16 weeksCarry Over Model
Sonata (Gas)01/08/20214/1/2021TBDTBD6/1/2021TBDTBD12-16 weeksCarry Over Model
Sonata (HEV)01/08/20214/1/2021TBDTBD6/1/2021TBDTBD12-16 weeksCarry Over Model
Tucson (Gas)01/08/202112/1/2020TBDTBD2/1/2021TBDTBD12-16 weeksAll-New
Venue01/08/20215/1/2021TBDTBD8/1/2021TBDTBD12-16 weeksCarry Over Model
ModelLast UpdatedOrder Banks OpenETA for Data Available to OrderPricing Release DateStart of ProductionLast Date to Submit Orders to MerchantsBuild Out DateAverage Lead TimeImportant Updates

>> Back to Top

Infiniti

ModelLast UpdatedOrder Banks OpenETA for Data Available to OrderPricing Release DateStart of ProductionLast Date to Submit Orders to MerchantsBuild Out DateAverage Lead TimeImportant Updates
Q5001/08/20213/15/2021TBDTBD8/1/2021TBDTBD16-24 weeks
Q6001/08/20213/15/2021TBDTBD8/1/2021TBDTBD16-24 weeks
QX5001/08/20216/15/2021TBDTBD10/1/2021TBDTBD16-24 weeks
QX5501/08/202112/15/2020TBDTBD3/1/2021TBDTBDTBD
QX6001/08/20213/15/2021TBDTBD8/1/2021TBDTBDTBD
QX8001/08/20213/15/2021TBDTBD8/1/2021TBDTBD16-24 weeks
ModelLast UpdatedOrder Banks OpenETA for Data Available to OrderPricing Release DateStart of ProductionLast Date to Submit Orders to MerchantsBuild Out DateAverage Lead TimeImportant Updates

>> Back to Top

Jeep

ModelLast UpdatedOrder Banks OpenETA for Data Available to OrderPricing Release DateStart of ProductionLast Date to Submit Orders to MerchantsBuild Out DateAverage Lead TimeImportant Updates
Cherokee01/08/2021TBDTBDTBDTBDTBDTBD8-10 weeks
Grand Cherokee01/08/2021TBDTBDTBDTBDTBDTBD8-10 weeks
Compass01/08/2021TBDTBDTBDTBDTBDTBD10-12 weeks
Gladiator01/08/2021TBDTBDTBDTBDTBDTBD10-12 weeks
Renegade01/08/2021TBDTBDTBDTBDTBDTBD8-10 weeks
Wrangler01/08/2021TBDTBDTBDTBDTBDTBD8-10 weeks
ModelLast UpdatedOrder Banks OpenETA for Data Available to OrderPricing Release DateStart of ProductionLast Date to Submit Orders to MerchantsBuild Out DateAverage Lead TimeImportant Updates

>> Back to Top

Lincoln

ModelLast UpdatedOrder Banks OpenETA for Data Available to OrderPricing Release DateStart of ProductionLast Date to Submit Orders to MerchantsBuild Out DateAverage Lead TimeImportant Updates
Aviator01/08/2021TBDTBDTBDTBDTBDTBD14 - 16 weeks
Corsair01/08/2021TBDTBDTBDTBDTBDTBD16-18 weeksPHEV (plug -in) - 4/05/2021.
Nautilus01/08/2021TBDTBDTBDTBDTBDTBD16-18 weeksJob 1 - 1/25/2021.
Navigator01/08/2021TBDTBDTBDTBDTBDTBD12-14 weeks
ModelLast UpdatedOrder Banks OpenETA for Data Available to OrderPricing Release DateStart of ProductionLast Date to Submit Orders to MerchantsBuild Out DateAverage Lead TimeImportant Updates

>> Back to Top

Mercedes

ModelLast UpdatedOrder Banks OpenETA for Data Available to OrderPricing Release DateStart of ProductionLast Date to Submit Orders to MerchantsBuild Out DateAverage Lead TimeImportant Updates
C-Sedan01/08/2021TBDTBDTBDTBDTBDTBD16-18 weeks
C-Coupe01/08/2021TBDTBDTBDTBDTBDTBD16-18 weeks
C-Cab01/08/2021TBDTBDTBDTBDTBDTBD16-18 weeks
CLA01/08/2021TBDTBDTBDTBDTBDTBD16-18 weeks
CLS01/08/2021TBDTBDTBDTBDTBDTBD16-18 weeks
E-Sedan01/08/2021TBDTBDTBDTBDTBDTBD14-16 weeks
E-Wagon01/08/2021TBDTBDTBDTBDTBDTBD14-16 weeksE450S4 = Facelift, New engine (M256), ISG, replaces E450-4M E63S4S = Facelift, S-Model, 4Matic+
E-Coupe01/08/2021TBDTBDTBDTBDTBDTBD14-16 weeksFacelift on all models New engine (M256), ISG on E450 series
E-Cab01/08/2021TBDTBDTBDTBDTBDTBD14-16 weeksFacelift on all models New engine (M256), ISG on E450 series
G01/08/2021TBDTBDTBDTBDTBDTBD14-16 weeks
GLA01/08/2021TBDTBDTBDTBDTBDTBD14-16 weeks
GLB01/08/2021TBDTBDTBDTBDTBDTBD14-16 weeks
GLC - SUV01/08/2021TBDTBDTBDTBDTBDTBD14-16 weeks
GLC - Coupe01/08/2021TBDTBDTBDTBDTBDTBD14-16 weeks
GLE - SUV01/08/2021TBDTBDTBDTBDTBDTBD14-16 weeksGLE350Ve4 = New model, plug-in Hybrid, start production 10/1/2020 ALL OTHER GLE 3-SERIES = START PRODUCTION 7/1/2020 GLE450V4 = New model, ISG, start production 7/1/2020 GLE580V4 = DISCONTINUED GLE53W4 = ORDER BANKS OPEN 11/1/2019, START PRODUCTION 4/1/2020 GLE63W = DISCONTINUED GLE63W4S = New model, S-model, 4Matic+, ISG, start p[roduction 2/1/2020
GLE - Coupe01/08/2021TBDTBDTBDTBDTBDTBD14-16 weeksGLE53C4 = order banks open 8/1/2020, New generation (C167), 4Matic+, ISG, start production 1/1/2020 GLE63C4S = order banks open 1/1/2020, New generation (C167), S-Model, 4Matic+, ISG, start production 6/1/2020
GLS01/08/2021TBDTBDTBDTBDTBDTBD14-16 weeks
Maybach01/08/2021TBDTBDTBDTBDTBDTBD14-16 weeks
GT - Coupe01/08/2021TBDTBDTBDTBDTBDTBD14-16 weeks
GT - Roadster01/08/2021TBDTBDTBDTBDTBDTBD14-16 weeksALL MODELS = final runout, production ends December 2021
GT - 4dr Coupe01/08/2021TBDTBDTBDTBDTBDTBD14-16 weeksGT43W4 = New model, 4Matic+, ISG GT73We = N/A. Introduced as MY22 in CY 21
Metris01/08/2021TBDTBDTBDTBDTBDTBD18-22 weeks
S-Sedan01/08/2021TBDTBDTBDTBDTBDTBD14-16 weeksS63Ve = N/A, will be re-intorduced as MY22
Maybach01/08/2021TBDTBDTBDTBDTBDTBD14-16 weeksNew generation (Z223), ISG
S-Coupe01/08/2021TBDTBDTBDTBDTBDTBD14-16 weeksFinal runout, production ends June 2021
S-Cab01/08/2021TBDTBDTBDTBDTBDTBD14-16 weeksFinal runout, production ends June 2021
Sprinter01/08/2021TBDTBDTBDTBDTBDTBD20-22 weeks
ModelLast UpdatedOrder Banks OpenETA for Data Available to OrderPricing Release DateStart of ProductionLast Date to Submit Orders to MerchantsBuild Out DateAverage Lead TimeImportant Updates

>> Back to Top

MINI

ModelLast UpdatedOrder Banks OpenETA for Data Available to OrderPricing Release DateStart of ProductionLast Date to Submit Orders to MerchantsBuild Out DateAverage Lead TimeImportant Updates
Hardtop 2 Door01/08/2021TBDTBDTBDTBDTBDTBD10-12 weeks
Hardtop 4 Door01/08/2021TBDTBDTBDTBDTBDTBD10-12 weeks
Countryman01/08/2021TBDTBDTBDTBDTBDTBD10-12 weeks
Clubman01/08/2021TBDTBDTBDTBDTBDTBD10-12 weeks
Convertible01/08/2021TBDTBDTBDTBDTBDTBD10-12 weeks
John Cooper Works Hardtop 2 Door01/08/2021TBDTBDTBDTBDTBDTBD10-12 weeks
John Cooper Works Convertible01/08/2021TBDTBDTBDTBDTBDTBD10-12 weeks
John Cooper Works Clubman All401/08/2021TBDTBDTBDTBDTBDTBD10-12 weeks
John Cooper Works Countryman All401/08/2021TBDTBDTBDTBDTBDTBD10-12 weeks
Electric01/08/2021TBDTBDTBDTBDTBDTBD10-12 weeks
ModelLast UpdatedOrder Banks OpenETA for Data Available to OrderPricing Release DateStart of ProductionLast Date to Submit Orders to MerchantsBuild Out DateAverage Lead TimeImportant Updates

>> Back to Top

Nissan

ModelLast UpdatedOrder Banks OpenETA for Data Available to OrderPricing Release DateStart of ProductionLast Date to Submit Orders to MerchantsBuild Out DateAverage Lead TimeImportant Updates
Altima01/08/20215/15/2021TBDTBD7/1/2021TBDTBD12-16 weeks
Armada01/08/20212/15/2021TBDTBD7/1/2021TBDTBD16-20 weeks
Frontier01/08/20214/15/2021TBDTBD8/1/2021TBDTBD16-20 weeks
Kicks01/08/20217/15/2021TBDTBD11/1/2021TBDTBD16-20 weeks
Leaf01/08/20211/15/2021TBDTBD5/1/2021TBDTBD16-20 weeks
Maxima01/08/20218/15/2021TBDTBD11/1/2021TBDTBD16-20 weeks
Murano01/08/20216/15/2021TBDTBD9/1/2021TBDTBD16-20 weeks
Pathfinder01/08/20211/15/2021TBDTBD4/1/2021TBDTBDTBD
Rogue01/08/20216/15/2021TBDTBD9/1/2021TBDTBD16-20 weeks
Rogue Sport01/08/20219/15/2021TBDTBD1/1/2022TBDTBD16-20 weeks
Sentra01/08/20217/15/2021TBDTBD11/1/2021TBDTBD12-20 weeks
Titan01/08/20219/15/2021TBDTBD1/1/2022TBDTBD16-20 weeks
Versa01/08/20217/15/2021TBDTBD12/1/2021TBDTBD16-20 weeks
370Z Coupe01/08/20218/15/2021TBDTBD1/1/2022TBDTBDTBD
ModelLast UpdatedOrder Banks OpenETA for Data Available to OrderPricing Release DateStart of ProductionLast Date to Submit Orders to MerchantsBuild Out DateAverage Lead TimeImportant Updates

>> Back to Top

RAM

ModelLast UpdatedOrder Banks OpenETA for Data Available to OrderPricing Release DateStart of ProductionLast Date to Submit Orders to MerchantsBuild Out DateAverage Lead TimeImportant Updates
1500 DT (New Models)01/08/2021TBDTBDTBDTBDTBDTBD10-12 weeks
1500 Quad & Crew DS01/08/2021TBDTBDTBDTBDTBDTBD10-12 weeks
1500 Regular DS01/08/2021TBDTBDTBDTBDTBDTBD10-12 weeks
2500 Pickup 3500 Pickup & Chassis01/08/2021TBDTBDTBDTBDTBDTBD10-12 weeks
4500/5500 Chassis Cabs01/08/2021TBDTBDTBDTBDTBDTBD12-14 weeks
ProMaster (Big One)01/08/2021TBDTBDTBDTBDTBDTBD14 - 16 weeks
ProMaster City01/08/2021TBDTBDTBDTBDTBDTBD18-20 weeksPool orders have a 6 week lead time.
ModelLast UpdatedOrder Banks OpenETA for Data Available to OrderPricing Release DateStart of ProductionLast Date to Submit Orders to MerchantsBuild Out DateAverage Lead TimeImportant Updates

>> Back to Top

Rivian

ModelLast UpdatedOrder Banks OpenETA for Data Available to OrderPricing Release DateStart of ProductionLast Date to Submit Orders to MerchantsBuild Out DateAverage Lead TimeImportant Updates
R1S01/08/2021TBDTBDTBDTBDClosedReservation FullTBDDeliveries begin 01/01/2022 Adventure Package Explore Package
R1T01/08/2021TBDTBDTBDTBDClosedReservation FullTBDDeliveries begin 01/01/2022 Adventure Package Explore Package
ModelLast UpdatedOrder Banks OpenETA for Data Available to OrderPricing Release DateStart of ProductionLast Date to Submit Orders to MerchantsBuild Out DateAverage Lead TimeImportant Updates

>> Back to Top

Subaru

ModelLast UpdatedOrder Banks OpenETA for Data Available to OrderPricing Release DateStart of ProductionLast Date to Submit Orders to MerchantsBuild Out DateAverage Lead TimeImportant Updates
Ascent01/14/20218/18/2021TBD8/18/2021TBDTBDTBD8 - 10 weeksOTD for base option code vehicles will be up to 120 days after the first delivery month has occurred. First Delivery Month: September.
Crosstrek01/14/202111/17/2021TBD11/17/2021TBDTBDTBD8 - 10 weeksOTD for base option code vehicles will be up to 120 days after the first delivery month has occurred. First Delivery Month: January.
Legacy01/14/20213/17/2021TBD3/17/2021TBDTBDTBD8 - 10 weeksOTD for base option code vehicles will be up to 120 days after the first delivery month has occurred. First Delivery Month: May.
Outback01/14/20213/17/2021TBD3/17/2021TBDTBDTBD8 - 10 weeksOTD for base option code vehicles will be up to 120 days after the first delivery month has occurred. First Delivery Month: May.
Impreza01/14/20217/14/2021TBD7/14/2021TBDTBDTBD8 - 10 weeksOTD for base option code vehicles will be up to 120 days after the first delivery month has occurred. First Delivery Month: August.
Forester01/14/20219/15/2021TBD9/15/2021TBDTBDTBD8 - 10 weeksOTD for base option code vehicles will be up to 120 days after the first delivery month has occurred. First Delivery Month: November.
WRX/STi01/14/2021TBDTBDTBDTBDTBDTBD8 - 10 weeks
ModelLast UpdatedOrder Banks OpenETA for Data Available to OrderPricing Release DateStart of ProductionLast Date to Submit Orders to MerchantsBuild Out DateAverage Lead TimeImportant Updates

>> Back to Top

Tesla

ModelLast UpdatedOrder Banks OpenETA for Data Available to OrderPricing Release DateStart of ProductionLast Date to Submit Orders to MerchantsBuild Out DateAverage Lead TimeImportant Updates
Model S01/08/2021TBDTBDTBDTBDTBDTBD8-12 weeks
Model 301/08/2021TBDTBDTBDTBDTBDTBD8-12 weeks
Model X01/08/2021TBDTBDTBDTBDTBDTBD8-12 weeks
Model Y01/08/2021TBDTBDTBDTBDTBDTBD2-5 weeksModel Y Performance Dual Motor AWD 6-10 weeks
ModelLast UpdatedOrder Banks OpenETA for Data Available to OrderPricing Release DateStart of ProductionLast Date to Submit Orders to MerchantsBuild Out DateAverage Lead TimeImportant Updates

>> Back to Top

Toyota

ModelLast UpdatedOrder Banks OpenETA for Data Available to OrderPricing Release DateStart of ProductionLast Date to Submit Orders to MerchantsBuild Out DateAverage Lead TimeImportant Updates
4Runner01/08/2021TBDTBDTBDTBDTBDTBD17-19 weeksPlease note that 4Runner is built in Japan (VINS start with “J”) and unique shipping restrictions apply.
Avalon Gas/Hybrid01/08/2021TBDTBDTBDTBDTBDTBD8-12 weeks
C-HR01/08/2021TBDTBDTBDTBDTBDTBD17-19 weeksPlease note that C-HR is built in Japan (VINS start with “J”) and unique shipping restrictions apply.
Camry Gas/Hybrid01/08/2021TBDTBDTBDTBDTBDTBD8-12 weeks
Corolla Gas/Hybrid01/08/2021TBDTBDTBDTBDTBDTBD8-15 weeks
Corolla Hatchback01/08/2021TBDTBDTBDTBDTBDTBD12-16 weeksPlease note that Corolla Hatchback is built exclusively in Japan and unique shipping restrictions apply.
Highlander Gas/Hybrid01/08/2021TBDTBDTBDTBDTBDTBD10-12 weeks
Land Cruiser01/08/2021TBDTBDTBDTBDTBDTBD12-16 weeksPlease note that Land Cruiser is built exclusively in Japan and unique shipping restrictions apply.
Mirai (fuel cell)01/08/2021TBDTBDTBDTBDTBDTBD12-16 weeksAll New - CA deliveries only. Pre-approval required prior to ordering.
Prius01/08/2021TBDTBDTBDTBDTBDTBD16-20 weeksPlease note that Prius is built exclusively in Japan and unique shipping restrictions apply.
Prius Prime01/08/2021TBDTBDTBDTBDTBDTBD16-20 weeksPlease note that Prius is built exclusively in Japan and unique shipping restrictions apply.
RAV4 Gas/Hybrid01/08/2021TBDTBDTBDTBDTBDTBD8-12 weeksSome RAV4's are built in Japan.
RAV4 Prime01/08/2021TBDTBDTBDTBDTBDTBD16-20 weeksPlease note that RAV4 Prime is built exclusively in Japan and unique shipping restrictions apply.
Sequoia01/08/2021TBDTBDTBDTBDTBDTBD16-20 weeks
Sienna01/08/2021TBDTBDTBDTBDTBDTBD8-10 weeksAll New - Hybrid only. No models come factory equipped with a spare tire.
Supra01/08/2021TBDTBDTBDTBDTBDTBD8-10 weeks
Tacoma01/08/2021TBDTBDTBDTBDTBDTBD16-20 weeks
Tundra01/08/2021TBDTBDTBDTBDTBDTBD8-16 weeks
Venza01/08/2021TBDTBDTBDTBDTBDTBD8-12 weeksAll new hybrid AWD model.
Yaris Sedan/Hatchback01/08/2021TBDTBDTBDTBDTBDTBD12-16 weeks
ModelLast UpdatedOrder Banks OpenETA for Data Available to OrderPricing Release DateStart of ProductionLast Date to Submit Orders to MerchantsBuild Out DateAverage Lead TimeImportant Updates

>> Back to Top

Volkswagen

ModelLast UpdatedOrder Banks OpenETA for Data Available to OrderPricing Release DateStart of ProductionLast Date to Submit Orders to MerchantsBuild Out DateAverage Lead TimeImportant Updates
Arteon01/08/2021TBDTBDTBDTBDTBDTBD12-14 weeks
Atlas01/08/2021TBDTBDTBDTBDTBDTBD12-14 weeks
Atlas Cross Sport01/08/2021TBDTBDTBDTBDTBDTBD12-14 weeks
BEV Crossover01/08/2021TBDTBDTBDTBDTBDTBDTBD
Jetta 1.4T01/08/2021TBDTBDTBDTBDTBDTBD12-14 weeks
Jetta GLI01/08/2021TBDTBDTBDTBDTBDTBD12-14 weeks
Passat01/08/2021TBDTBDTBDTBDTBDTBD12-14 weeks
Tiguan01/08/2021TBDTBDTBDTBDTBDTBD12-14 weeks
ID.4 RWD01/08/2021TBDTBDTBDTBDTBDTBD12-14 weeks
ID.4 AWD01/08/2021TBDTBDTBDTBDTBDTBD12-14 weeks
ModelLast UpdatedOrder Banks OpenETA for Data Available to OrderPricing Release DateStart of ProductionLast Date to Submit Orders to MerchantsBuild Out DateAverage Lead TimeImportant Updates

>> Back to Top