OEM Updates, All in One Place

Manufacturers’ Information

Manufacturers’ Build-out and Start-up Dates for 2020

Find valuable build out and order bank information on popular fleet vehicles, consolidated into one easy to navigate location. Below you can click through any of the various manufacturers’ build-out and start-up dates for US cars and US trucks. Please be aware these dates change regularly.

Quick Menu: 2021 Build-outs | 2020 Fleet Incentives

Select a Manufacturer:

Audi | Buick | Cadillac | Chevrolet | Chrysler | Dodge | Ford | GMC | Hyundai | Infinity | Jeep | Lincoln | Mazda | Mercedes | Nissan | RAM | Subaru | Toyota | Volkswagen | Volvo

Audi

Model Last Updated Order Banks Open ETA for Data Available to Order Pricing Release Date Start of Production Last Date to Submit Orders to Merchants Build Out Date Average Lead Time Important Updates
A3/S3 01/27/2020 5/31/2019 05/31/2019 8/12/2019 5/1/2019 TBD TBD 14-16 weeks
A4/S4 05/29/2020 5/31/2019 11/22/2019 12/23/2019 8/1/2019 TBD March 2020 14-16 weeks
A5/S5 05/29/2020 6/28/2019 11/25/2019 TBD 9/1/2019 TBD March 2020 14-16 weeks
A6/S6/RS6 05/29/2020 5/31/2019 06/21/2019 8/9/2019 5/1/2019 TBD March 2020 14-16 weeks
A7/S7/RS7 05/29/2020 5/31/2019 05/31/2019 8/9/2019 10/1/2019 TBD March 2020 14-16 weeks
A8/S8 05/29/2020 5/31/2019 05/29/2019 TBD 5/1/2019 TBD March 2020 14-16 weeks
e-tron quattro/sportback 05/29/2020 TBD
Q3 05/29/2020 5/31/2019 06/21/2019 TBD 5/1/2019 TBD March 2020 14-16 weeks
Q5 05/29/2020 5/31/2019 05/31/2019 8/9/2019 5/1/2019 TBD March 2020 12-14 weeks
Q7/SQ7 05/29/2020 8/30/2019 11/22/2019 12/18/2019 8/1/2019 TBD March 2020 14-16 weeks
Q8/SQ8/R8/RSQ8 05/29/2020 5/31/2019 05/31/2019 8/9/2019 5/1/2019 TBD March 2020 14-16 weeks
TT/TTS/TT RS 05/29/2020 5/31/2019 05/31/2019 8/9/2019 TBD TBD March 2020 14-16 weeks
Model Last Updated Order Banks Open ETA for Data Available to Order Pricing Release Date Start of Production Last Date to Submit Orders to Merchants Build Out Date Average Lead Time Important Updates

>> Back to Top

Buick

Model Last Updated Order Banks Open ETA for Data Available to Order Pricing Release Date Start of Production Last Date to Submit Orders to Merchants Build Out Date Average Lead Time Important Updates
Encore 06/03/2020 4/25/2019 5/7/2019 6/27/2019 7/1/2019 CLOSED 5/29/2020 24-26 weeks
Encore GX 06/03/2020         CLOSED 7/17/2020  
Envision 06/03/2020 1/31/2019 2/12/2019 5/7/2019 5/6/2019 CLOSED 8/28/2020 21-23 weeks
Enclave 07/23/2020 4/25/2019 5/7/2019 6/10/2019 6/17/2019 6/12/2020 10/9/2020 9-11 weeks Buildout in process
Regal (Sportback/TourX) 06/03/2020 4/25/2019 TBD TBD 8/5/2019 CLOSED CLOSED 20-22 weeks
Model Last Updated Order Banks Open ETA for Data Available to Order Pricing Release Date Start of Production Last Date to Submit Orders to Merchants Build Out Date Average Lead Time Important Updates

>> Back to Top

Cadillac

Model Last Updated Order Banks Open ETA for Data Available to Order Pricing Release Date Start of Production Last Date to Submit Orders to Merchants Build Out Date Average Lead Time Important Updates
CT4 06/03/2020 9/9/2019 9/16/2019 10/09/2019 8/30/2019 CLOSED 9/24/2020 8-10 weeks
CT5 06/03/2020 6/20/2019 7/2/2019 07/17/2019 8/30/2019 CLOSED 9/24/2020 8-10 weeks
CT6 06/03/2020 5/23/2019 5/21/2019 06/04/2019 8/5/2019 CLOSED CLOSED 9-11 weeks
Escalade/Escalade ESV 07/23/2020 5/9/2019 5/6/2019 05/24/2019 6/24/2019 CLOSED CLOSED 13-15 weeks
XT4 06/03/2020 4/25/2019 4/22/2019 05/24/2019 6/17/2019 CLOSED 8/26/2020 9-11 weeks
XT5 07/30/2020 6/6/2019 6/18/2019 07/09/2019 8/5/2019 CLOSED 8/21/2020 9-11 weeks
XT6 07/30/2020 2/28/2019 3/12/2019 04/08/2019 5/31/2019 CLOSED 8/21/2020 9-11 weeks
Model Last Updated Order Banks Open ETA for Data Available to Order Pricing Release Date Start of Production Last Date to Submit Orders to Merchants Build Out Date Average Lead Time Important Updates

>> Back to Top

Chevrolet

Model Last Updated Order Banks Open ETA for Data Available to Order Pricing Release Date Start of Production Last Date to Submit Orders to Merchants Build Out Date Average Lead Time Important Updates
Blazer 07/30/2020 6/20/2019 6/24/2019 9/5/2019 8/12/2019 CLOSED 8/15/2020 12-14 weeks
Bolt EV 08/14/2020 6/6/2019 8/21/2019 9/11/2019 7/31/2019 8/20/2020 8/27/2020 8-10 weeks
Camaro 07/30/2020 6/6/2019 TBD TBD 7/22/2019 CLOSED CLOSED 8-10 weeks
Corvette 07/23/2020         TBD Q4   Buildout in process
Colorado 07/30/2020 5/23/2019 5/27/2019 3/1/2019 7/15/2019 CLOSED CLOSED 13-15 weeks
Equinox 07/23/2020 4/25/2019 4/22/2019 5/24/2019 6/17/2019 CLOSED 9/18/2020 9-11 weeks Buildout in process
Express (Cargo/Cutaway/Pass) 07/23/2020 6/20/2019 6/26/2019 6/28/2019 8/19/2019 CLOSED 9/23/2020 25-27 weeks Buildout in process 2/21/20 - order cut off with GM moved up.
Impala 07/30/2020 5/23/2019 TBD 6/7/2019 8/19/2019 CLOSED CLOSED 10-12 weeks
LCF 3500/4500 Gas 06/03/2020 8/1/2019 10/15/2019 1/20/2020 10/15/2019 6/18/2020 10/30/2020  
LCF 4500/5500 HD/XD Diesel 06/03/2020 10/9/2018 TBD TBD 1/2/2019 CLOSED 12/31/2019  
LCF 6500 XD Diesel 06/03/2020 10/9/2018 TBD 2/7/2019 1/2/2019 CLOSED 3/31/2020  
Malibu 07/30/2020 4/25/2019 5/7/2019 5/8/2019 5/31/2019 CLOSED 9/1/2020 10-12 weeks
Silverado LD 1500 Regular 06/03/2020 5/9/2019 6/7/2019 5/22/2019 8/5/2019 CLOSED 9/18/2020 12-14 weeks 2/21/20 - order cut off with GM moved up.
Silverado LD 1500 Double 06/03/2020 5/9/2019 6/7/2019 5/22/2019 8/5/2019 CLOSED 9/11/2020 14-16 weeks 2/21/20 - order cut off with GM moved up.
Silverado LD 1500 Crew 06/03/2020 5/9/2019 6/7/2019 5/22/2019 8/5/2019 CLOSED 9/18/2020 12-14 weeks 2/21/20 - order cut off with GM moved up.
Silverado MD 2500/3500 Regular 06/03/2020 5/23/2019 3/11/2019 5/23/2019 8/30/2019 CLOSED 9/25/2020 13-15 weeks 2/21/20 - order cut off with GM moved up.
Silverado MD 2500/3500 Double 06/03/2020 7/18/2019 TBD 5/23/2019 1/6/2020 CLOSED 9/25/2020 13-15 weeks 2/21/20 - order cut off with GM moved up.
Silverado MD 2500/3500 Crew 06/03/2020 7/18/2019 TBD 5/23/2019 1/6/2020 CLOSED 9/25/2020 13-15 weeks
Silverado Medium Duty 06/03/2020 6/20/2019 6/11/2019 5/10/2019 9/30/2019 6/18/2020 11/27/2020 31-33 weeks 2/21/20 - order cut off with GM moved up.
Silverado 4500/5500/6500 06/03/2020 CLOSED 9/25/2020 31-33 weeks 2/21/20 - order cut off with GM moved up.
Sonic 07/30/2020 5/23/2019 6/5/2019 6/19/2019 7/31/2019 CLOSED 10/20/2020 22-24 weeks 2/21/20 - order cut off with GM moved up.
Spark 06/03/2020 3/28/2019 4/9/2019 4/11/2019 6/3/2019 CLOSED 5/29/2020 24-26 weeks
Suburban 07/30/2020 5/9/2019 5/21/2019 6/21/2019 6/24/2019 CLOSED 4/8/2020 13-15 weeks
Tahoe 06/03/2020 5/9/2019 5/21/2019 7/1/2019 6/24/2019 CLOSED 4/8/2020 13-15 weeks
Tahoe Police 06/03/2020 5/9/2019 5/21/2019 TBD 6/24/2019 CLOSED 4/8/2020 22-24 weeks
Traverse 07/23/2020 4/25/2019 4/25/2019 5/31/2019 6/17/2019 6/18/2020 10/9/2020 9-11 weeks Buildout in process
Trax 06/03/2020 4/25/2019 5/7/2019 6/26/2019 7/1/2019 CLOSED 8/31/2020 14-16 weeks
Model Last Updated Order Banks Open ETA for Data Available to Order Pricing Release Date Start of Production Last Date to Submit Orders to Merchants Build Out Date Average Lead Time Important Updates

>> Back to Top

Chrysler

Model Last Updated Order Banks Open ETA for Data Available to Order Pricing Release Date Start of Production Last Date to Submit Orders to Merchants Build Out Date Average Lead Time Important Updates
300 05/06/2020 11/05/2019 11/13/2019 11/05/2019 11/19/2019 8/27/2020 11/6/2020 8-10 weeks
Pacifica 05/06/2020 06/07/2019 08/12/2019 07/25/2019 08/13/2019 8/27/2020 10/30/2020 8-10 weeks
Voyager 05/06/2020 06/12/2019 07/08/2019 07/03/2019 08/12/2019 8/27/2020 10/30/2020 8-10 weeks
Model Last Updated Order Banks Open ETA for Data Available to Order Pricing Release Date Start of Production Last Date to Submit Orders to Merchants Build Out Date Average Lead Time Important Updates

>> Back to Top

Dodge

Model Last Updated Order Banks Open ETA for Data Available to Order Pricing Release Date Start of Production Last Date to Submit Orders to Merchants Build Out Date Average Lead Time Important Updates
Challenger 5/6/2020 11/5/2019 11/20/2019 11/5/2019 11/18/2019 8/27/2020 11/6/2020 8-10 weeks  
Charger 5/6/2020 11/5/2019 11/7/2019 11/5/2019 11/18/2019 8/27/2020 11/6/2020 8-10 weeks  
Durango 6/25/2020 6/6/2019 7/23/2019 7/2/2019 07/29/2019 6/18/2020 9/12/2020 8-10 weeks  
Grand Caravan 5/6/2020 12/17/2019 12/30/2019 12/17/2019 01/02/2020 CLOSED 8/21/2020 8-10 weeks 2020MY is the final production year. Not available in the following states due to EPA regulations: CA, CT, DE, ME, MD, MA, NJ, NY, OR, PA, RI, VT & WA
Journey 5/6/2020 12/11/2019 12/26/2019 12/11/2019 01/13/2020 10/1/2020 12/23/2020 10-12 weeks N/A for sale in California Emission States (CA & CT)
Model Last Updated Order Banks Open ETA for Data Available to Order Pricing Release Date Start of Production Last Date to Submit Orders to Merchants Build Out Date Average Lead Time Important Updates

>> Back to Top

Ford

Model Last Updated Order Banks Open ETA for Data Available to Order Pricing Release Date Start of Production Last Date to Submit Orders to Merchants Build Out Date Average Lead Time Important Updates
Econoline 2/11/2020 N/A N/A N/A N/A N/A N/A Skipped Model Year 2020.
Ecosport 8/3/2020 4/1/2019 4/11/2019 3/26/2019 07/01/2019 2/21/2020 8/31/2020 20-22 weeks  
Edge 8/3/2020 7/15/2019 7/30/2019 7/14/2019 09/30/2019 9/25/2020 12/23/2020 14-16 weeks 5/18/2020 - Oakville Assembly plant opening 5/25/2020
Escape 8/3/2020 5/12/2019 5/22/2019 5/15/2019 08/19/2019 9/25/2020 12/23/2020 14-16 weeks Job 1 order banks converted to Job 3 1/10/20. Exterior color Sedona Orange early cut off - 1/10/2020; PHEV order banks open 12/20/19. 2/17/20 - PHEV(plug in) NOT available until MAY 2020 Early balance out (PBP)-Sedona Orange – 2/3/2020 5/18/2020 - Louisville Assmebly plant opening May 18th, 2020
Expedition 5/18/2020 7/17/2019 8/1/2019 TBD 10/14/2019 TBD TBD 10-12 weeks 5/18/2020 - Kentucky Truck plant opening 5/18/2020
Explorer (Retail/Fleet/Police) 8/3/2020 1/21/2019 1/31/2019 2/8/2019 05/06/2019 CLOSED 9/23/2020 22-24 weeks Lead time for Explorer police is 10-18 weeks. 2/17/20 - Early balance out paints 4/24/2020 last production F.O.D.D. 2/14/2020 (B6)-Rich Copper PN4GJ (FT)-Blue Metallic PN4FT (BN)-Silver Spruce PN4GN (FT)-Blue Metallic PN4FT POLICE - Scheduling for LPO (limited paint) is TBD: Sterling Gray Metallic(UJ)(PN3KD), Kodiak Brown(J1)(PNBAB), Norcea Blue Pearl(KR)(PN3CH), Smokestone (HG) (PN3FF), Med Brown Metallic(BU)(PNBBB), Dark Toreador(JL)(PNEVA), Vermilion Solid C/C (E4)(PNEGC), Silver Gray Met(TN)(PNMND), Med Titanium C/C(YG)(PNYAF)C/C(JL)(PNEVA),Dark Blue Solid(LK)(PNKSA), 4/21/2020 - updated build out date per Ford schedule. Early balance out paints (B6)-Rich Copper PN4GJ (FT)-Blue Metallic PN4FT (BN)-Silver Spruce PN4GN (J7)-Magnetic PN4DQ 5/18/2020 - Chicago Assembly Plant opening 5/18/2020
F150 5/18/2020 7/15/2019 7/25/2019 7/15/2019 10/07/2019 5/22/2020 5/29/2020 12-14 weeks Kansas City plant start of production is 11/4/19; Police model start of production is 11/4/19 2/17/20 Pls note: Restricted paint (LPO) will be scheduled in batches and may result in a scheduling delay of 6 or more weeks. - Green (PN4GW), Orange (PN4GX), Vermillion Red (PNEGC), Yellow (PN4GY), School Bus Yellow (PNAHF. NO LPO PRODUCTION 3/16/20 – 4/05/20. 3.0L Diesel Engine (991) - delay 4/21/2020 - updated build out date per Ford schedule. F150 leadtime now 16-18 weeks. Early balance out LPO – 7/12/20 Pls note: Restricted paint (LPO) will be scheduled in batches and may result in a scheduling delay of 6 or more weeks. - Green (PN4GW), Orange (PN4GX), Vermillion Red (PNEGC), Yellow (PN4GY), School Bus Yellow (PNAHF). 3.0L Diesel Engine (991) - delay 5/18/2020 - Dearborn/Kansas City plants opening 5/18/2020. 2020MY F150 Order / Production Status:_x000D_ • All 2020MY F-150 orders currently in the Unscheduled Order Bank (USOB) will be produced (i.e. we will build everything currently in our order bank)_x000D_ • We’ve requested additional allocation to build 100% of Fleet Orders received by 5/29 (FODD)_x000D_ • FINAL ORDER DUE DATE for 2020 F-150 is 5/29 _x000D_ _x000D_ Production Restart _x000D_ • Both DTP and KCAP resume production 5/18_x000D_ • Both plants currently have “scheduled” production through the week of 6/22 _x000D_ • Orders previewing to schedule this week are for the week of 7/6 production (some of these orders might pull into June)_x000D_ • Remaining orders currently in the USOB will fill fleet allocation through July production_x000D_ _x000D_ Additional 2020 Orders_x000D_ • New 2020 F-150 orders placed by 5/29 will begin filling August production, and go through balance out production:_x000D_ • 20MY Job last at DTP is 9/6 and KCAP is 10/11_x000D_ • 21MY Job 1 date at DTP is 10/12 and KCAP is 11/9_x000D_ • 21MY USOB opens 7/15, and scheduling begins in August for Job 1 production_x000D_ _x000D_ Message to customers: _x000D_ Customers requiring F-150 deliveries mid-summer through mid-December should place 20MY orders before 5/29 FODD_x000D_
Fusion 8/3/2020 5/13/2019 5/21/2019 5/12/2019 08/05/2019 2/21/2020 7/31/2020 14-16 weeks 2020 is final production year. 2/17/20 - Early balance out paints – 5/2/2020 Final orders due to plant on 2/20/2020 (E7) Velocity Blue PN4GL (D4) Lucid Red PN4HQ 5/18/2020 - Hermosillo plant openeing 5/18/2020
Motorhome 2/11/2020 9/16/2019 TBD TBD 01/06/2020 TBD TBD 18-20 weeks  
Mustang 8/3/2020 5/13/2019 5/24/2019 5/8/2019 08/26/2019 9/25/2020 12/23/2020 12-14 weeks 5/18/2020 - Cuautitian plant (Mustang Mach-E) opening 5/18/2020 Flat Rock plant (Mustang/Shelby) opening 5/25/2020
Ranger 8/3/2020 8/12/2019 9/3/2019 8/12/2019 11/18/2019 9/25/2020 12/23/2020 14-16 weeks 2/17/20 - Fleet order type with 58B (MO Cluster and Mechless Radio) – 1/13/2020 est. Stop Build lifted, scheduling for 3/2/2020 Early balance out paint – (GU) Saber (PN4GB) 5/18/2020 - Michigan plant opening 5/18/2020
Super Duty 5/18/2020       TBD TBD 2/17/20 - SUPER DUTY D2 TBD C3–3/16 KTP: 6/29, 7/6 OHAP: 6/29 10-12 weeks 40 gallon fuel tank – 4 to 6 week additional delay. Gaseous Fuel Prep (98G) & Gaseous Fuel Prep Pkg #2 (98F) – 3/30/20 (KTP), 4/20/20 (OHAP) OHAP only F600 (F6K, F6L) Order Bank open – 3/2/2020 Job #1 – Estimated June 1 OK to Buy – Estimated Mid-June OHAP only 102” Exterior Mirror – estimated MP2 6/1/2020. OHAP only AFT-Axle Frame Extension – option 63C Silver Spruce Paint (BN) – production begins 3/20/30 MP2 Pls note: Restricted paint will be scheduled in batches and may result in a scheduling delay of 6 or more weeks. Green (PN4GW), Orange (PN4GX), Vermillion Red (PNEGC), Yellow (PN4GY), School Bus Yellow (PNAHF), Green Gem (PN4DA). Pacific Gas/Electric Blue (PN4GC) SUPER DUTY ***ATTENTION**** Attention needed, please review your F450/F550 XLT Reg Chassis Cab 4x2 orders for options that appear to be unscheduled/clean but are not being selected for scheduling. Review the list of options below that are currently not buildable with F450/F550 XLT Reg Chassis Cab 4x2. Adjustments to the orders are required for scheduling. 5/18/2020 - Kentucky Truck plant opening 5/18/2020
Transit 150-250-350 8/3/2020 7/15/2019 8/1/2019 8/5/2019 10/21/2019 9/25/2020 12/23/2020 16-18 weeks Transit VSO order banks opened 8/26/19; start of production is 12/16/19. 5/18/2020 - Kansas City plant opening 5/18/2020
Transit Connect 5/18/2020 2/10/2019 2/28/2019 2/11/2019 05/05/2019 1/24/2020 1/31/2020 20-22 weeks _x000D_ 5/18/2020 - Kansas City plant opening 5/18/2020
Model Last Updated Order Banks Open ETA for Data Available to Order Pricing Release Date Start of Production Last Date to Submit Orders to Merchants Build Out Date Average Lead Time Important Updates

>> Back to Top

GMC

Model Last Updated Order Banks Open ETA for Data Available to Order Pricing Release Date Start of Production Last Date to Submit Orders to Merchants Build Out Date Average Lead Time Important Updates
Acadia 06/03/2020 06/06/2019 6/18/2019 6/3/2019 8/5/2019 CLOSED 8/14/2020 9-11 weeks  
Canyon 06/03/2020 05/23/2019 6/5/2019 3/1/2019 7/15/2019 CLOSED 6/26/2020 13-15 weeks  
Savana (Cargo/Cutaway/Pass) 06/03/2020 06/20/2019 6/26/2019 TBD 8/19/2019 CLOSED 9/23/2020 23-25 weeks 2/21/20 = GM pulled up order cut off.
Sierra 1500 Regular 06/03/2020 05/09/2019 6/3/2019 5/17/2019 8/5/2019 CLOSED 9/18/2020 12-14 weeks 2/21/20 = GM pulled up order cut off.
Sierra 1500 Double 06/03/2020 05/09/2019 6/3/2019 5/17/2019 8/5/2019 CLOSED 9/11/2020 14-16 weeks 2/21/20 = GM pulled up order cut off.
Sierra 1500 Crew 06/03/2020 05/09/2019 6/3/2019 5/17/2019 8/5/2019 CLOSED 9/18/2020 12-14 weeks 2/21/20 = GM pulled up order cut off.
Sierra 2500/3500 Regular 06/03/2020 05/23/2019 3/26/2019 5/23/2019 8/30/2019 CLOSED 9/25/2020 13-15 weeks Diesel engine order banks open 10/10/19; start of production is in December.
Sierra 2500/3500 Double 06/03/2020 07/18/2019 TBD 5/23/2019 1/6/2020 CLOSED 9/25/2020 13-15 weeks 2/21/20 = GM pulled up order cut off.
Sierra 2500/3500 Crew 06/03/2020 07/18/2019 TBD 5/23/2019 1/6/2020 CLOSED 9/25/2020 13-15 weeks 2/21/20 = GM pulled up order cut off.
Terrain 07/23/2020 04/25/2019 5/3/2019 5/24/2019 6/17/2019 CLOSED 9/18/2020 9-11 weeks Buildout in process
Yukon 06/03/2020 05/09/2019 5/10/2019 6/7/2019 6/24/2019 CLOSED 4/8/2020 13-15 weeks  
Yukon XL 06/03/2020 05/09/2019 5/10/2019 5/14/2019 6/24/2019 CLOSED 4/8/2020 13-15 weeks  
Model Last Updated Order Banks Open ETA for Data Available to Order Pricing Release Date Start of Production Last Date to Submit Orders to Merchants Build Out Date Average Lead Time Important Updates

>> Back to Top

Hyundai

Model Last Updated Order Banks Open ETA for Data Available to Order Pricing Release Date Start of Production Last Date to Submit Orders to Merchants Build Out Date Average Lead Time Important Updates
Accent 05/01/2020 3/31/2019 TBD TBD 5/31/2019 2/18/2020 5/1/2020 12-16 weeks
Elantra 05/01/2020 3/31/2019 TBD TBD 5/22/2019 4/13/2020 7/1/2020 12-16 weeks
Elantra GT 05/01/2020 3/31/2019 TBD TBD 5/22/2019 4/13/2020 6/1/2020 12-16 weeks
Ioniq EV 05/01/2020 8/31/2019 TBD TBD 10/31/2019 4/13/2020 7/1/2020 12-16 weeks
Ioniq HEV/PHEV 05/01/2020 7/31/2019 TBD TBD 9/30/2019 4/13/2020 7/1/2020 12-16 weeks
Kona 05/01/2020 4/30/2019 TBD TBD 6/30/2019 2/18/2020 5/1/2020 12-16 weeks
Palisade 05/01/2020 6/30/2019 TBD TBD 6/30/2019 2/18/2020 5/1/2020 12-16 weeks
Santa Fe 05/01/2020 4/30/2019 TBD TBD 6/30/2019 6/15/2020 9/1/2020 12-16 weeks
Sonata Gas 05/01/2020 9/30/2019 TBD TBD 11/30/2019 3/13/2020 6/1/2020 12-16 weeks
Sonata HEV 05/01/2020 9/30/2019 TBD TBD 11/30/2019 3/13/2020 6/1/2020 12-16 weeks
Tucson 05/01/2020 5/31/2019 TBD TBD 7/31/2019 2/18/2020 5/1/2020 12-16 weeks
Veloster 05/01/2020 2/28/2019 TBD TBD 4/30/2019 11/2/2019 3/1/2020 12-16 weeks
Venue 05/01/2020 7/31/2019 TBD TBD 9/30/2019 3/13/2020 6/1/2020 12-16 weeks
Model Last Updated Order Banks Open ETA for Data Available to Order Pricing Release Date Start of Production Last Date to Submit Orders to Merchants Build Out Date Average Lead Time Important Updates

>> Back to Top

Infinity

Model Last Updated Order Banks Open ETA for Data Available to Order Pricing Release Date Start of Production Last Date to Submit Orders to Merchants Build Out Date Average Lead Time Important Updates
Q50 01/27/2020 3/16/2019 04/02/2019 9/18/2019 8/2/2019 2/21/2020 2/28/2020 16-24 weeks
Q60 01/27/2020 3/16/2019 04/02/2019 9/18/2019 8/2/2019 3/24/2020 3/31/2020 16-24 weeks
QX50 02/03/2020 4/16/2019 04/02/2019 9/18/2019 8/2/2019 1/24/2020 2/1/2020 16-20 weeks
QX80 01/27/2020 5/16/2019 05/09/2019 ######## 10/2/2019 ######## ######## 16-24 weeks
Model Last Updated Order Banks Open ETA for Data Available to Order Pricing Release Date Start of Production Last Date to Submit Orders to Merchants Build Out Date Average Lead Time Important Updates

>> Back to Top

Jeep

Model Last Updated Order Banks Open ETA for Data Available to Order Pricing Release Date Start of Production Last Date to Submit Orders to Merchants Build Out Date Average Lead Time Important Updates
Cherokee 05/06/2020 6/7/2019 07/06/2019 6/21/2019 4/29/2019 5/28/2020 8/28/2020 8-10 weeks
Grand Cherokee 06/25/2020 6/7/2019 06/26/2019 6/21/2019 7/30/2019 6/18/2020 9/12/2020 8-10 weeks
Compass 05/06/2020 6/12/2019 07/04/2019 6/21/2019 5/29/2020 4/30/2020 7/4/2020 10-12 weeks
Gladiator 05/06/2020 4/10/2019 04/09/2019 4/8/2019 3/25/2019 5/28/2020 8/21/2020 10-12 weeks
Renegade 05/06/2020 6/6/2019 07/04/2019 6/18/2019 7/29/2019 TBD TBD 8-10 weeks
Wrangler 05/06/2020 6/7/2019 07/23/2019 7/2/2019 7/23/2019 5/28/2020 8/7/2020 8-10 weeks
Model Last Updated Order Banks Open ETA for Data Available to Order Pricing Release Date Start of Production Last Date to Submit Orders to Merchants Build Out Date Average Lead Time Important Updates

>> Back to Top

Lincoln

Model Last Updated Order Banks Open ETA for Data Available to Order Pricing Release Date Start of Production Last Date to Submit Orders to Merchants Build Out Date Average Lead Time Important Updates
Aviator 08/03/2020 1/21/2019 2/6/2019 01/22/2019 5/6/2019 CLOSED 9/23/2020 12-14 weeks PHEV n/a until July 2/17/20 Early balance out paints 4/24/2020 last production F.O.D.D. 02/14/2020 (B6)-Crystal Copper PN4GJ (FT)- Blue Diamond PN4FT 4/21/20 - change balance out date per Ford schedule
Continental 02/11/2020 7/17/2019 8/13/2019 07/16/2019 10/21/2019 TBD TBD 14-16 weeks  
Corsair 04/21/2020 5/16/2019 6/3/2019 06/24/2019 8/19/2019 CLOSED 4/3/2020 ` 2/17/20 Removed option 64D (20x8” cast alum prem painted wheel) with 86D (locking wheel lug nut) option from 2020MY. 4/21/20 - change balance out date per Ford schedule
MKZ 02/17/2020 5/13/2019 5/28/2019 06/09/2019 8/4/2019 2/21/2020 2/28/2020 10-12 weeks 2020 is final production year 2/1/7/20 Early balance out paints – 5/2/2020_x000D_ Final orders due to plant on 2/20/2020_x000D_ (GS) Ceramic Pearl PN4GT_x000D_ (N5) Rhapsody Blue PN4EZ_x000D_ (D4) Red Carpet TC PN4HQ_x000D_
Nautilius 08/03/2020 7/15/2019 8/30/2019 08/13/2019 9/30/2019 9/25/2020 12/23/2020 10-12 weeks  
Navigator 02/11/2020 7/16/2019 8/7/2019 07/17/2019 10/13/2019 TBD TBD 12-14 weeks  
Model Last Updated Order Banks Open ETA for Data Available to Order Pricing Release Date Start of Production Last Date to Submit Orders to Merchants Build Out Date Average Lead Time Important Updates

>> Back to Top

Mazda

Model Last Updated Order Banks Open ETA for Data Available to Order Pricing Release Date Start of Production Last Date to Submit Orders to Merchants Build Out Date Average Lead Time Important Updates
CX3 01/27/2020 9/3/2019 ######## ######## 11/1/2019 TBD TBD 12-16 weeks
CX30 01/27/2020 9/30/2019 ######## ######## ######## TBD TBD 12-16 weeks
CX5 01/27/2020 7/29/2019 TBD TBD 10/1/2019 TBD TBD 12-16 weeks
CX9 01/27/2020 7/29/2019 11/6/2019 TBD 10/1/2019 TBD TBD 12-16 weeks
Mazda3 5 Door 01/27/2020 6/3/2019 10/7/2019 TBD 7/31/2019 TBD TBD 12-16 weeks
Mazda3 Sedan 01/27/2020 6/3/2019 10/7/2019 TBD 7/31/2019 TBD TBD 12-16 weeks
Mazda6 01/27/2020 7/29/2019 11/1/2019 TBD 10/1/2019 TBD TBD 12-16 weeks
MX-5 Miata 01/27/2020 9/30/2019 TBD TBD ######## TBD TBD 12-16 weeks
MX-RF Miata 01/27/2020 9/30/2019 TBD TBD ######## TBD TBD 12-16 weeks
Model Last Updated Order Banks Open ETA for Data Available to Order Pricing Release Date Start of Production Last Date to Submit Orders to Merchants Build Out Date Average Lead Time Important Updates

>> Back to Top

Mercedes

Model Last Updated Order Banks Open ETA for Data Available to Order Pricing Release Date Start of Production Last Date to Submit Orders to Merchants Build Out Date Average Lead Time Important Updates
C-Cab 3/11/2020 4/30/2019 7/1/2019 TBD 6/29/2019 CLOSED 1/1/2020 16-18 weeks
C-Coupe 3/11/2020 4/30/2019 7/1/2019 TBD 6/29/2019 CLOSED 1/1/2020 16-18 weeks
CLA 3/11/2020 5/31/2019 8/22/2019 TBD 9/1/2019 CLOSED 1/1/2020 16-18 weeks
CLS 3/11/2020 4/30/2019 10/29/2019 TBD 8/1/2019 CLOSED 2/1/2020 16-18 weeks
C-Sedan 3/11/2020 4/30/2019 7/1/2019 TBD 6/29/2019 CLOSED 2/1/2020 16-18 weeks
E-Cab 3/11/2020 4/30/2019 5/27/2019 TBD 6/29/2019 CLOSED 3/1/2020 14-16 weeks
E-Coupe 3/11/2020 4/30/2019 5/27/2019 TBD 8/1/2019 CLOSED 3/1/2020 14-16 weeks
E-Sedan 3/11/2020 4/30/2019 5/27/2019 TBD 8/1/2019 CLOSED 1/1/2020 14-16 weeks
E-Wagon 3/11/2020 4/30/2019 5/27/2019 TBD 8/1/2019 CLOSED 1/1/2020 14-16 weeks
G 3/11/2020 6/28/2019 TBD TBD 10/1/2019 3/25/2020 4/1/2020 14-16 weeks
GLA 3/11/2020 4/30/2019 5/13/2019 TBD 6/29/2019 CLOSED 1/1/2020 14-16 weeks
GLB 3/11/2020 5/31/2019 10/18/2019 TBD 8/1/2019 CLOSED 1/1/2020 14-16 weeks
GLC - SUV 3/11/2020 3/29/2019 6/20/2019 TBD 9/3/2019 3/25/2020 4/1/2020 14-16 weeks W series only
GLC - Coupe 3/11/2020 3/29/2019 6/20/2019 TBD 9/3/2019 CLOSED 1/1/2020 14-16 weeks
GLE - SUV 3/11/2020 4/1/2019 2/6/2019 TBD 7/2/2019 CLOSED 3/1/2020 14-16 weeks
GLE - Coupe 3/11/2020 4/1/2019 2/6/2019 TBD 7/2/2019 Submit orders to Merchants 5 days prior to Build Out See important update column 14-16 weeks GLE53C4 - B/O 8/1/2020 GLE63C4S - B/O 1/1/2020
GLS 3/11/2020 4/1/2019 9/27/2019 TBD 11/2/2019 CLOSED 2/1/2020 14-16 weeks
GT - Coupe 3/11/2020 unknwn 7/16/2019 TBD 2/1/2019 CLOSED 2/1/2020 14-16 weeks
GT - Roadster 3/11/2020 unknwn 7/16/2019 TBD 2/1/2019 CLOSED 2/1/2020 14-16 weeks
GT - 4dr Coupe 3/11/2020 unknwn 7/16/2019 TBD 2/1/2019 CLOSED 2/1/2020 14-16 weeks
Maybach 3/11/2020 4/1/2019 8/13/2019 TBD 9/3/2019 CLOSED 12/1/2019 14-16 weeks
Metris 7/15/2020 4/16/2019 6/4/2019 TBD 6/29/2019 CLOSED 9/1/2020 18-22 weeks
S-Sedan 3/11/2020 4/1/2019 7/16/2019 TBD 6/29/2019 4/24/2020 5/1/2020 14-16 weeks
S-Coupe 3/11/2020 4/1/2019 7/16/2019 TBD 6/29/2019 CLOSED 2/1/2020 14-16 weeks
S-Cab 3/11/2020 4/1/2019 7/16/2019 TBD 6/29/2019 CLOSED 2/1/2020 14-16 weeks
Sprinter 7/15/2020 4/16/2019 6/4/2019 TBD 6/29/2019 7/16/2020 12/1/2020 20-22 weeks 7/15/2020= order cut off of July 16th includes; Sprinter Cargo, Passenger, Crew and Cab/Chassis
Model Last Updated Order Banks Open ETA for Data Available to Order Pricing Release Date Start of Production Last Date to Submit Orders to Merchants Build Out Date Average Lead Time Important Updates

>> Back to Top

Nissan

Model Last Updated Order Banks Open ETA for Data Available to Order Pricing Release Date Start of Production Last Date to Submit Orders to Merchants Build Out Date Average Lead Time Important Updates
Frontier 6/30/2020 1/15/2020 1/15/2020 TBD 04/01/2020 TBD TBD 16-20 weeks
Altima Sedan 6/30/2020 3/1/2019 3/1/2019 TBD 06/03/2019 2/21/2020 3/1/2020 12-16 weeks
Arada 6/30/2020 3/15/2020 3/15/2020 TBD 06/03/2019 COMPLETE 7/1/2020
Kicks 6/30/2020 7/15/2019 7/25/2019 12/3/2019 11/01/2019 TBD 6/1/2020 16-20 weeks
Leaf 6/30/2020 8/15/2019 6/19/2019 TBD 12/02/2019 COMPLETE 5/1/2020 16-20 weeks
Maxima 6/30/2020 4/15/2019 3/11/2019 TBD 08/01/2019 COMPLETE 4/1/2020 16-20 weeks
Murano 6/30/2020 5/15/2020 5/15/2019 TBD 05/15/2020 COMPLETE 4/1/2020 16-20 weeks
NV1500/2500/3500 6/30/2020 4/15/2020 4/15/2020 TBD 04/15/2020 COMPLETE 5/1/2020 16-20 weeks
NV Cargo/Passenger 6/30/2020 4/15/2019 3/11/2019 TBD 07/01/2019 COMPLETE 5/1/2020 16-20 weeks
NV200 6/30/2020 5/15/2019 5/9/2019 TBD 09/02/2019 COMPLETE 4/1/2020 16-20 weeks
Pathfinder 6/30/2020 5/15/2019 5/15/2019 TBD 09/02/2019 TBD TBD 16-20 weeks
Rogue 6/30/2020 4/15/2019 3/11/2019 TBD 07/01/2019 COMPLETE 3/1/2020 16-20 weeks
Rogue Sport 6/30/2020 4/15/2019 3/11/2019 11/26/2019 11/01/2019 COMPLETE 3/1/2020  
Sentra 6/30/2020 9/2/2019 TBD TBD 01/02/2020 COMPLETE 4/1/2020 12-20 weeks
Titan 6/30/2020 8/15/2019 7/25/2019 TBD 12/02/2019 COMPLETE 4/1/2020 16-20 weeks
Versa Sedan 6/30/2020 3/15/2019 3/11/2019 TBD 06/03/2019 COMPLETE 4/1/2020 16-20 weeks
370Z Coupe 6/30/2020 2/15/2019 TBD TBD 04/01/2019 COMPLETE COMPLETE 16-20 weeks
370Z Roadster 6/30/2020 TBD TBD TBD 04/01/2019 TBD TBD 16-20 weeks
Model Last Updated Order Banks Open ETA for Data Available to Order Pricing Release Date Start of Production Last Date to Submit Orders to Merchants Build Out Date Average Lead Time Important Updates

>> Back to Top

Ram

Model Last Updated Order Banks Open ETA for Data Available to Order Pricing Release Date Start of Production Last Date to Submit Orders to Merchants Build Out Date Average Lead Time Important Updates
1500 DT (New Models) 05/06/2020 06/06/2019 06/26/2019 06/20/2019 07/22/2019 5/28/2020 8/29/2020 8-10 weks
1500 Quad & Crew DS 05/06/2020 11/05/2019 11/13/2019 11/05/2019 11/25/2019 10/1/2020 12/18/2020 8-10 weeks
1500 Regular DS 05/06/2020 11/05/2019 11/13/2019 11/05/2019 01/02/2020 10/1/2020 12/23/2020 12-14 weeks
2500 Pickup 3500 Pickup & Chassis 05/06/2020 10/02/2019 10/04/2019 09/26/2019 11/25/2019 7/30/2020 10/11/2020 12-14 weeks Low Volume Pain Build Out is 6/11/2020.
4500/5500 Chassis Cabs 05/06/2020 10/08/2019 10/19/2019 10/03/2019 11/25/2019 7/30/2020 10/11/2020 12-14 weeks Low Volume Pain Build Out is 6/11/2020.
ProMaster 05/06/2020 06/06/2019 06/21/2019 06/11/2019 09/30/2019 CLOSED 8/22/2020 22-24 weeks
ProMaster City 05/06/2020 06/06/2019 05/27/2019 06/11/2019 07/29/2019 5/28/2020 8/1/2020 18-20 weeks
Model Last Updated Order Banks Open ETA for Data Available to Order Pricing Release Date Start of Production Last Date to Submit Orders to Merchants Build Out Date Average Lead Time Important Updates

>> Back to Top

Subaru

Model Last Updated Order Banks Open ETA for Data Available to Order Pricing Release Date Start of Production Last Date to Submit Orders to Merchants Build Out Date Average Lead Time Important Updates
Ascent 06/25/2020 05/16/2019 TBD 05/16/2019 07/01/2019 CLOSED CLOSED 14 - 16 weeks Orders placed between Build out and last date to submit will be on a will try only basis
BRZ 06/25/2020 08/16/2019 TBD 08/15/2019 N/A N/A 14 - 16 weeks no 2021 model
Crosstrek 06/25/2020 10/01/2019 10/31/2019 10/03/2019 12/01/2019 CLOSED CLOSED 14 - 16 weeks Orders placed between Build out and last date to submit will be on a will try only basis
Legacy 06/25/2020 07/15/2019 TBD 07/11/2019 11/01/2019 CLOSED 7/21/2020 14 - 16 weeks Orders placed between Build out and last date to submit will be on a will try only basis
Forester 06/25/2020 08/27/2019 TBD 08/29/2019 10/01/2019 CLOSED 7/21/2020 14 - 16 weeks Orders placed between Build out and last date to submit will be on a will try only basis
Impreza 06/25/2020 10/01/2019 10/19/2019 10/03/2019 11/01/2019 CLOSED 7/21/2020 14 - 16 weeks Orders placed between Build out and last date to submit will be on a will try only basis
Outback 06/25/2020 07/15/2019 TBD 07/11/2019 11/01/2019 CLOSED 7/21/2020 14 - 16 weeks Orders placed between Build out and last date to submit will be on a will try only basis
WRX/STi 06/25/2020 08/15/2019 TBD 05/15/2019 10/01/2019 11/1/2020 12/31/2020 14 - 16 weeks Orders placed between Build out and last date to submit will be on a will try only basis
Model Last Updated Order Banks Open ETA for Data Available to Order Pricing Release Date Start of Production Last Date to Submit Orders to Merchants Build Out Date Average Lead Time Important Updates

>> Back to Top

Toyota

Model Last Updated Order Banks Open ETA for Data Available to Order Pricing Release Date Start of Production Last Date to Submit Orders to Merchants Build Out Date Average Lead Time Important Updates
4Runner 02/11/2020 06/10/2019 5/31/2019 TBD 08/29/2019 04/24/2020 05/08/2020 17-19 weeks
Avalon 02/11/2020 05/10/2019 5/3/2019 TBD 07/30/2019 04/03/2020 04/10/2020 8-12 weeks
Avalon Hybrid 02/11/2020 05/10/2019 5/3/2019 TBD 07/30/2019 04/03/2020 04/10/2020 8-12 weeks
Camry 02/11/2020 06/10/2019 5/31/2019 TBD 08/29/2019 06/03/2020 06/10/2020 8-12 weeks
Camry Hybrid 02/11/2020 06/10/2019 5/31/2019 TBD 08/29/2019 06/03/2020 06/10/2020 8-12 weeks
C-HR 02/11/2020 08/12/2019 7/6/2019 TBD 10/30/2019 05/04/2020 05/11/2020  
Corolla 02/11/2020 12/15/2018 12/4/2018 2/27/2019 03/29/2019 01/03/2020 01/10/2020 8-15 weeks
Corolla Hybrid 02/11/2020 01/10/2019 01/03/2020 01/10/2020
Corolla Hatchback 02/11/2020 07/10/2019 7/5/2019 TBD 09/30/2019 03/04/2020 03/11/2020 12-16 weeks
Highlander Gas 02/11/2020 09/10/2019 10/28/2019 12/13/2019 11/29/2019 06/03/2020 06/10/2020 10-12 weeks
Highlander Hybrid 02/11/2020 11/11/2019 10/28/2019 12/13/2019 01/31/2020 06/03/2020 06/10/2020  
Land Cruiser 02/11/2020 06/10/2019 TBD TBD 08/29/2019 03/04/2020 03/11/2020 12-16 weeks
Mirai (fuel cell) 02/11/2020 09/10/2019 TBD TBD 11/29/2019 08/04/2020 08/11/2020  
Prius 02/11/2020 06/10/2019 TBD TBD 08/29/2019 04/03/2020 04/10/2020 16-20 weeks
Prius Prime 02/11/2020 03/12/2019 3/5/2019 TBD 05/31/2019 04/03/2020 04/09/2020 16-20 weeks
RAV4 10/15/1908 06/10/2019 5/30/2019 TBD 08/29/2019 05/04/2020 05/11/2020 8-12 weeks
RAV4 Hybrid 03/11/2020 06/10/2019 TBD TBD 08/29/2019 05/11/2020 8-12 weeks 3/11/2020 = current fleet demand for RAV4 Hybrid is outpacing supply. In order to fulfill current MY20 orders and meet delivery expectations, Toyota Fleet has suspended RAV4 Hybrid orders as of March 11, 2020 for MY20
Sequoia 02/11/2020 05/10/2019 TBD TBD 07/30/2019 04/03/2020 04/10/2020 16-20 weeks
Sienna 03/11/2020 01/03/2019 1/31/2019 TBD 03/29/2019 03/11/2020 8-10 weeks 3/11/2020 = Due to build out restrictions for MY20 Sienna, the last order date is being moved from 4/10/2020 to 03/11/
Supra 02/11/2020 01/10/2019 TBD TBD 03/29/2019 12/03/2019 12/10/2019  
Tacoma 02/11/2020 06/10/2019 TBD TBD 08/29/2019 05/04/2020 05/11/2020 16-20 weeks
Tundra 02/11/2020 05/11/2019 5/9/2018 TBD 07/30/2019 04/03/2020 04/10/2020 8-16 weeks
Yaris Sedan/Hatchback 02/11/2020 05/11/2019 5/3/2019 TBD 07/31/2019 04/03/2020 04/10/2020 12-16 weeks
Model Last Updated Order Banks Open ETA for Data Available to Order Pricing Release Date Start of Production Last Date to Submit Orders to Merchants Build Out Date Average Lead Time Important Updates

>> Back to Top

Volkswagen

Model Last Updated Order Banks Open ETA for Data Available to Order Pricing Release Date Start of Production Last Date to Submit Orders to Merchants Build Out Date Average Lead Time/Order to Dealer Delivery Important Updates
Arteon 07/15/2020 TBD TBD TBD 01/06/2020 CLOSED CLOSED 01/21/2021  
Atlas 07/15/2020 TBD TBD TBD 12/16/2019 CLOSED CLOSED 01/11/2021 3.6L engine starts production January 20, 2020. 
Atlas Cross Sport 07/15/2020 1/17/2020 1/24/2020 TBD 01/06/2020 7/22/2020 CLOSED 01/11/2021  
eGolf 07/15/2020 TBD TBD TBD 10/28/2019 TBD CLOSED 01/21/2021  
Golf 07/15/2020 12/16/2019 TBD TBD 12/16/2019 CLOSED CLOSED 01/21/2021  
GTI 07/15/2020 12/16/2019 TBD TBD 10/28/2019 CLOSED CLOSED 01/21/2021  
Jetta 1.4T/GLI 07/15/2020 1/17/2020 TBD TBD 10/28/2019 7/20/2020 CLOSED 01/21/2021  
Passat 07/15/2020 12/2/2019 TBD TBD 09/04/2019 7/22/2020 CLOSED 01/11/2021 1.4 & GLI
Tiguan 07/15/2020 7/31/2019 10/15/2019 TBD 08/19/2019 CLOSED CLOSED 01/21/2021  
Model Last Updated Order Banks Open ETA for Data Available to Order Pricing Release Date Start of Production Last Date to Submit Orders to Merchants Build Out Date Average Lead Time/Order to Dealer Delivery Important Updates

>> Back to Top

Volvo

Model Last Updated Order Banks Open ETA for Data Available to Order Pricing Release Date Start of Production Last Date to Submit Orders to Merchants Build Out Date Average Lead Time Important Updates
S60 01/27/2020 4/15/2019 TBD TBD 5/15/2019 TBD TBD 12-16 weeks
S90 01/27/2020 TBD TBD TBD 5/15/2019 TBD TBD 18-20 weeks
V60 01/27/2020 4/15/2019 TBD TBD 5/15/2019 TBD TBD 12-16 weeks
V90 01/27/2020 4/15/2019 TBD TBD 5/15/2019 TBD TBD 12-16 weeks
XC40 01/27/2020 4/1/2019 TBD TBD 4/22/2019 TBD TBD 12-16 weeks
XC60 01/27/2020 4/15/2019 TBD TBD 5/15/2019 TBD TBD 12-16 weeks
XC90 01/27/2020 4/15/2019 TBD TBD 5/15/2019 TBD TBD 12-16 weeks
Model Last Updated Order Banks Open ETA for Data Available to Order Pricing Release Date Start of Production Last Date to Submit Orders to Merchants Build Out Date Average Lead Time Important Updates

>> Back to Top