OEM Updates, All in One Place

Manufacturers’ Information

Manufacturers’ Build-out and Start-up Dates for 2020

Find valuable build out and order bank information on popular fleet vehicles, consolidated into one easy to navigate location. Below you can click through any of the various manufacturers’ build-out and start-up dates for US cars and US trucks. Please be aware these dates change regularly.

Quick Menu: 2021 Build-outs | 2020 Fleet Incentives

Select a Manufacturer:

Audi | Buick | Cadillac | Chevrolet | Chrysler | Dodge | Ford | GMC | Hyundai | Infinity | Jeep | Lincoln | Mazda | Mercedes | Nissan | RAM | Subaru | Toyota | Volkswagen | Volvo

Audi

ModelLast UpdatedOrder Banks OpenETA for Data Available to OrderPricing Release DateStart of ProductionLast Date to Submit Orders to MerchantsBuild Out DateAverage Lead TimeImportant Updates
A3/S301/27/20205/31/201905/31/20198/12/20195/1/2019TBDTBD14-16 weeks
A4/S405/29/20205/31/201911/22/201912/23/20198/1/2019TBDMarch 202014-16 weeks
A5/S505/29/20206/28/201911/25/2019TBD9/1/2019TBDMarch 202014-16 weeks
A6/S6/RS605/29/20205/31/201906/21/20198/9/20195/1/2019TBDMarch 202014-16 weeks
A7/S7/RS705/29/20205/31/201905/31/20198/9/201910/1/2019TBDMarch 202014-16 weeks
A8/S805/29/20205/31/201905/29/2019TBD5/1/2019TBDMarch 202014-16 weeks
e-tron quattro/sportback05/29/2020TBD
Q305/29/20205/31/201906/21/2019TBD5/1/2019TBDMarch 202014-16 weeks
Q505/29/20205/31/201905/31/20198/9/20195/1/2019TBDMarch 202012-14 weeks
Q7/SQ705/29/20208/30/201911/22/201912/18/20198/1/2019TBDMarch 202014-16 weeks
Q8/SQ8/R8/RSQ805/29/20205/31/201905/31/20198/9/20195/1/2019TBDMarch 202014-16 weeks
TT/TTS/TT RS05/29/20205/31/201905/31/20198/9/2019TBDTBDMarch 202014-16 weeks
ModelLast UpdatedOrder Banks OpenETA for Data Available to OrderPricing Release DateStart of ProductionLast Date to Submit Orders to MerchantsBuild Out DateAverage Lead TimeImportant Updates

>> Back to Top

Buick

ModelLast UpdatedOrder Banks OpenETA for Data Available to OrderPricing Release DateStart of ProductionLast Date to Submit Orders to MerchantsBuild Out DateAverage Lead TimeImportant Updates
Encore06/03/20204/25/20195/7/20196/27/20197/1/2019CLOSED5/29/202024-26 weeks
Encore GX06/03/2020    CLOSED7/17/2020 
Envision06/03/20201/31/20192/12/20195/7/20195/6/2019CLOSED8/28/202021-23 weeks
Enclave07/23/20204/25/20195/7/20196/10/20196/17/20196/12/202010/9/20209-11 weeksBuildout in process
Regal (Sportback/TourX)06/03/20204/25/2019TBDTBD8/5/2019CLOSEDCLOSED20-22 weeks
ModelLast UpdatedOrder Banks OpenETA for Data Available to OrderPricing Release DateStart of ProductionLast Date to Submit Orders to MerchantsBuild Out DateAverage Lead TimeImportant Updates

>> Back to Top

Cadillac

ModelLast UpdatedOrder Banks OpenETA for Data Available to OrderPricing Release DateStart of ProductionLast Date to Submit Orders to MerchantsBuild Out DateAverage Lead TimeImportant Updates
CT406/03/20209/9/20199/16/201910/09/20198/30/2019CLOSED9/24/20208-10 weeks
CT506/03/20206/20/20197/2/201907/17/20198/30/2019CLOSED9/24/20208-10 weeks
CT606/03/20205/23/20195/21/201906/04/20198/5/2019CLOSEDCLOSED9-11 weeks
Escalade/Escalade ESV07/23/20205/9/20195/6/201905/24/20196/24/2019CLOSEDCLOSED13-15 weeks
XT406/03/20204/25/20194/22/201905/24/20196/17/2019CLOSED8/26/20209-11 weeks
XT507/30/20206/6/20196/18/201907/09/20198/5/2019CLOSED8/21/20209-11 weeks
XT607/30/20202/28/20193/12/201904/08/20195/31/2019CLOSED8/21/20209-11 weeks
ModelLast UpdatedOrder Banks OpenETA for Data Available to OrderPricing Release DateStart of ProductionLast Date to Submit Orders to MerchantsBuild Out DateAverage Lead TimeImportant Updates

>> Back to Top

Chevrolet

ModelLast UpdatedOrder Banks OpenETA for Data Available to OrderPricing Release DateStart of ProductionLast Date to Submit Orders to MerchantsBuild Out DateAverage Lead TimeImportant Updates
Blazer07/30/20206/20/20196/24/20199/5/20198/12/2019CLOSED8/15/202012-14 weeks
Bolt06/03/20206/6/20198/21/20199/11/20197/31/2019TBDTBD8-10 weeks
Camaro07/30/20206/6/2019TBDTBD7/22/2019CLOSEDCLOSED8-10 weeks
Corvette07/23/2020    TBDQ4 Buildout in process
Colorado07/30/20205/23/20195/27/20193/1/20197/15/2019CLOSEDCLOSED13-15 weeks
Equinox07/23/20204/25/20194/22/20195/24/20196/17/2019CLOSED9/18/20209-11 weeksBuildout in process
Express (Cargo/Cutaway/Pass)07/23/20206/20/20196/26/20196/28/20198/19/2019CLOSED9/23/202025-27 weeksBuildout in process 2/21/20 - order cut off with GM moved up.
Impala07/30/20205/23/2019TBD6/7/20198/19/2019CLOSEDCLOSED10-12 weeks
LCF 3500/4500 Gas06/03/20208/1/201910/15/20191/20/202010/15/20196/18/202010/30/2020 
LCF 4500/5500 HD/XD Diesel06/03/202010/9/2018TBDTBD1/2/2019CLOSED12/31/2019 
LCF 6500 XD Diesel06/03/202010/9/2018TBD2/7/20191/2/2019CLOSED3/31/2020 
Malibu07/30/20204/25/20195/7/20195/8/20195/31/2019CLOSED9/1/202010-12 weeks
Silverado LD 1500 Regular06/03/20205/9/20196/7/20195/22/20198/5/2019CLOSED9/18/202012-14 weeks2/21/20 - order cut off with GM moved up.
Silverado LD 1500 Double06/03/20205/9/20196/7/20195/22/20198/5/2019CLOSED9/11/202014-16 weeks2/21/20 - order cut off with GM moved up.
Silverado LD 1500 Crew06/03/20205/9/20196/7/20195/22/20198/5/2019CLOSED9/18/202012-14 weeks2/21/20 - order cut off with GM moved up.
Silverado MD 2500/3500 Regular06/03/20205/23/20193/11/20195/23/20198/30/2019CLOSED9/25/202013-15 weeks2/21/20 - order cut off with GM moved up.
Silverado MD 2500/3500 Double06/03/20207/18/2019TBD5/23/20191/6/2020CLOSED9/25/202013-15 weeks2/21/20 - order cut off with GM moved up.
Silverado MD 2500/3500 Crew06/03/20207/18/2019TBD5/23/20191/6/2020CLOSED9/25/202013-15 weeks
Silverado Medium Duty06/03/20206/20/20196/11/20195/10/20199/30/20196/18/202011/27/202031-33 weeks2/21/20 - order cut off with GM moved up.
Silverado 4500/5500/650006/03/2020CLOSED9/25/202031-33 weeks2/21/20 - order cut off with GM moved up.
Sonic07/30/20205/23/20196/5/20196/19/20197/31/2019CLOSED10/20/202022-24 weeks2/21/20 - order cut off with GM moved up.
Spark06/03/20203/28/20194/9/20194/11/20196/3/2019CLOSED5/29/202024-26 weeks
Suburban07/30/20205/9/20195/21/20196/21/20196/24/2019CLOSED4/8/202013-15 weeks
Tahoe06/03/20205/9/20195/21/20197/1/20196/24/2019CLOSED4/8/202013-15 weeks
Tahoe Police06/03/20205/9/20195/21/2019TBD6/24/2019CLOSED4/8/202022-24 weeks
Traverse07/23/20204/25/20194/25/20195/31/20196/17/20196/18/202010/9/20209-11 weeksBuildout in process
Trax06/03/20204/25/20195/7/20196/26/20197/1/2019CLOSED8/31/202014-16 weeks
ModelLast UpdatedOrder Banks OpenETA for Data Available to OrderPricing Release DateStart of ProductionLast Date to Submit Orders to MerchantsBuild Out DateAverage Lead TimeImportant Updates

>> Back to Top

Chrysler

ModelLast UpdatedOrder Banks OpenETA for Data Available to OrderPricing Release DateStart of ProductionLast Date to Submit Orders to MerchantsBuild Out DateAverage Lead TimeImportant Updates
30005/06/202011/05/201911/13/201911/05/201911/19/20198/27/202011/6/20208-10 weeks
Pacifica05/06/202006/07/201908/12/201907/25/201908/13/20198/27/202010/30/20208-10 weeks
Voyager05/06/202006/12/201907/08/201907/03/201908/12/20198/27/202010/30/20208-10 weeks
ModelLast UpdatedOrder Banks OpenETA for Data Available to OrderPricing Release DateStart of ProductionLast Date to Submit Orders to MerchantsBuild Out DateAverage Lead TimeImportant Updates

>> Back to Top

Dodge

ModelLast UpdatedOrder Banks OpenETA for Data Available to OrderPricing Release DateStart of ProductionLast Date to Submit Orders to MerchantsBuild Out DateAverage Lead TimeImportant Updates
Challenger5/6/202011/5/201911/20/201911/5/201911/18/20198/27/202011/6/20208-10 weeks 
Charger5/6/202011/5/201911/7/201911/5/201911/18/20198/27/202011/6/20208-10 weeks 
Durango6/25/20206/6/20197/23/20197/2/201907/29/20196/18/20209/12/20208-10 weeks 
Grand Caravan5/6/202012/17/201912/30/201912/17/201901/02/2020CLOSED8/21/20208-10 weeks2020MY is the final production year. Not available in the following states due to EPA regulations: CA, CT, DE, ME, MD, MA, NJ, NY, OR, PA, RI, VT & WA
Journey5/6/202012/11/201912/26/201912/11/201901/13/202010/1/202012/23/202010-12 weeksN/A for sale in California Emission States (CA & CT)
ModelLast UpdatedOrder Banks OpenETA for Data Available to OrderPricing Release DateStart of ProductionLast Date to Submit Orders to MerchantsBuild Out DateAverage Lead TimeImportant Updates

>> Back to Top

Ford

ModelLast UpdatedOrder Banks OpenETA for Data Available to OrderPricing Release DateStart of ProductionLast Date to Submit Orders to MerchantsBuild Out DateAverage Lead TimeImportant Updates
Econoline2/11/2020N/AN/AN/AN/AN/AN/ASkipped Model Year 2020.
Ecosport8/3/20204/1/20194/11/20193/26/201907/01/20192/21/20208/31/202020-22 weeks 
Edge8/3/20207/15/20197/30/20197/14/201909/30/20199/25/202012/23/202014-16 weeks5/18/2020 - Oakville Assembly plant opening 5/25/2020
Escape8/3/20205/12/20195/22/20195/15/201908/19/20199/25/202012/23/202014-16 weeksJob 1 order banks converted to Job 3 1/10/20. Exterior color Sedona Orange early cut off - 1/10/2020; PHEV order banks open 12/20/19. 2/17/20 - PHEV(plug in) NOT available until MAY 2020 Early balance out (PBP)-Sedona Orange – 2/3/2020 5/18/2020 - Louisville Assmebly plant opening May 18th, 2020
Expedition5/18/20207/17/20198/1/2019TBD10/14/2019TBDTBD10-12 weeks5/18/2020 - Kentucky Truck plant opening 5/18/2020
Explorer (Retail/Fleet/Police)8/3/20201/21/20191/31/20192/8/201905/06/2019CLOSED9/23/202022-24 weeksLead time for Explorer police is 10-18 weeks. 2/17/20 - Early balance out paints 4/24/2020 last production F.O.D.D. 2/14/2020 (B6)-Rich Copper PN4GJ (FT)-Blue Metallic PN4FT (BN)-Silver Spruce PN4GN (FT)-Blue Metallic PN4FT POLICE - Scheduling for LPO (limited paint) is TBD: Sterling Gray Metallic(UJ)(PN3KD), Kodiak Brown(J1)(PNBAB), Norcea Blue Pearl(KR)(PN3CH), Smokestone (HG) (PN3FF), Med Brown Metallic(BU)(PNBBB), Dark Toreador(JL)(PNEVA), Vermilion Solid C/C (E4)(PNEGC), Silver Gray Met(TN)(PNMND), Med Titanium C/C(YG)(PNYAF)C/C(JL)(PNEVA),Dark Blue Solid(LK)(PNKSA), 4/21/2020 - updated build out date per Ford schedule. Early balance out paints (B6)-Rich Copper PN4GJ (FT)-Blue Metallic PN4FT (BN)-Silver Spruce PN4GN (J7)-Magnetic PN4DQ 5/18/2020 - Chicago Assembly Plant opening 5/18/2020
F1505/18/20207/15/20197/25/20197/15/201910/07/20195/22/20205/29/202012-14 weeksKansas City plant start of production is 11/4/19; Police model start of production is 11/4/19 2/17/20 Pls note: Restricted paint (LPO) will be scheduled in batches and may result in a scheduling delay of 6 or more weeks. - Green (PN4GW), Orange (PN4GX), Vermillion Red (PNEGC), Yellow (PN4GY), School Bus Yellow (PNAHF. NO LPO PRODUCTION 3/16/20 – 4/05/20. 3.0L Diesel Engine (991) - delay 4/21/2020 - updated build out date per Ford schedule. F150 leadtime now 16-18 weeks. Early balance out LPO – 7/12/20 Pls note: Restricted paint (LPO) will be scheduled in batches and may result in a scheduling delay of 6 or more weeks. - Green (PN4GW), Orange (PN4GX), Vermillion Red (PNEGC), Yellow (PN4GY), School Bus Yellow (PNAHF). 3.0L Diesel Engine (991) - delay 5/18/2020 - Dearborn/Kansas City plants opening 5/18/2020. 2020MY F150 Order / Production Status:_x000D_ • All 2020MY F-150 orders currently in the Unscheduled Order Bank (USOB) will be produced (i.e. we will build everything currently in our order bank)_x000D_ • We’ve requested additional allocation to build 100% of Fleet Orders received by 5/29 (FODD)_x000D_ • FINAL ORDER DUE DATE for 2020 F-150 is 5/29 _x000D_ _x000D_ Production Restart _x000D_ • Both DTP and KCAP resume production 5/18_x000D_ • Both plants currently have “scheduled” production through the week of 6/22 _x000D_ • Orders previewing to schedule this week are for the week of 7/6 production (some of these orders might pull into June)_x000D_ • Remaining orders currently in the USOB will fill fleet allocation through July production_x000D_ _x000D_ Additional 2020 Orders_x000D_ • New 2020 F-150 orders placed by 5/29 will begin filling August production, and go through balance out production:_x000D_ • 20MY Job last at DTP is 9/6 and KCAP is 10/11_x000D_ • 21MY Job 1 date at DTP is 10/12 and KCAP is 11/9_x000D_ • 21MY USOB opens 7/15, and scheduling begins in August for Job 1 production_x000D_ _x000D_ Message to customers: _x000D_ Customers requiring F-150 deliveries mid-summer through mid-December should place 20MY orders before 5/29 FODD_x000D_
Fusion8/3/20205/13/20195/21/20195/12/201908/05/20192/21/20207/31/202014-16 weeks2020 is final production year. 2/17/20 - Early balance out paints – 5/2/2020 Final orders due to plant on 2/20/2020 (E7) Velocity Blue PN4GL (D4) Lucid Red PN4HQ 5/18/2020 - Hermosillo plant openeing 5/18/2020
Motorhome2/11/20209/16/2019TBDTBD01/06/2020TBDTBD18-20 weeks 
Mustang8/3/20205/13/20195/24/20195/8/201908/26/20199/25/202012/23/202012-14 weeks5/18/2020 - Cuautitian plant (Mustang Mach-E) opening 5/18/2020 Flat Rock plant (Mustang/Shelby) opening 5/25/2020
Ranger8/3/20208/12/20199/3/20198/12/201911/18/20199/25/202012/23/202014-16 weeks2/17/20 - Fleet order type with 58B (MO Cluster and Mechless Radio) – 1/13/2020 est. Stop Build lifted, scheduling for 3/2/2020 Early balance out paint – (GU) Saber (PN4GB) 5/18/2020 - Michigan plant opening 5/18/2020
Super Duty5/18/2020   TBDTBD2/17/20 - SUPER DUTY D2 TBD C3–3/16 KTP: 6/29, 7/6 OHAP: 6/29 10-12 weeks 40 gallon fuel tank – 4 to 6 week additional delay. Gaseous Fuel Prep (98G) & Gaseous Fuel Prep Pkg #2 (98F) – 3/30/20 (KTP), 4/20/20 (OHAP) OHAP only F600 (F6K, F6L) Order Bank open – 3/2/2020 Job #1 – Estimated June 1 OK to Buy – Estimated Mid-June OHAP only 102” Exterior Mirror – estimated MP2 6/1/2020. OHAP only AFT-Axle Frame Extension – option 63C Silver Spruce Paint (BN) – production begins 3/20/30 MP2 Pls note: Restricted paint will be scheduled in batches and may result in a scheduling delay of 6 or more weeks. Green (PN4GW), Orange (PN4GX), Vermillion Red (PNEGC), Yellow (PN4GY), School Bus Yellow (PNAHF), Green Gem (PN4DA). Pacific Gas/Electric Blue (PN4GC) SUPER DUTY ***ATTENTION**** Attention needed, please review your F450/F550 XLT Reg Chassis Cab 4x2 orders for options that appear to be unscheduled/clean but are not being selected for scheduling. Review the list of options below that are currently not buildable with F450/F550 XLT Reg Chassis Cab 4x2. Adjustments to the orders are required for scheduling.5/18/2020 - Kentucky Truck plant opening 5/18/2020
Transit 150-250-3508/3/20207/15/20198/1/20198/5/201910/21/20199/25/202012/23/202016-18 weeksTransit VSO order banks opened 8/26/19; start of production is 12/16/19. 5/18/2020 - Kansas City plant opening 5/18/2020
Transit Connect5/18/20202/10/20192/28/20192/11/201905/05/20191/24/20201/31/202020-22 weeks_x000D_ 5/18/2020 - Kansas City plant opening 5/18/2020
ModelLast UpdatedOrder Banks OpenETA for Data Available to OrderPricing Release DateStart of ProductionLast Date to Submit Orders to MerchantsBuild Out DateAverage Lead TimeImportant Updates

>> Back to Top

GMC

ModelLast UpdatedOrder Banks OpenETA for Data Available to OrderPricing Release DateStart of ProductionLast Date to Submit Orders to MerchantsBuild Out DateAverage Lead TimeImportant Updates
Acadia06/03/202006/06/20196/18/20196/3/20198/5/2019CLOSED8/14/20209-11 weeks 
Canyon06/03/202005/23/20196/5/20193/1/20197/15/2019CLOSED6/26/202013-15 weeks 
Savana (Cargo/Cutaway/Pass)06/03/202006/20/20196/26/2019TBD8/19/2019CLOSED9/23/202023-25 weeks2/21/20 = GM pulled up order cut off.
Sierra 1500 Regular06/03/202005/09/20196/3/20195/17/20198/5/2019CLOSED9/18/202012-14 weeks2/21/20 = GM pulled up order cut off.
Sierra 1500 Double06/03/202005/09/20196/3/20195/17/20198/5/2019CLOSED9/11/202014-16 weeks2/21/20 = GM pulled up order cut off.
Sierra 1500 Crew06/03/202005/09/20196/3/20195/17/20198/5/2019CLOSED9/18/202012-14 weeks2/21/20 = GM pulled up order cut off.
Sierra 2500/3500 Regular06/03/202005/23/20193/26/20195/23/20198/30/2019CLOSED9/25/202013-15 weeksDiesel engine order banks open 10/10/19; start of production is in December.
Sierra 2500/3500 Double06/03/202007/18/2019TBD5/23/20191/6/2020CLOSED9/25/202013-15 weeks2/21/20 = GM pulled up order cut off.
Sierra 2500/3500 Crew06/03/202007/18/2019TBD5/23/20191/6/2020CLOSED9/25/202013-15 weeks2/21/20 = GM pulled up order cut off.
Terrain07/23/202004/25/20195/3/20195/24/20196/17/2019CLOSED9/18/20209-11 weeksBuildout in process
Yukon06/03/202005/09/20195/10/20196/7/20196/24/2019CLOSED4/8/202013-15 weeks 
Yukon XL06/03/202005/09/20195/10/20195/14/20196/24/2019CLOSED4/8/202013-15 weeks 
ModelLast UpdatedOrder Banks OpenETA for Data Available to OrderPricing Release DateStart of ProductionLast Date to Submit Orders to MerchantsBuild Out DateAverage Lead TimeImportant Updates

>> Back to Top

Hyundai

ModelLast UpdatedOrder Banks OpenETA for Data Available to OrderPricing Release DateStart of ProductionLast Date to Submit Orders to MerchantsBuild Out DateAverage Lead TimeImportant Updates
Accent05/01/20203/31/2019TBDTBD5/31/20192/18/20205/1/202012-16 weeks
Elantra05/01/20203/31/2019TBDTBD5/22/20194/13/20207/1/202012-16 weeks
Elantra GT05/01/20203/31/2019TBDTBD5/22/20194/13/20206/1/202012-16 weeks
Ioniq EV05/01/20208/31/2019TBDTBD10/31/20194/13/20207/1/202012-16 weeks
Ioniq HEV/PHEV05/01/20207/31/2019TBDTBD9/30/20194/13/20207/1/202012-16 weeks
Kona05/01/20204/30/2019TBDTBD6/30/20192/18/20205/1/202012-16 weeks
Palisade05/01/20206/30/2019TBDTBD6/30/20192/18/20205/1/202012-16 weeks
Santa Fe05/01/20204/30/2019TBDTBD6/30/20196/15/20209/1/202012-16 weeks
Sonata Gas05/01/20209/30/2019TBDTBD11/30/20193/13/20206/1/202012-16 weeks
Sonata HEV05/01/20209/30/2019TBDTBD11/30/20193/13/20206/1/202012-16 weeks
Tucson05/01/20205/31/2019TBDTBD7/31/20192/18/20205/1/202012-16 weeks
Veloster05/01/20202/28/2019TBDTBD4/30/201911/2/20193/1/202012-16 weeks
Venue05/01/20207/31/2019TBDTBD9/30/20193/13/20206/1/202012-16 weeks
ModelLast UpdatedOrder Banks OpenETA for Data Available to OrderPricing Release DateStart of ProductionLast Date to Submit Orders to MerchantsBuild Out DateAverage Lead TimeImportant Updates

>> Back to Top

Infinity

ModelLast UpdatedOrder Banks OpenETA for Data Available to OrderPricing Release DateStart of ProductionLast Date to Submit Orders to MerchantsBuild Out DateAverage Lead TimeImportant Updates
Q5001/27/20203/16/201904/02/20199/18/20198/2/20192/21/20202/28/202016-24 weeks
Q6001/27/20203/16/201904/02/20199/18/20198/2/20193/24/20203/31/202016-24 weeks
QX5002/03/20204/16/201904/02/20199/18/20198/2/20191/24/20202/1/202016-20 weeks
QX8001/27/20205/16/201905/09/2019########10/2/2019################16-24 weeks
ModelLast UpdatedOrder Banks OpenETA for Data Available to OrderPricing Release DateStart of ProductionLast Date to Submit Orders to MerchantsBuild Out DateAverage Lead TimeImportant Updates

>> Back to Top

Jeep

ModelLast UpdatedOrder Banks OpenETA for Data Available to OrderPricing Release DateStart of ProductionLast Date to Submit Orders to MerchantsBuild Out DateAverage Lead TimeImportant Updates
Cherokee05/06/20206/7/201907/06/20196/21/20194/29/20195/28/20208/28/20208-10 weeks
Grand Cherokee06/25/20206/7/201906/26/20196/21/20197/30/20196/18/20209/12/20208-10 weeks
Compass05/06/20206/12/201907/04/20196/21/20195/29/20204/30/20207/4/202010-12 weeks
Gladiator05/06/20204/10/201904/09/20194/8/20193/25/20195/28/20208/21/202010-12 weeks
Renegade05/06/20206/6/201907/04/20196/18/20197/29/2019TBDTBD8-10 weeks
Wrangler05/06/20206/7/201907/23/20197/2/20197/23/20195/28/20208/7/20208-10 weeks
ModelLast UpdatedOrder Banks OpenETA for Data Available to OrderPricing Release DateStart of ProductionLast Date to Submit Orders to MerchantsBuild Out DateAverage Lead TimeImportant Updates

>> Back to Top

Lincoln

ModelLast UpdatedOrder Banks OpenETA for Data Available to OrderPricing Release DateStart of ProductionLast Date to Submit Orders to MerchantsBuild Out DateAverage Lead TimeImportant Updates
Aviator08/03/20201/21/20192/6/201901/22/20195/6/2019CLOSED9/23/202012-14 weeksPHEV n/a until July 2/17/20 Early balance out paints 4/24/2020 last production F.O.D.D. 02/14/2020 (B6)-Crystal Copper PN4GJ (FT)- Blue Diamond PN4FT 4/21/20 - change balance out date per Ford schedule
Continental02/11/20207/17/20198/13/201907/16/201910/21/2019TBDTBD14-16 weeks 
Corsair04/21/20205/16/20196/3/201906/24/20198/19/2019CLOSED4/3/2020`2/17/20 Removed option 64D (20x8” cast alum prem painted wheel) with 86D (locking wheel lug nut) option from 2020MY. 4/21/20 - change balance out date per Ford schedule
MKZ02/17/20205/13/20195/28/201906/09/20198/4/20192/21/20202/28/202010-12 weeks2020 is final production year 2/1/7/20 Early balance out paints – 5/2/2020_x000D_ Final orders due to plant on 2/20/2020_x000D_ (GS) Ceramic Pearl PN4GT_x000D_ (N5) Rhapsody Blue PN4EZ_x000D_ (D4) Red Carpet TC PN4HQ_x000D_
Nautilius08/03/20207/15/20198/30/201908/13/20199/30/20199/25/202012/23/202010-12 weeks 
Navigator02/11/20207/16/20198/7/201907/17/201910/13/2019TBDTBD12-14 weeks 
ModelLast UpdatedOrder Banks OpenETA for Data Available to OrderPricing Release DateStart of ProductionLast Date to Submit Orders to MerchantsBuild Out DateAverage Lead TimeImportant Updates

>> Back to Top

Mazda

ModelLast UpdatedOrder Banks OpenETA for Data Available to OrderPricing Release DateStart of ProductionLast Date to Submit Orders to MerchantsBuild Out DateAverage Lead TimeImportant Updates
CX301/27/20209/3/2019################11/1/2019TBDTBD12-16 weeks
CX3001/27/20209/30/2019########################TBDTBD12-16 weeks
CX501/27/20207/29/2019TBDTBD10/1/2019TBDTBD12-16 weeks
CX901/27/20207/29/201911/6/2019TBD10/1/2019TBDTBD12-16 weeks
Mazda3 5 Door01/27/20206/3/201910/7/2019TBD7/31/2019TBDTBD12-16 weeks
Mazda3 Sedan01/27/20206/3/201910/7/2019TBD7/31/2019TBDTBD12-16 weeks
Mazda601/27/20207/29/201911/1/2019TBD10/1/2019TBDTBD12-16 weeks
MX-5 Miata01/27/20209/30/2019TBDTBD########TBDTBD12-16 weeks
MX-RF Miata01/27/20209/30/2019TBDTBD########TBDTBD12-16 weeks
ModelLast UpdatedOrder Banks OpenETA for Data Available to OrderPricing Release DateStart of ProductionLast Date to Submit Orders to MerchantsBuild Out DateAverage Lead TimeImportant Updates

>> Back to Top

Mercedes

ModelLast UpdatedOrder Banks OpenETA for Data Available to OrderPricing Release DateStart of ProductionLast Date to Submit Orders to MerchantsBuild Out DateAverage Lead TimeImportant Updates
C-Cab3/11/20204/30/20197/1/2019TBD6/29/2019CLOSED1/1/202016-18 weeks
C-Coupe3/11/20204/30/20197/1/2019TBD6/29/2019CLOSED1/1/202016-18 weeks
CLA3/11/20205/31/20198/22/2019TBD9/1/2019CLOSED1/1/202016-18 weeks
CLS3/11/20204/30/201910/29/2019TBD8/1/2019CLOSED2/1/202016-18 weeks
C-Sedan3/11/20204/30/20197/1/2019TBD6/29/2019CLOSED2/1/202016-18 weeks
E-Cab3/11/20204/30/20195/27/2019TBD6/29/2019CLOSED3/1/202014-16 weeks
E-Coupe3/11/20204/30/20195/27/2019TBD8/1/2019CLOSED3/1/202014-16 weeks
E-Sedan3/11/20204/30/20195/27/2019TBD8/1/2019CLOSED1/1/202014-16 weeks
E-Wagon3/11/20204/30/20195/27/2019TBD8/1/2019CLOSED1/1/202014-16 weeks
G3/11/20206/28/2019TBDTBD10/1/20193/25/20204/1/202014-16 weeks
GLA3/11/20204/30/20195/13/2019TBD6/29/2019CLOSED1/1/202014-16 weeks
GLB3/11/20205/31/201910/18/2019TBD8/1/2019CLOSED1/1/202014-16 weeks
GLC - SUV3/11/20203/29/20196/20/2019TBD9/3/20193/25/20204/1/202014-16 weeksW series only
GLC - Coupe3/11/20203/29/20196/20/2019TBD9/3/2019CLOSED1/1/202014-16 weeks
GLE - SUV3/11/20204/1/20192/6/2019TBD7/2/2019CLOSED3/1/202014-16 weeks
GLE - Coupe3/11/20204/1/20192/6/2019TBD7/2/2019Submit orders to Merchants 5 days prior to Build OutSee important update column14-16 weeksGLE53C4 - B/O 8/1/2020 GLE63C4S - B/O 1/1/2020
GLS3/11/20204/1/20199/27/2019TBD11/2/2019CLOSED2/1/202014-16 weeks
GT - Coupe3/11/2020unknwn7/16/2019TBD2/1/2019CLOSED2/1/202014-16 weeks
GT - Roadster3/11/2020unknwn7/16/2019TBD2/1/2019CLOSED2/1/202014-16 weeks
GT - 4dr Coupe3/11/2020unknwn7/16/2019TBD2/1/2019CLOSED2/1/202014-16 weeks
Maybach3/11/20204/1/20198/13/2019TBD9/3/2019CLOSED12/1/201914-16 weeks
Metris7/15/20204/16/20196/4/2019TBD6/29/2019CLOSED9/1/202018-22 weeks
S-Sedan3/11/20204/1/20197/16/2019TBD6/29/20194/24/20205/1/202014-16 weeks
S-Coupe3/11/20204/1/20197/16/2019TBD6/29/2019CLOSED2/1/202014-16 weeks
S-Cab3/11/20204/1/20197/16/2019TBD6/29/2019CLOSED2/1/202014-16 weeks
Sprinter7/15/20204/16/20196/4/2019TBD6/29/20197/16/202012/1/202020-22 weeks7/15/2020= order cut off of July 16th includes; Sprinter Cargo, Passenger, Crew and Cab/Chassis
ModelLast UpdatedOrder Banks OpenETA for Data Available to OrderPricing Release DateStart of ProductionLast Date to Submit Orders to MerchantsBuild Out DateAverage Lead TimeImportant Updates

>> Back to Top

Nissan

ModelLast UpdatedOrder Banks OpenETA for Data Available to OrderPricing Release DateStart of ProductionLast Date to Submit Orders to MerchantsBuild Out DateAverage Lead TimeImportant Updates
Frontier6/30/20201/15/20201/15/2020TBD04/01/2020TBDTBD16-20 weeks
Altima Sedan6/30/20203/1/20193/1/2019TBD06/03/20192/21/20203/1/202012-16 weeks
Arada6/30/20203/15/20203/15/2020TBD06/03/2019COMPLETE7/1/2020
Kicks6/30/20207/15/20197/25/201912/3/201911/01/2019TBD6/1/202016-20 weeks
Leaf6/30/20208/15/20196/19/2019TBD12/02/2019COMPLETE5/1/202016-20 weeks
Maxima6/30/20204/15/20193/11/2019TBD08/01/2019COMPLETE4/1/202016-20 weeks
Murano6/30/20205/15/20205/15/2019TBD05/15/2020COMPLETE4/1/202016-20 weeks
NV1500/2500/35006/30/20204/15/20204/15/2020TBD04/15/2020COMPLETE5/1/202016-20 weeks
NV Cargo/Passenger6/30/20204/15/20193/11/2019TBD07/01/2019COMPLETE5/1/202016-20 weeks
NV2006/30/20205/15/20195/9/2019TBD09/02/2019COMPLETE4/1/202016-20 weeks
Pathfinder6/30/20205/15/20195/15/2019TBD09/02/2019TBDTBD16-20 weeks
Rogue6/30/20204/15/20193/11/2019TBD07/01/2019COMPLETE3/1/202016-20 weeks
Rogue Sport6/30/20204/15/20193/11/201911/26/201911/01/2019COMPLETE3/1/2020 
Sentra6/30/20209/2/2019TBDTBD01/02/2020COMPLETE4/1/202012-20 weeks
Titan6/30/20208/15/20197/25/2019TBD12/02/2019COMPLETE4/1/202016-20 weeks
Versa Sedan6/30/20203/15/20193/11/2019TBD06/03/2019COMPLETE4/1/202016-20 weeks
370Z Coupe6/30/20202/15/2019TBDTBD04/01/2019COMPLETECOMPLETE16-20 weeks
370Z Roadster6/30/2020TBDTBDTBD04/01/2019TBDTBD16-20 weeks
ModelLast UpdatedOrder Banks OpenETA for Data Available to OrderPricing Release DateStart of ProductionLast Date to Submit Orders to MerchantsBuild Out DateAverage Lead TimeImportant Updates

>> Back to Top

Ram

ModelLast UpdatedOrder Banks OpenETA for Data Available to OrderPricing Release DateStart of ProductionLast Date to Submit Orders to MerchantsBuild Out DateAverage Lead TimeImportant Updates
1500 DT (New Models)05/06/202006/06/201906/26/201906/20/201907/22/20195/28/20208/29/20208-10 weks
1500 Quad & Crew DS05/06/202011/05/201911/13/201911/05/201911/25/201910/1/202012/18/20208-10 weeks
1500 Regular DS05/06/202011/05/201911/13/201911/05/201901/02/202010/1/202012/23/202012-14 weeks
2500 Pickup 3500 Pickup & Chassis05/06/202010/02/201910/04/201909/26/201911/25/20197/30/202010/11/202012-14 weeksLow Volume Pain Build Out is 6/11/2020.
4500/5500 Chassis Cabs05/06/202010/08/201910/19/201910/03/201911/25/20197/30/202010/11/202012-14 weeksLow Volume Pain Build Out is 6/11/2020.
ProMaster05/06/202006/06/201906/21/201906/11/201909/30/2019CLOSED8/22/202022-24 weeks
ProMaster City05/06/202006/06/201905/27/201906/11/201907/29/20195/28/20208/1/202018-20 weeks
ModelLast UpdatedOrder Banks OpenETA for Data Available to OrderPricing Release DateStart of ProductionLast Date to Submit Orders to MerchantsBuild Out DateAverage Lead TimeImportant Updates

>> Back to Top

Subaru

ModelLast UpdatedOrder Banks OpenETA for Data Available to OrderPricing Release DateStart of ProductionLast Date to Submit Orders to MerchantsBuild Out DateAverage Lead TimeImportant Updates
Ascent06/25/202005/16/2019TBD05/16/201907/01/2019CLOSEDCLOSED14 - 16 weeksOrders placed between Build out and last date to submit will be on a will try only basis
BRZ06/25/202008/16/2019TBD08/15/2019N/AN/A14 - 16 weeksno 2021 model
Crosstrek06/25/202010/01/201910/31/201910/03/201912/01/2019CLOSEDCLOSED14 - 16 weeksOrders placed between Build out and last date to submit will be on a will try only basis
Legacy06/25/202007/15/2019TBD07/11/201911/01/2019CLOSED7/21/202014 - 16 weeksOrders placed between Build out and last date to submit will be on a will try only basis
Forester06/25/202008/27/2019TBD08/29/201910/01/2019CLOSED7/21/202014 - 16 weeksOrders placed between Build out and last date to submit will be on a will try only basis
Impreza06/25/202010/01/201910/19/201910/03/201911/01/2019CLOSED7/21/202014 - 16 weeksOrders placed between Build out and last date to submit will be on a will try only basis
Outback06/25/202007/15/2019TBD07/11/201911/01/2019CLOSED7/21/202014 - 16 weeksOrders placed between Build out and last date to submit will be on a will try only basis
WRX/STi06/25/202008/15/2019TBD05/15/201910/01/201911/1/202012/31/202014 - 16 weeksOrders placed between Build out and last date to submit will be on a will try only basis
ModelLast UpdatedOrder Banks OpenETA for Data Available to OrderPricing Release DateStart of ProductionLast Date to Submit Orders to MerchantsBuild Out DateAverage Lead TimeImportant Updates

>> Back to Top

Toyota

ModelLast UpdatedOrder Banks OpenETA for Data Available to OrderPricing Release DateStart of ProductionLast Date to Submit Orders to MerchantsBuild Out DateAverage Lead TimeImportant Updates
4Runner02/11/202006/10/20195/31/2019TBD08/29/201904/24/202005/08/202017-19 weeks
Avalon02/11/202005/10/20195/3/2019TBD07/30/201904/03/202004/10/20208-12 weeks
Avalon Hybrid02/11/202005/10/20195/3/2019TBD07/30/201904/03/202004/10/20208-12 weeks
Camry02/11/202006/10/20195/31/2019TBD08/29/201906/03/202006/10/20208-12 weeks
Camry Hybrid02/11/202006/10/20195/31/2019TBD08/29/201906/03/202006/10/20208-12 weeks
C-HR02/11/202008/12/20197/6/2019TBD10/30/201905/04/202005/11/2020 
Corolla02/11/202012/15/201812/4/20182/27/201903/29/201901/03/202001/10/20208-15 weeks
Corolla Hybrid02/11/202001/10/201901/03/202001/10/2020
Corolla Hatchback02/11/202007/10/20197/5/2019TBD09/30/201903/04/202003/11/202012-16 weeks
Highlander Gas02/11/202009/10/201910/28/201912/13/201911/29/201906/03/202006/10/202010-12 weeks
Highlander Hybrid02/11/202011/11/201910/28/201912/13/201901/31/202006/03/202006/10/2020 
Land Cruiser02/11/202006/10/2019TBDTBD08/29/201903/04/202003/11/202012-16 weeks
Mirai (fuel cell)02/11/202009/10/2019TBDTBD11/29/201908/04/202008/11/2020 
Prius02/11/202006/10/2019TBDTBD08/29/201904/03/202004/10/202016-20 weeks
Prius Prime02/11/202003/12/20193/5/2019TBD05/31/201904/03/202004/09/202016-20 weeks
RAV410/15/190806/10/20195/30/2019TBD08/29/201905/04/202005/11/20208-12 weeks
RAV4 Hybrid03/11/202006/10/2019TBDTBD08/29/201905/11/20208-12 weeks3/11/2020 = current fleet demand for RAV4 Hybrid is outpacing supply. In order to fulfill current MY20 orders and meet delivery expectations, Toyota Fleet has suspended RAV4 Hybrid orders as of March 11, 2020 for MY20
Sequoia02/11/202005/10/2019TBDTBD07/30/201904/03/202004/10/202016-20 weeks
Sienna03/11/202001/03/20191/31/2019TBD03/29/201903/11/20208-10 weeks3/11/2020 = Due to build out restrictions for MY20 Sienna, the last order date is being moved from 4/10/2020 to 03/11/
Supra02/11/202001/10/2019TBDTBD03/29/201912/03/201912/10/2019 
Tacoma02/11/202006/10/2019TBDTBD08/29/201905/04/202005/11/202016-20 weeks
Tundra02/11/202005/11/20195/9/2018TBD07/30/201904/03/202004/10/20208-16 weeks
Yaris Sedan/Hatchback02/11/202005/11/20195/3/2019TBD07/31/201904/03/202004/10/202012-16 weeks
ModelLast UpdatedOrder Banks OpenETA for Data Available to OrderPricing Release DateStart of ProductionLast Date to Submit Orders to MerchantsBuild Out DateAverage Lead TimeImportant Updates

>> Back to Top

Volkswagen

ModelLast UpdatedOrder Banks OpenETA for Data Available to OrderPricing Release DateStart of ProductionLast Date to Submit Orders to MerchantsBuild Out DateAverage Lead Time/Order to Dealer DeliveryImportant Updates
Arteon07/15/2020TBDTBDTBD01/06/2020CLOSEDCLOSED11/12/2020 
Atlas07/15/2020TBDTBDTBD12/16/2019CLOSEDCLOSED11/02/20203.6L engine starts production January 20, 2020. 
Atlas Cross Sport07/15/20201/17/20201/24/2020TBD01/06/20207/22/2020CLOSED11/02/2020 
eGolf07/15/2020TBDTBDTBD10/28/2019TBDCLOSED11/12/2020 
Golf07/15/202012/16/2019TBDTBD12/16/2019CLOSEDCLOSED11/12/2020 
GTI07/15/202012/16/2019TBDTBD10/28/2019CLOSEDCLOSED11/12/2020 
Jetta 1.4T/GLI07/15/20201/17/2020TBDTBD10/28/20197/20/2020CLOSED11/12/2020 
Passat07/15/202012/2/2019TBDTBD09/04/20197/22/2020CLOSED11/02/20201.4 & GLI
Tiguan07/15/20207/31/201910/15/2019TBD08/19/2019CLOSEDCLOSED11/12/2020 
ModelLast UpdatedOrder Banks OpenETA for Data Available to OrderPricing Release DateStart of ProductionLast Date to Submit Orders to MerchantsBuild Out DateAverage Lead Time/Order to Dealer DeliveryImportant Updates

>> Back to Top

Volvo

ModelLast UpdatedOrder Banks OpenETA for Data Available to OrderPricing Release DateStart of ProductionLast Date to Submit Orders to MerchantsBuild Out DateAverage Lead TimeImportant Updates
S6001/27/20204/15/2019TBDTBD5/15/2019TBDTBD12-16 weeks
S9001/27/2020TBDTBDTBD5/15/2019TBDTBD18-20 weeks
V6001/27/20204/15/2019TBDTBD5/15/2019TBDTBD12-16 weeks
V9001/27/20204/15/2019TBDTBD5/15/2019TBDTBD12-16 weeks
XC4001/27/20204/1/2019TBDTBD4/22/2019TBDTBD12-16 weeks
XC6001/27/20204/15/2019TBDTBD5/15/2019TBDTBD12-16 weeks
XC9001/27/20204/15/2019TBDTBD5/15/2019TBDTBD12-16 weeks
ModelLast UpdatedOrder Banks OpenETA for Data Available to OrderPricing Release DateStart of ProductionLast Date to Submit Orders to MerchantsBuild Out DateAverage Lead TimeImportant Updates

>> Back to Top